← All vessels
SEA BRAVERY
SEA BRAVERY is a 2008 freight ship. The Coast Guard has recorded 9 inspections since 2008, most recently in August 2025, along with 5 deficiencies and 2 operational controls.
Records from 2008 to 2025. Most recent: inspection, 14 August 2025.
- Built
- 2008
- Last inspected
- 14 August 2025
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 5 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
9386407 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
V7A2082
990271
Flag
MARSHALL ISLANDS
—
Maury page id
psix-990271
Inspections, by type
…with no type recorded2
Years with a record
6 calendar years (2008–2025)
The 9 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.
Documentation record
Tonnage as PSIX records it32379 - Convention (Subpart B), Gross Ton
19353 - Convention (Subpart B), Net Ton
58722 - Dead Weight, Metric Ton
67814 - Displacement, Metric Ton
19353 - Convention (Subpart B), Net Ton
58722 - Dead Weight, Metric Ton
67814 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 9
14 August 2025
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8209674
25 March 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7656789
22 July 2022
PSC B
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7513223
29 July 2019
Ballast Water Examination · ISPS II Exam · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6758167
26 July 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6763288
23 July 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6759858
27 October 2014
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5007876
18 November 2008
PII Safety Exam · MARPOL Annex V Examination · ISPS II Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3360895
10 November 2008
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3360909
Deficiency record · 5
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 22 July 2022
Resolved
A fixed fire-extinguishing system required by paragraph 5 below may be any of the the following systems: a fix high expansion foam fire-extinguishing system complying with the provisions of the FSS Code. PSCO observed low expansion foam analysis certificate for space space requiring high expansion foam.
SOLAS (2004) II-2/10.4.1.1.2
FSS CODE 3.1.19
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 22 July 2022
Resolved
Electrical installations shall be such that: The safety of passengers, crew, and ship from electrical hazard will be ensured. PSCO observed expose electrical wiring for explosion proof light fixture in paint locker.
SOLAS (2004) II-1/40.1.3
Engineering › Sea-water System (primary cooling) › Piping
Issued 27 October 2014
Resolved
The Machinery, boilers, and other associated piping systems shall be of a design and construction adequate for the service they are intended. The air cooler sea water outlet line has soft patches drawing #SC082 M-WM Main Cooling S.W. system p.46 pipe 150 WM010 Cool S.W. out. 74 SOLAS (04 CONS) II-I/26.1 Code 1400
Fire Fighting › Structural - A Class Divisions › Fire Doors
Issued 27 October 2014
Resolved
Doors required to be self closing shall not be fitted with hold-back hoks. Fire door into galley had a manual hold back.
Deck/Cargo › Mooring/Anchoring › Brake
Issued 18 November 2008
Resolved
Port anchor windlass was reported by vessel to be inoperative. CG inspector confirmed equipment status onboard with company surveyor.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.