← Fleet names
A vessel name
CHANGE ORDER
2 hulls with a page on Maury carry or carried this name
· 171 documented vessels in the NVDC file dated 10 September 2026
Hulls with a page carrying this name
CHANGE ORDERCommercial Fishing Vessel · built 2007 · current recorded nameCHANGE ORDERPassenger (Uninspected) · built 2006 · ON 1187324 · current recorded name
Every hull listed has a page under Maury’s publication rule; a former name is one the Coast Guard
recorded at the time of an investigation. Hulls the archive holds and does not publish are counted below and never listed.
Documented vessels by service
| Service, as the file records it | Vessels |
|---|---|
| Recreational | 167 |
| Passenger (Uninspected) | 4 |
Counts over the National Vessel Documentation Center file as served by NOAA Fisheries, every service
included. Recreational vessels are counted and never listed: 167 of the 171 above are recreational,
and no page on Maury identifies one.
By hailing state
| State | Vessels |
|---|---|
| FL | 59 |
| MO | 14 |
| NJ | 8 |
| CA | 7 |
| AL | 6 |
| MD | 6 |
| NC | 6 |
| TX | 6 |
| WA | 6 |
| AK | 4 |
| CO | 4 |
| DE | 4 |