Records from 2016 to 2026. Most recent: inspection, 4 May 2026.
Documentation record
Registered dimensions (L × B × D)65.0 ft × 20.0 ft × 6.3 ft
Registered tonnagegross 54 / net 43
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderSUNSPLASH MARINA LLC · TUCKAHOE, NJ, UNITED STATES · built 2011
Hull materialAluminum
PropulsionJet Drive
Hull shapeShip
Hull configurationMonohull
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 12 December 2025 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it54 - Simplified, Gross Ton
43 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 21
4 May 2026
COI Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8357307
24 April 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8118276
19 March 2025
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8095787
29 April 2024
Internal Structural Exam · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7903079
29 April 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7903390
25 April 2023
Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7609084
31 March 2023
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7660618
15 March 2023
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7650921
28 April 2022
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7439728
10 May 2021
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7190527
9 April 2021
Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7172893
14 July 2020
Internal Structural Exam · Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7005947
23 April 2019
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6668208
25 March 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6648374
15 May 2018
Internal Structural Exam · Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6398049
21 February 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6358766
13 April 2017
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6123463
11 April 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6122218
22 March 2017
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6111191
20 July 2016
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 5962243
21 April 2016
COI Inspection · DAPI Audit
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5859096
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 May 2026
Resolved
A vessel must be provided with a satisfactory arrangement for draining any watertight compartment, other than small buoyancy compartments, under all practicable conditions. Bilge system in fuel void inoperable. Verify system operation in presence of Marine inspector prior to carriage of passengers.
46 CFR 182.500 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 May 2026
Resolution: Deficiency check was conducted in the presence of 02 marine inspectors. Vessel component was seen in proper working condition.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 April 2025
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station: A means to reset devices used to automatically shut down ventilation systems and engines... After testing the pre-engineered fire extinguishing system, MIs observed that the vessel was unable to start the engines as part of the override. Rectify deficiency prior to the carriage of passengers.
46 CFR 181.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2025
Resolution: Saw sat operaiton of overrides.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 25 April 2023
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station: a means to reset devices used to automatically shut down ventilation systems and engines as required by paragraph (a)(3) of this section. The fireboy's override switch is inoperable.
(46CFR181.420(b)(3) (701c))
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 May 2023
Resolved 2 May 2023
Resolution: Call out conducted. Witnessed satifactory test of system
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 April 2023
Resolved
All cable and wire must: Be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling and not used as a means of support.
(46CFR183.340 (50c))
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2023
Resolved 29 April 2024
Resolution: Completed and examined by qualfied T-vessel inspector.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 April 2023
Resolved
The use of twist-on type wire nuts is permitted under the following conditions: The connections must be made within an enclosure and the insulated cap of the connector must be secured to prevent loosening due to vibration. Vessel is using wing-nuts on batteries.
(46CFR183.340(i)(1) (50c))
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 29 April 2024
Resolution: Completed and examined by qualfied T-vessel inspector.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 10 May 2021
Resolved
The Certificate of Inspection must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. If posting is impracticable, such as an open boat, the certificates must be kept on board in a weathertight container readily available for use by the crew and display to passengers and others on request. Vessel's COI was not posted or readily available in a weathertight container on board.
46CFR176.302
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2021
Resolved 1 June 2021
Resolution: Attended vessel, verified proper posting of certificates.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 10 May 2021
Resolved
The Stability Letter must be posted under glass or other suitable transparent material, such that all pages are visible, in a conspicuous place on the vessel where observation by passengers is likely. If posting is impracticable, such as an open boat, the certificates must be kept on board in a weathertight container readily available for use by the crew and display to passengers and others on request. Vessel's Stability Letter was not posted or readily available in a weathertight container on board.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2021
Resolved 1 June 2021
Resolution: Attended vessel, verified proper posting.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 15 May 2018
Resolved
A vessel on which a pre-engineered fixed gas fire extinguishing system is installed must have the following equipment at the operating station: An audible alarm that sounds upon discharge. Fireboy fire suppression system does not have an audible alarm upon discharge.
Action required: 705 - Other - as specified
Due 22 May 2018
Resolved 23 May 2018
Resolution: System test sat
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 May 2018
Resolved
02 cracks were discovered in the top of welds in the #3 void space on the aft bulkhead and 03 cracks were discovered in the top of welds in the #4 void space on the fwd bulkhead.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2018
Resolved 23 May 2018
Resolution: Visual inspection sat
Documentation › Certificates/Documents › Certificate of Inspection
Issued 15 May 2018
Resolved
Each vessel inspected and certificated under the provisions of this subchapter must, when any passengers are aboard during the tenure of the certificate, be in full compliance with the terms of the certificate. The COI requires wind and wave height data be logged in the logbook prior to trip. No such entries are present.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2018
Resolved 14 June 2018
Resolution: Log entries verified. See documents