Records from 2014 to 2026. Most recent: inspection, 26 February 2026.
Inspection history · 39
26 February 2026
PSC A
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8317109
24 September 2023
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7792385
9 June 2023
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7710725
26 April 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7675931
29 March 2023
PSC B
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7653616
14 December 2022
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7608708
6 September 2022
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7547793
12 January 2022
PSC B
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7375014
9 May 2021
Ballast Water Examination · Deficiency Check · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7192528
4 March 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7150203
18 December 2020
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7113769
21 October 2020
PSC B
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7079814
6 May 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6948438
2 May 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6947273
1 May 2020
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6946759
25 September 2019
PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6816430
22 April 2019
In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6667418
8 April 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6658319
3 March 2019
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 6631536
3 August 2018
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6497844
24 June 2018
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 6453538
19 June 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6449504
4 May 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6405778
29 October 2017
Administrative Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6296853
5 June 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6166693
3 April 2017
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6114450
29 September 2016
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6012436
6 September 2016
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5992599
29 August 2016
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5986874
27 August 2016
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5984499
21 May 2016
In-Service Inspection · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5882611
11 April 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5851150
11 April 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5860205
9 February 2016
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5812104
23 November 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5768446
23 November 2015
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5768468
18 November 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5766213
7 September 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5722418
19 October 2014
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 5004011
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management Plan (BWMP)
Issued 9 May 2021
Resolved
To discharge ballast water into the waters of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of
this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2025(a)(3), or
ballast with water from a U.S. public water system, according to the schedule in paragraph (b) of this section.
Subject vessel, of keel laid date 17NOV1999 and ballast water capacity of 19654 m3, is past its compliance date per the implementation schedule in 33 CFR
151.2035 (b). Vessel’s current ballast water management method is exchange and discharge, which is not authorized. Vessel has no BWTS installed.Vessel is not authorized to discharge untreated ballast into U.S. waters.
This deficiency will not be cleared until CG examiners receive documentation that the vessel has installed a BWTS, has decided to use on public water from the
U.S. public water system, or has updated its ballast water management plan to state that the vessel’s ballast water management method in U.S. waters is no
discharge.
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 12 May 2021
Resolution: 12MAY21 PSC received satisfactory updates to BWMP for operations in US and proof of Liberia flag approval.
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management Plan (BWMP)
Issued 9 May 2021
Resolved
A vessel equipped with ballast water tanks that operates in the waters of the United States must maintain a ballast water management plan that has been
developed specifically for the vessel and that will allow those responsible for the plans implementation to understand and follow the vessel's ballast water
management strategy and comply with the requirements of this subpart.Vessel’s ballast water
management plan does not reference the must up-to-date version of 33CFR151 Subpart D.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 May 2021
Resolution: 12MAY21: PSC received updates to Ballast Water Managment Plan appendix II and updated record of revisions page and approval from Liberia Flag.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 3 March 2019
Resolved
07126 -The porpuse of this regulation is to limit the growth potential in every space. means of control for flammable liquid tranfer pipe form pump to purifing room has leak. Crew had 2 drip pan caughting oil that was leaking form a flang. SOLAS 2004 11-2 reg 5.1.2
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 April 2019
Resolution: Class witnessed repairs effected to the flange where oil was leaking.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 3 March 2019
Resolved
13197-After survey of the ship under this regulation has been completed no changes shall be made in structual arrangement. Tank locaed in purifiing room quick closing valve was no connected. Solas 2004 1/11.a
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 8 April 2019
Resolution: Class attested to the connection of the quick-closing valve.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 3 August 2018
Resolved
1420- 74 SOLAS (04) II-1/ 26.7- Provisions shall be made to facilitate cleaning inspection and maintenance of main propulsion and auxilary machinery. PSCO observed oily rags and containers with oil scattered throughout the engine room.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 August 2018
Resolved 4 August 2018
Resolution: Class report submitted to clear the oil found around the engine room
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Insulation wetted through (oil)
Issued 3 August 2018
Resolved
1410- 74 SOLAS (01) II-2/ 15.2- The arrangements for the distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons on board. PSCO observed excesive fuel oil located on the vacinity of the #8 cylinder injector valve.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 3 August 2018
Resolved 4 August 2018
Resolution: Class report submitted to clear the oil found around the engine room.
