The 4 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 4 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Share this recordDownload vessel cardDownload QRMaury, US Coast Guard vessel record for TENJUN, retrieved 18 September 2026. mauryrecords.com/v/psix-993377.html
Documentation record
Tonnage as PSIX records it159927 - Convention (Subpart B), Gross Ton 97999 - Convention (Subpart B), Net Ton 344102 - Displacement, Ton 302107 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
A report is not offered for this hull: Its record holds only 1 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 4
9 April 2022PSC B · COC-TVE Renew
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7423218
8 December 2016COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 6053860
20 July 2011ISPS II Exam · COC-TVE Renew
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4071353
1 January 2009ISPS II Exam · COC-TVE Renew
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 3387419
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 9 April 2022Resolved
NO ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN ANY SPACE WHERE FLAMMABLE MIXTURES ARE LIABLE TO COLLECT INCLUDING THOSE ONBOARD TANKERS OF A TYPE WHICH WILL NOT IGNITE THE MIXTURES CONCERNED. PSCO OBSERVED 05 EXPLOSION PROOF LIGHT FIXTURE CASINGS THAT WERE CRACKED IN THE CARGO PUMP ROOM.
74 SOLAS (04) II-I/45.10.2
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 11 June 2022
Resolution: Vsl submitted class survey attesting to the repair of the lights in the cargo pump room.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 9 April 2022Resolved
WHERE THE ATMOSPHERE IN DOUBLE HULL SPACES CANNOT BE RELIABLY MEASURED USING FLEXIBLE GAS SAMPLING HOSES, SUCH SPACES SHALL BE FITTED WITH PERMANENT GAS SAMPLING LINES. THE CONFIGURATION OF GAS SAMPLING LINES SHALL BE ADAPTED TO THE DESIGN OF SUCH SPACES.
THE FIXED GAS SAMPLING SYSTEM WAS OBSERVED TO BE OUT OF CALIBRATION BY PSCO.
74SOLAS(04) II-2/4.5.7.2.2
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 9 April 2022
Resolved 9 April 2022
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 9 April 2022Resolved
DOORS REQUIRED TO BE SELF-CLOSING SHALL NOT BE FITTED WITH HOLD-BACK HOOKS. PSCO OBSERVED 3 SELF-CLOSING FIRE DOORS ABOVE THE "A" DECK CORRIDOR WITH HOLD-BACK HOOKS.
74SOLAS(04)II-2/9.4.2.2
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 9 April 2022
Resolved 9 April 2022
Deck/Cargo › Inert Gas System › IGS Blower
Issued 1 January 2009Resolved
Blower discharge high temperature alarm failed on the IGS. This caused the entire system to fail.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 January 2009
Resolution: CG verified proper operation of IGS
Electrical › Electric Generation Source (emergency) › Generator
Issued 1 January 2009Resolved
The secondary starting arrangment for the emergency generator is inoperable due to broken starter. Emergency Generator is still opertional with battery start.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 April 2010
Resolved 12 April 2010
Resolution: replacement starter on board.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.