Records from 2008 to 2026. Most recent: inspection, 24 June 2026.
Inspection history · 43
24 June 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8413218
23 June 2026
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8413579
8 December 2025
Annual Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8278964
10 January 2025
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8061021
25 October 2024
MARPOL Annex I Examination · Hull Examination · Administrative Inspection · COI Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8026545
20 October 2024
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8021709
30 April 2024
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7904188
15 April 2024
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7895466
9 April 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7890373
14 December 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7839300
11 December 2023
Examination of Repairs · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7837610
3 May 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7680322
15 February 2023
Internal Structural Exam · Examination of Repairs · MTSA Verification · Periodic Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7616886
25 February 2022
Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7386247
1 April 2021
Administrative Inspection · Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7162897
1 February 2021
Examination of Repairs · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7134167
2 June 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6965935
29 May 2020
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6964011
18 February 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6910443
23 January 2020
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6890636
9 December 2019
Internal Structural Exam · Drydock Exam · Administrative Inspection · Cargo Tank Internal
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6868969
12 December 2018
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6596536
10 January 2018
Administrative Inspection · Periodic Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6335343
5 December 2017
Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6318803
31 October 2016
MARPOL Annex I Examination · MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6033434
16 May 2016
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5879069
17 November 2015
MARPOL Annex I Examination · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5765113
30 October 2014
Cargo Tank Internal · MTSA/ISPS Verification · Hull Examination · Plan Review (Other than "T") · COI Inspection · Drydock Exam · Administrative Inspection · MARPOL Annex I Examination · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5015230
3 January 2014
Annual Inspection · MARPOL Annex I Examination · MTSA Verification · Examination of Repairs
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4775462
3 January 2014
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4777182
2 January 2014
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4777154
20 December 2013
Permit to Proceed · Administrative Inspection · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4772222
17 December 2013
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4770773
17 December 2013
Damage Survey · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4770786
19 July 2013
Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4658116
5 July 2013
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4642819
2 November 2012
Administrative Inspection · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4477392
18 June 2012
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 4349202
20 January 2012
MARPOL Annex I Examination · Periodic Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4228773
26 November 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3901051
26 November 2010
Examination of Repairs · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3901171
17 August 2010
Type not recorded
No type recorded · Marine Safety Unit Wilmington · USCG East District (CGD-E) · Activity 3826931
11 November 2008
Initial Certification · Hull Examination · Construction Oversight · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3627418
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 24 June 2026
Resolved
Thermal fluid heaters are examined to determine that the complete unit is in a safe and satisfactory condition.
Vessel rep reported leak in #2 port cargo tank thermal oil coil in bottom of tank. Vessel restricted from carrying cargo in #2 port cargo tank, and restricted from carrying cargo that requires a fully operational thermal fluid heater. ABS to send report attesting to satisfactory condition of vessel upon completion of repairs.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 24 June 2026
Resolved 27 June 2026
Resolution: ABS attested to satisfactory repair and condition. 835 cleared.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 December 2024
Resolved
Any tank vessel which is equipped with an internal combustion engine driven cargo pump on the weather deck shall be provided with a minimum of one remote manual shutdown station, conspicuously marked, and located at the midpoint of such vessel, or 100 feet from the engine, whichever is the more practical. The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine (such as by cutting off the intake air). MI observed that the inboard cargo pump was not capable of being tested due to ongoing maintenance. Testing must be completed prior to using this motor for cargo operations.
46 CFR 32.50-35(a)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 December 2024
Resolution: Witnessed operation and successful emergency shutdown of motor.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 December 2024
Resolved
Operational tests and checks of all safety and limit controls, combustion controls, programming controls, and safety relief valves must be conducted by the owner, chief engineer, or person in charge at the inspection for certification, periodic inspection, and when directed by the Officer in Charge, Marine Inspection, to determine that the control components and safety devices are functioning properly and are in satisfactory operating condition. MI observed that neither TFH was capable of being tested due to ongoing maintenance. Vessel is restricted from carrying elevated temperature cargoes.
46 CFR 32.35-1
46 CFR 61.30-20
Action required: 705 - Other - as specified
Resolved 31 December 2024
Resolution: Tested both TFH.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 December 2024
Resolved
A fixed pressure-sensing device must be installed as close as practicable to the vessel vapor connection on a tank barge with a vapor collection system. The pressure-sensing device must measure the pressure vacuum in the main vapor collection line and have a pressure indicator located where the cargo transfer is controlled. MI observed that the port side vapor line did not have a pressure gauge.
46 CFR 39.2015
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 December 2024
Resolution: Pressure gauge was installed.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 27 December 2024
Resolved
Piping systems used where the fluid temperature exceeds 150 °F must be suitably insulated as necessary to preclude injury to personnel. MI observed all cargo piping insulation had been removed, and new insulation was not installed.
