TACLOBO is a 1987 tank barge. The Coast Guard has recorded 8 inspections since 2010, most recently in January 2015, along with 12 deficiencies and 1 operational control.
Records from 2010 to 2015. Most recent: inspection, 12 January 2015.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units and the documentation record — is Professional, $39 a month. Sign in.
This record may be incomplete: the most recent inspection recorded for this vessel was 11 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it260 - Simplified, Gross Ton 236 - Simplified, Net Ton 988 - Dead Weight, Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Professional
Detail on this page
8 inspections, each with its date, unit and type; 12 deficiencies with the resolution recorded against each; 1 operational control with the dates imposed and removed; 2 vessels inspected with it, by name and date; the documentation record, as PSIX holds it. The counts in the summary above are the same
counts, and they are free.
$39 a month or $299 a year, every vessel page, cancel any time.
Founding rate $19.99 a month for life, for the first 200 subscribers.
PlansSign in
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
0150 International Register of Shipping issued TACLOBO an IOPP to expire on 09/25/2013. Saipan Marine Corporation operated the TACLOBO in a loaded condition within the Sector Guam AOR on the following dates: 3/10/2014, 3/14/2014, 3/16/2014, 3/21/2014, 3/23/2014. MARPOL Anx 1 Reg 7.1 Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 May 2014
Resolution: IOPP issued by RINA and original is onboard.
Documentation › Certificates/Documents › Certificate of Compliance (Fish)
Issued 11 April 2014Resolved
0199- T/V TACLOBO's Tank Vessel COC expired March 1, 2014. Saipan Marine Corporation operated the TACLOBO in a loaded condition with the Sector Guam COTP Zone on the following dates: 3/10/2014, 3/14/2014, 3/16/2014, 3/21/2014, 3/23/2014. 46 CFR 2.01-6 (a) Rectify to the satisfaction of the Coast Guard prior to movement.
Action required: 705 - Other - as specified
Resolved 9 May 2014
Resolution: COC issued 09May2014.
0150- Saipan Marine Corporation failed to arrange for an initial survey to be conducted for the issuance of an IOPP Certificate on the T/V TACLOBO prior to operating in the Sector Guam COTP zone after the previous IOPP Certificate expired on September 25, 2013. MARPOL Anx 1 Reg 6.1.1 Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: RINA attended TACLOBO for survey to issue IOPP.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 11 April 2014Resolved
0120- Saipan Marine Corporation was unable to provide an original ICLL Certificate on board the TACLOBO IAW FAL.2/Circ.123. ICLL Article 16. Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 May 2014
Resolution: ICLL original certificate is onboard.
Documentation › Certificates/Documents › International Tonnage Certificate
Issued 11 April 2014Resolved
0199- Saipan Marine Corporation was unable to provide an original International Tonnage Certificate IAW FAL.2/Circ.123. Tonnage Conv. Art. 7. Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 April 2014
Resolution: Original tonnage certificate verified onboard by USCG and RINA representative.
Construction/Loadline › Hull › Sheerstrake
Issued 11 April 2014Resolved
0984- U.S. Coast Guard Marine Inspector discovered an indication of a possible fracture and cargo leakage in the lap seam located between frames 2 & 4 on the starboard side. Discoloration originated at the lap seam providing visual evidence of possible cargo leakage. 46 CFR31.10-15 & NVIC 7-68. Rectify to the satisfaction of the Coast Guard OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Pin hole on lapse seam gouged out and rewelded. UT testing by qualified NDT inspector and considered sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 11 April 2014Resolved
0725- Saipan Marine Corporation could not provide inspection or test records for the fixed fire fighting system protecting the vessel's pumproom. The system was installed in 2009 and has not been inspected or tested since. 46CFR31.10-18 (a). Rectify to the satisfaction of the Coast Guard OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 April 2014
Resolution: Rec. svc station Phoenix Pacific completed annual servicing of the fire ext. system. Verified by RINA and USCG.
1430- Saipan Marine Corporation placed a portable (non-marine) generator in service to supply power to the TACLOBO's electrical system without Class approval. 46CFR31.30-1. Rectify to the satisfaction of the Coast Guard OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Generator and installation examined by RINA and considered sat. USCG verified.
Electrical › Electric Supply System (service) › Cable
Issued 11 April 2014Resolved
0830- Electrical wiring originating from the vessel's pumproom and installed throughout the length of the entire port side is not properly installed or supported. Metal supports on the port side are corroded and detached from their original position. Loose wiring was observed next to the deck coaming creating a tripping hazard to vessel personnel. 46CFR31.35-1. Rectify to the sat. of USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Corroded and detached wiring and supports were removed entirely and verified by RINA and USCG.
Construction/Loadline › Markings › Load Line Mark
Issued 11 April 2014Resolved
1220- The loadline and draft markings are colored black against a black hull and not plainly visible. ICLL Ch. 1 Reg. 8. Rectify to the satisfaction of the USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Freeboard lines and draft marks repainted and verified by RINA and USCG.
1899- The enclosed containment area under the diesel fuel tank, servicing the cargo pumps, has a 1/2" hole in it. 33CFR155.320(b)(1). Rectify to the satisfaction of the USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Hole at aft coaming of diesel fuel tank was inserted with new plate and examined by RINA to be sat. USCG verified.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 11 April 2014Resolved
9800- Saipan Marine Corp. was unable to provide a USCG response plan approval letter and the plan is expired in the USCG response plan database. 33CFR155.1040. Rectify to the satisfaction of the USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2014
Resolution: VRP approved by USCG HQ VRP office on May 8, 2014.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.