Records from 2017 to 2026. Most recent: inspection, 30 March 2026.
Inspection history · 9
30 March 2026
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8334546
15 March 2026
PSC B · COC-TVE Renew
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8319331
9 March 2026
COE-Administrative
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8334096
10 June 2024
PSC B · COC-TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7926762
15 February 2022
PSC B · COC-TVE Renew
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 7396424
22 December 2019
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 6874357
5 September 2018
ISPS II Exam · COC-TVE Renew · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6533296
13 March 2017
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6104066
9 February 2017
Deficiency Check · Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6085696
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 March 2026
Resolved
Electrical installations shall be such that the safety of passengers, crew, and ship from electrical hazards will be ensured.
PSCO observed more than 5 electrical breakers installed at an amperage higher than the designed amperage raring in the ECR and EDG spaces.
74SOLAS(04) II-1/40/1.3
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 March 2026
Resolved 30 March 2026
Resolution: PSCO received Class (BV) report attesting to the rectification of deficiency.
Deck/Cargo › Inert Gas System › Scrubber Tower
Issued 20 February 2017
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. IGS is leaking IG into space and soft patches on the scrubber body. SOLAS74(2014 CONS.) I/11(a) 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 February 2017
Resolution: Received scanned copy of BV class report attesting to the repair. See "documents" for class report.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 15 February 2017
Resolved
Cargo pump #1 and #2 have leaking mechanical seals and fittings allowing cargo to enter pump room.
74SOLAS(2014 CONS ED.) 1/11(a) - 60ac
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 February 2017
Resolution: Agent has provided a copy of class report from BV attesting to the rectification of the deficiency. See class report in "documents".
Deck/Cargo › Inert Gas System › IGS Scrubber
Issued 15 February 2017
Resolved
Inert gas system is leaking IG into space and there are several pin hole leaks and soft patches on the scrubber. 74SOLAS(2014 CONS ED.) 1/11(a) - 60ac
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 February 2017
Resolution: Agent has provided a copy of class report from BV attesting to the rectification of the deficiency. See class report in "documents".
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 15 February 2017
Resolved
Three of the vessel's VCS pins were not permanently affixed.
46CFR39.2001(j) - 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 March 2017
Resolution: Received Class Survey attesting to the repairs of the IG system piping.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type II
Issued 15 February 2017
Resolved
MSD has pinhole leaks and several soft patches on the body and piping. 74Solas(2014Cons)1/11a - 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 13 March 2017
Resolution: Received satisfactory Class Survey.