46 CFR 32.35-1
46 CFR 56.50-1(k)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 December 2024
Resolution: Insulation was installed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 December 2024
Resolved
Vapor collection piping must be electrically bonded to the hull and must be electrically continuous. MI observed all PV valve bonding straps were missing.
46 CFR 39.2001(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 December 2024
Resolution: Bonding straps were installed.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 27 December 2024
Resolved
The boundary bulkheads and decks separating the accommodations and control stations from cargo, and machinery spaces and from galleys, main pantries and storerooms other than small service lockers shall be of “A” Class Construction. MI observed electrical thru-hull penetrations between the BOSN store room to the TFH room were not appropriately sealed.
46 CFR 32.57-10(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2025
Resolved 31 December 2024
Resolution: Penetrations were properly sealed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 December 2024
Resolved
Each lifebuoy must be marked in block capital letters with the name of the vessel and the name of the port. In addition, the specified number of ring life buoys on board must be IAW NVIC 2-81ch2. MI observed that only 3 life buoys were present, when 5 were required, and all needed updated markings.
46 CFR 199.70(a)(2)
NVIC 2-81 CH. 2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 January 2025
Resolved 31 December 2024
Resolution: Life buoys were installed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 20 October 2024
Resolved
46 CFR 50.05-10
When alteration or repair of piping systems becomes necessary, the work shall be done under the cognizance of the Officer in Charge Marine Inspection.
Vessel has a leak in cargo piping on deck.
CODE 705: Vessel is authorized to enact temporary repairs to the satisfaction of class. Vessel is authorized to discharge cargo on board once temporary repairs are approved and shall enact permanent repairs to the satisfaction of attending USCG Marine Inspector prior to carriage of cargo.
Action required: 705 - Other - as specified
Due 20 October 2024
Resolved 27 December 2024
Resolution: Repaire during 2024 drydock. Cargo pipeline was pressure tested with nitrogen @225 psi. Pressure was held for 10 minutes with leaks or pressure drops observed.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 9 April 2024
Resolved
The high-level alarm required by paragraph (a) of this section must— activate an alarm once the cargo level reaches 95 percent of the tank capacity or higher, but before the tank overfill alarm.
Vessel representatives were unable to test high-level and overfill alarms for #2 stbd cargo tank, #4 stbd cargo tank, and #4 port cargo tank.
Vessel must rectify to the satisfaction of the Coast Guard prior to loading cargo.
Code705C- Next Scheduled Drydocking
Action required: 705 - Other - as specified
Due 9 April 2024
Resolved 15 April 2024
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 11 December 2023
Resolved
46 CFR 50.05-5 (a)
Whenever doubt exists as to the safety of an existing piping system, the marine inspector may require that it be gaged or checked to determine the extent of deterioration.
MI observed localized pitting in cargo pipe 90-degree elbow near STBD manifold. Vessel shall gage piping to determine extent of deterioration and submit report to local USCG OCMI.
Action required: 701 - Prior to carriage of passengers/cargo
Due 11 December 2023
Resolved 14 December 2023
Resolution: ABS report sent stating repairs were completed.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 3 May 2023
Resolved
All tank vessels, the construction or conversion after July 1, 1951, shall conform to the requirements in this subpart in construction of hulls. Barge representative reported a pinhole on the raised cargo trunk main deck at the number 4 port cargo tank. Permanent repair shall be completed prior to the onload of cargo in the number 4 port cargo tank to satisfaction of attending CG Marine Inspector.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 3 May 2023
Resolved 5 May 2023
Resolution: Received ABS report attesting to the repairs.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 1 April 2021
Resolved
46 CFR 42.15-45(d) Except as provided in paragraph (c) of this section ventilator openings shall be provided with efficient weathertight closing appliances. The relaxation of the requirement for closures on ventilation with coamings exceeding the specified heights for positions 1 and 2 is generally confined to stand alone or free standing ventilation situated on the weather deck and not those situated within the bulkheads of a deck house or superstructure. Replace two wasted gaskets on ventilators located above the port side machinery space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2021
Resolved 2 April 2021
Resolution: The gaskets were replaced in kind. Photo evidence of the replaced gaskets was provided via email by the vessel representative.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 April 2021
Resolved
46 CFR 31.35-1 Ground indicators must be at the vessel's ship's service generator distribution switchboard for the normal power, normal lighting, and emergency lighting systems; and be readily accessible. The system must have suitably sensitive ground detection system which indicates current in the ground connection, is able to withstand the max available fault current without damage, and provide continuous indication of circuit status to ground. Identified "C" phase bulb extinguished on the ground fault detection system located at the vessel's ship's service generator distribution switchboard. Troubleshoot extinguished bulb and provide outcome.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 May 2021
Resolved 21 April 2021
Resolution: The company electrician discovered that the transformer built in with the light was not operational. A like in kind transformer and light were purchased and placed into service. The ground fault lights are operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 February 2020
Resolved
When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect at the time the vessel was contracted for or built, or in accordance with the regulations in effect for new construction insofar as possible. Vessel reported a seized anchor windlass, which made it unable to pull up anchor. Prior to movement from MM 14, provide class report attesting to the satisfactory repairs and operational test of anchor windlass to the USCG Marine Inspector. 46 CFR 30.01-10
Action required: 60 - Rectify deficiencies prior to movement
Due 25 February 2020
Resolved 21 February 2020
Resolution: Vessel replaced Anchor Windlass motor. ABS Surveyed.
