Records from 2009 to 2025. Most recent: inspection, 13 November 2025.
Documentation record
Registered dimensions (L × B × D)130.0 ft × 40.0 ft × 11.2 ft
Registered tonnagegross 489 / net 489
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJAMES BUILT LLC · CALVERT CITY, KY, UNITED STATES · built 2009
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portNEW ORLEANS, LA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 13 November 2025 · expires 31 October 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it480 - Dead Weight, Ton
489 - Simplified, Gross Ton
489 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
13 November 2025
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 8264636
28 August 2024
Administrative Inspection · Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7991432
16 February 2024
Internal Structural Exam · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7867300
21 September 2023
Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7796189
12 August 2022
COI Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7531691
21 June 2022
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7484289
8 July 2021
Administrative Inspection · Annual Inspection · MTSA Verification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7249366
21 May 2020
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6963411
26 February 2019
Examination of Repairs · Internal Structural Exam · COI Inspection · Administrative Inspection · MTSA Verification · Drydock Exam · Cargo Tank Internal
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 6632538
29 June 2018
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6459590
21 July 2017
Administrative Inspection · Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6216095
1 August 2016
Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5962517
27 July 2015
Annual Inspection · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 5962524
30 April 2014
Administrative Inspection · MTSA Verification · Internal Structural Exam · Deficiency Check · COI Inspection · Examination of Repairs
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4847363
4 February 2014
Damage Survey · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4795686
4 February 2014
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4797724
7 November 2013
Annual Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4749237
23 October 2012
Periodic Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4471906
28 September 2011
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4156591
29 November 2010
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3900317
12 October 2010
Annual Inspection
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 3868211
7 July 2010
Administrative Inspection
Administrative · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3788657
21 August 2009
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3573349
4 May 2009
Cargo Tank Internal · Initial Certification · Initial Construction-Excluding Oversight · Internal Structural Exam · Welding Related Inspections Qualification Testing · Administrative Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 3467433
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 3 September 2024
Resolved
(1) Each nonmetallic transfer hose must: Not burst, bulge, leak, or abnormally distort under static liquid pressure at least 1-1/2 times the MAWP. (2) Each transfer system relief valve must open at or below the pressure at which it is set to open. (3) Each pressure gauge must show pressure within 10 percent of the actual pressure (4) Each loading arm and each transfer pipe system, including each metallic hose, must not leak under static liquid pressure at least 1-1/2 times the MAWP; and (5) Each item of remote operating or indicating equipment, such as a remotely operated valve, tank level alarm, or emergency shutdown device, must perform its intended function.
(f) The frequency of the tests and inspections required by this section must be:(3) For vessels, annually.
Non-metallic hoses, transfer piping and relief valve have not been subjected to annual hydrostatic MAWP test. Emergency shutdown device is inoperable.
Complete annual MAWP testing and repair emergency shutdown device.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 September 2024
Resolution: Received objective evidence of hose, pipeline and relief valve testing complete and satisfactory. Emergency shutdown device has been repaired to work more effectively/correctly.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 3 October 2023
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, boilers, and other pressure vessels and their appurtenances, piping, main and auxiliary machinery, electrical installations... and other equipment is in satisfactory condition and fit for the service for which it is intended.
Leak discovered on the forward cargo flow meter seal.
Troubleshoot and repair leak found on the forward cargo flow meter seal.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 October 2023
Resolved 17 October 2023
Resolution: Cargo pump seal has been renewed. Op test was satisfactory.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 3 October 2023
Resolved
The inspection shall be such as to insure that the vessel, as regards the structure, boilers, and other pressure vessels and their appurtenances, piping, main and auxiliary machinery, electrical installations... and other equipment is in satisfactory condition and fit for the service for which it is intended.
Hairline fractures found on prime mover engine mounts/tie-down brackets (2).
Renew prime mover engine mount/tie-down brackets (2).
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 November 2023
Resolved 17 October 2023
Resolution: All prime mover engine mounts have been renewed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 15 August 2022
Resolved
Cargo pump relief valves shall be tested at least once each year to determine that they function satisfactorily at the pressure at which they are set. Complete testing of diesel cargo pump relief valve.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 August 2022
Resolved 29 August 2022
Resolution: Installed new cargo pump relief valve.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 August 2022
Resolved
A pressure gauge shall be installed for each pump discharge, and it shall be located at a point visible with respect to pump controls. Vessels lube oil cargo and slop cargo pumps were not equipped with guages. Install gauges during next Internal Structural Exam, no later than 31 Mar 2024.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 March 2024
Resolved 28 April 2024
Resolution: Pressure gauge installed at union central to both cargo pumps.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 August 2022
Resolved
A pressure gauge shall be installed for each pump discharge, and it shall be located at a point visible with respect to pump controls. Diesel cargo pump gauge was fogged and unreadable.
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 August 2022
Resolved 19 August 2022
Resolution: Received photo evidence of instillation of new pressure gauge.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 12 August 2022
Resolved
All safety relief valves for use on pressure vessels shall be set to relieve at a pressure which does not exceed the maximum allowable working pressure of the pressure vessel. Prime mover start air receiver has a MAWP of 175 PSI but was equipped with a pressure relief valve set at 200 PSI. Provide relief valve set to relieve no higher than 175 PSI.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 29 August 2022
Resolved 19 August 2022
Resolution: Received photo of newly installed pressure relief valve set to 175 PSI.
Construction/Loadline › Hull › Side Shell
Issued 4 February 2014
Resolved
Make permanent repairs in way of port side mid ship nearest the third kevel starting from the deck working down on the side shell. The damage is approximately 4 ft long by 2 ft wide. The deepest part of the inset is estimated at 8 inches. As per 46 CFR 30.01-10
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 September 2014
Resolved 7 May 2014
Resolution: Cropped and renewed.