Records from 2011 to 2021. Most recent: inspection, 12 March 2021.
Documentation record
Tonnage as PSIX records it2212 - Convention (Subpart B), Gross Ton
692 - Convention (Subpart B), Net Ton
2212 - Regulatory (Subpart C or D), Gross Ton
3135 - Dead Weight, Metric Ton
3933 - Displacement, Metric Ton
692 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 7
12 March 2021
PSC A
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7150894
19 February 2016
Deficiency Check
Physical examination · Activities Europe · Activity 5818043
14 May 2014
Type not recorded
No type recorded · Activities Europe · Activity 4858227
4 May 2012
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4327525
13 January 2012
Construction Oversight · Administrative Inspection · Initial Certification · Plan Review (Other than "T")
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 4234684
11 August 2011
Plan Review (Other than "T")
Administrative · USCG Heartland District (dp) · USCG Heartland District (CGD-H) · Activity 4398356
2 February 2011
MTSA/ISPS Verification · MARPOL Annex I Examination · Administrative Inspection · Welding Related Inspections Qualification Testing · Construction Oversight · Initial Certification
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 3937880
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 15 May 2012
Resolved
Provide OCMI with valid/updated Certificate of Documentation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2012
Documentation › Certificates/Documents › Certificate of Fitness (OSVs)
Issued 15 May 2012
Resolved
vessel may not load any chemicals/NLS related to well stimulation project without OCMI approval pending review/approval of tank arrangement by TVO branch at MSC & OCMI issuing Certificate of Fitness for chemical carriage.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2012
Deck/Cargo › Holds/Tanks › Cargo Tank Arrangement/Size
Issued 15 May 2012
Resolved
Provide OCMI with outstanding MSC plan approval letters for well stim package prior to loading any chemicals/nls on vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2012
Documentation › Manuals/Policy Documentation › Procedures and Arrangements Manual (NLS)
Issued 15 May 2012
Resolved
Provide Approved P&A Manula prior to loading any chemical/NLS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 June 2012
Documentation › Certificates/Documents › Certificate of Inspection
Issued 9 May 2012
No resolution recorded
***09 May2012 Deficiency is stayed by MSU Houma pending appeal to D8/Headquarters***
All well stimulation operations are to be conducted under the vessel's industrial service under 46 CFR subchapter I and not their offshore supply vessel service under 46 CFR subchapte L. All questions concerning this 835 should be directed to [name withheld], MSU Houma Chief of Inspections.
Action required: 705 - Other - as specified
Construction/Loadline › Structures › Superstructure
Issued 2 February 2011
Resolved
Vessel's navigation bridge visibility does not meet SOLAS requirement for bridge wings affording a view down the vessel's side.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2012
Resolved 23 March 2012
Fire Fighting › Structural - A Class Divisions › Control Stations
Issued 2 February 2011
Resolved
SFP boundary for deck between bridge consoles and electronics rooms below is inadequate b/c spaces were treated as extension of bridge. Plans have been resubmitted and boundaries are to be made compliant with approved plans.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2012
Resolved 23 March 2012
Engineering › Freshwater System (jacketwater cooling) › Sensor
Issued 2 February 2011
Resolved
Unable to test high jacket water temperature alarm in accordance with approved automation test procedures. Must provide means to test appropriately.
Action required: 17 - Rectify deficiencies prior to departure
Due 21 February 2012
Resolved 5 April 2012
Resolution: Tested IAW approved Periodic test procedures