Engineering › Diesel Engine (propulsion-direct drive) › Valve, Pilot (air start)
Issued 29 October 2017
Resolved
THE MACHINERY SYSTEMS AND FITTINGS SHALL BE ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THE DESIGN SHALL HAVE REGARD TO MATERIALS USED FOR THH PURPOSE FOR WHICH THE EQUIPMENT IS INTENDED.
THE VESSEL COULD NOT MAINTAIN PROPULSION WHILE ATTEMPTING TO GET UNDERWAY FROM BAYPORT CONTAINER TERMINAL. 74SOLAS(2001) II-1/26
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 29 October 2017
Resolved 31 October 2017
Resolution: Received, reviewed and accepted class report from class, BV, stating the deficiency was rectified.
Engineering › Diesel Engine (auxiliary) › Injector (fuel injection)
Issued 6 September 2016
Resolved
1430-Auxiliary engines-The condition of the ship and its equipment shall be maintained to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed fuel oil leaking from the low pressure fuel rail on #1 and #4 generators. Generators shall not be used until proof of repair has been provided. SOLAS 14 I/11 16a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 September 2016
Resolved 29 September 2016
Resolution: PSC NOLA received a class report from BV stating that the leaks have been repaired.
Engineering › Diesel Engine (propulsion-direct drive) › Exhaust Manifold
Issued 6 September 2016
Resolved
1410-Propulsion main eng-The condition of the ship and its equipment shall be maintained to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed what appears to be several exhaust leaks on the turbo on the vessels main engine. Provide clarification from class as to the integrity of the exhaust system SOLAS 14 I/11 16a
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 September 2016
Resolved 29 September 2016
Resolution: PSC NOLA received a class report from BV stating that all exhaust leaks have been repaired.
Operations/Management › Pollution › Removal Methods/Procedures
Issued 6 September 2016
Resolved
2120-Garbage-Every ship of 400 GT and above shall carry a garbage management plan which the crew shall follow. This plan shall provide written procedures for collecting, storing, processing and disposing of garbage. PSCO observed excessive storage of oily rags in plastic bags in the engine room. Garbage management plan does not provide instruction for the storage of excess oily rags. MARPOL V/9 16
Action required: 705 - Other - as specified
Due 20 September 2016
Resolved 29 September 2016
Resolution: PSC NOLA received a class report from BV stating that oily rags were removed and additional bins identified as hazardous material were provided in proper storage locations and amended the garbage management plan.
Engineering › Steering Gear System › Power Unit
Issued 21 May 2016
Resolved
0936-Steering Gear-The condition of the ship and its equipment shall be maintained to conform with the provisions of regulation to ensure the ship will remain fit to proceed to sea without danger to the ship or persons on board. Steering gear system No.1 follow up mode is not operational. '74 SOLAS ('14 Cons.) CH.I/Reg.11A; 17AC
Action required: 17 - Rectify deficiencies prior to departure
Due 21 May 2016
Resolved 21 May 2016
Resolution: Technitians report indicates that a power control board was found defective and was replaced. Class verified operation.
Fire Fighting › Miscellaneous Items › Insulation (Penetration of Oil/Oil Vapors)
Issued 23 November 2015
Resolved
1470 - The condition of the ship and its equipment shall be maintained to conform with the provisioons of the present regulations to ensure tha the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Oil soaked lagging was discovered in the purifier room, presenting a fire hazard to the vessel and its crew. 74 SOLAS (14) I/11a.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 December 2015
Resolved 9 February 2016
Resolution: submitted class report
Engineering › Steam Boiler (auxiliary/waste heat) › Valve, Superheater Safety
Issued 23 November 2015
Resolved
1499 - Every steam pipe and every fitting connected thereto through which steam may pass shall be so designed, constructed and installed as to withstand the max. working stresses to which it may be subjected. The valve leading from the boiler to heat the heavy oil fuel tank was found leaking steam into the engine room. 74 SOLAS (04 cons) II-1/33.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 December 2015
Resolved 9 February 2016
Resolution: submitted class report