Deck/Cargo › Mooring/Anchoring › Anchor
Issued 16 May 2016
Resolved
Vessel lost single anchor while anchored at AMA Anchorage MM115. Your vessel is restricted to the [name withheld] Wharf until 12AM on 5/17/2016 at which time you will be allowed to transit to Marathon Oil at MM14 vessel must return to the [name withheld] Wharf until the following conditions have been met: See Attached CG_835 dated 16MAY2016.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 16 May 2016
Resolved 13 June 2016
Resolution: Vessel submitted classification society survey report and salvage plan to the satisfactory of attending marine surveyor.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 30 October 2014
Resolved
VCS line was not properly painted and marked according to 46 CFR 39.20-1(d).
Action required: 705 - Other - as specified
Due 4 December 2014
Resolved 4 December 2014
Resolution: Line was properly painted and marked with "VAPOR". Deficiency cleared.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 30 October 2014
Resolved
Permanently attached 0.5 inch diameter stud projecting outward from the top of the flange face was missing on the forward stbd VCS line. Provide required stud per 46 CFR 39.20-1(e)
Action required: 705 - Other - as specified
Resolved 4 December 2014
Resolution: Stud was provided as required.
Electrical › Electric Supply System (service) › Cable
Issued 30 October 2014
Resolved
An extension cord was permanently installed to provide power for an overhead light. Remove extension cord and replace with approved boat cable per 46 CFR 111.60-11
Action required: 705 - Other - as specified
Due 4 December 2014
Resolved 4 December 2014
Resolution: extension cord and light were removed.
Deck/Cargo › Cargo Heating › General
Issued 30 October 2014
Resolved
Exhaust leak was detected while testing Thermal Fluid Heater. Require repairs to leaking TFH prior to use.
Action required: 705 - Other - as specified
Due 4 December 2014
Resolved 4 December 2014
Resolution: TFH rep conducted repairs to leak. Tested Sat.
Lifesaving › Lifejacket/PFD (Type I) › Lights
Issued 30 October 2014
Resolved
Lights were expired on all lifejackets. Replace with serviceable lights. per 46 CFR 199.60(b)(4)
Action required: 705 - Other - as specified
Resolved 4 December 2014
Resolution: All expired lights were replaced with serviceable lights.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Reducers
Issued 3 January 2014
Resolved
Provide a permanently attached 1/2 inch stud at least 1 inch long at the 12 o'clock position of the vapor hose reducers attached to the port and starboard aft manifolds prior to using the 8" reducers for vapor connection. Barge had removed the studs previously due to improper installation preventing alignment with facility hoses.
Due 3 February 2014
Resolved 6 January 2014
Resolution: Vessel operator provided MI with evidence that the reducers had been fitted with a stud compatible with the vapor hoses.
Construction/Loadline › Hull › Hull Plating
Issued 20 December 2013
Resolved
Provide repair proposal and conduct repair to port aft deck area (deck, railing, mooring equipment) as well as 1" x 3" puncture to the aft port voice at the turn of the deck and the side shell.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 3 January 2014
Resolution: Attending MI observed completed repairs. ABS witnessed air test.
Construction/Loadline › Hull › Side Shell
Issued 17 December 2013
Resolved
Damaged area on Port Stern at deckline about 20 foot by 1 foot with a 3 inch hole. Provide repair plans to satisfaction of MI prior to departing Corpus Christi, TX.
Action required: 705 - Other - as specified
Due 31 December 2013
Resolved 3 January 2014
Resolution: Attending MI observed completed repairs. ABS witnessed air test.
Construction/Loadline › Hull › Sheerstrake
Issued 26 November 2010
Resolved
Make permanent repairs to the Side Shell IWO the Damaged area at Frame 23 aft end of the Port side # 2 Ballast tank.. Area is to be Inspected during the next CG attendance.
Action required: 705 - Other - as specified
Due 29 February 2012
Resolved 23 December 2010
Resolution: Received ABS repiar report.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 26 November 2010
Resolved
Make permanent repairs to the Guard Railing IWO the Damaged area at the Port side # 2 Ballast tank. .
Action required: 705 - Other - as specified
Due 26 December 2010
Resolved 23 December 2010
Resolution: Received ABS repiar report.