Records from 2011 to 2016. Most recent: inspection, 14 July 2016.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 7
14 July 2016
Deficiency Check
Physical examination · Activities Europe · Activity 5940303
8 August 2014
Drydock Exam
Physical examination · Activities Europe · Activity 4874042
9 June 2014
Drydock Extension
Administrative · Activities Europe · Activity 4887626
1 May 2014
Annual Inspection · MARPOL Annex I Examination · DAPI Audit · MARPOL Annex VI Survey · MARPOL Annex V Examination · MTSA/ISPS Verification
Physical examination · Activities Europe · Activity 4856234
23 July 2012
MARPOL Annex I Examination · MTSA/ISPS Verification · DAPI Audit · Internal Structural Exam · Periodic Inspection · MARPOL Annex VI Survey
Physical examination · Activities Europe · Activity 4369794
24 June 2012
Internal Structural Exam · Drydock Exam
Physical examination · Activities Europe · Activity 4273490
7 December 2011
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4203707
Electrical › Electrical Distribution System (service) › Junction Box
Issued 1 May 2014
Resolved
ENSURE ELECTRICAL JUNCTION BOX IN SPACE BELOW DECK IN GALLEY HAS A COVER PLATE TO SEAL THE BOX
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 June 2014
Resolved 8 August 2014
Stability › Watertight Integrity › Weathertight Enclosure
Issued 1 May 2014
Resolved
ELECTRICAL CABLE RUN INTO ENGINE ROOM BACK TO STEERING ROOM MUST BE WATERTIGHT
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 June 2014
Resolved 8 August 2014
Electrical › Electric Supply System (service) › Reverse Current Protection
Issued 1 May 2014
Resolved
MUST PROVE GENERATORS CAN BE PARALLELED AND REVERSED POWER RELAY
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 June 2014
Resolved 8 August 2014
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 23 July 2012
Resolved
Ensure all engines have EIAPP certificates. Remains open for verification on next annual exam. Ensure proper EIAPP and TECH FILE are completely incorporated. Master stated onboard 1Aug12.
Due 16 September 2013
Resolved 4 June 2013
Resolution: Cleared but but reissued with AN 4584215 as EIAPP for the main engines is the wrong IMO family number.
Documentation › Logs/Records › Record Book of Engine Parameters
Issued 23 July 2012
Resolved
Ensure record book of engine parameters and parts replacement list is updated to indicate maintenance from 2010-present. Master stated appropraite onboard on 1Aug12. (Remains open for verification on next annual exam. Ensure proper EIAPP and TECH FILE are completely incorporated)
Due 16 September 2013
Resolved 4 June 2013
Resolution: Cleared but reissued with AN 4584215 as EIAPP for main engines was wrong IMO family number.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 23 July 2012
Resolved
Conduct internal ISM audit due to faults found onboard ie...CSR update, EIAPP certs missing, and missing record book of engine perameters in technical files.
Due 23 August 2012
Resolved 1 August 2012
Resolution: Cleared due to adequate evidence provided by Master.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 23 July 2012
Resolved
Insert ampacity in panel registers in distribution panels and motor controllers have schematic diagrams as per IEEE 45.
Due 23 August 2012
Resolved 23 July 2012
Resolution: Registers ampacity marked on site and schematics procured for installation.
Documentation › Logs/Records › Bunker Delivery Notes/Samples
Issued 23 July 2012
Resolved
Ensure samples are saved for one year and delivery notes are saved for three years as per MARPOL annex VI/14&18. Ensure training for Chief Engineer. (Remains open for verification on next annual exam. Verify cross check of a) oil record book b) bunker notes and c)samples)
Due 16 September 2013
Resolved 4 June 2013
Resolution: All sat
Fire Fighting › Miscellaneous Items › Paint/Flammable Liquid Lockers
Issued 23 July 2012
Resolved
Ensure paint and flammable liquid lockers are adequate for amount of paint carried (paint now stowed on deck) and all flammable liquids (including aerosol cans). This locker must be constructed of steel or equivalent material, or wholly lined with steel or equivalent material.
Due 23 August 2012
Resolved 21 November 2012
Resolution: Email from [name withheld] to clear.
Lifesaving › Launching Appliances › Release Mechanism
Issued 23 July 2012
Resolved
Ensure all hydrostatic releases are USCG approved.
Due 23 August 2012
Resolved 1 August 2012
Resolution: Cleared due to adequate evidence provided by Master.
Lifesaving › Rescue Boat Equipment › Searchlight
Issued 23 July 2012
Resolved
Place search light on battery on maintenance schedule in order to ensure function.
Due 23 August 2012
Resolved 1 August 2012
Resolution: Cleared due to adequate evidence provided by Master.
Electrical › Electrical Distribution System (service) › Cable
Issued 23 July 2012
Resolved
Properly secure bow thruster heater cable.
Due 23 August 2012
Resolved 21 November 2012
Resolution: Email from [name withheld] to clear.
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 23 July 2012
Resolved
Provide EAP training for supervisors and general crew training.
Due 23 August 2012
Resolved 21 November 2012
Resolution: Email from [name withheld] to clear.