Records from 2010 to 2015. Most recent: inspection, 12 January 2015.
Inspection history · 8
12 January 2015
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 5051471
28 April 2014
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4845356
11 April 2014
COC-TVE Renew · ISPS II Exam · Deficiency Check
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4832132
9 April 2014
Type not recorded
No type recorded · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4832905
14 August 2012
Type not recorded
No type recorded · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4411483
29 February 2012
ISPS II Exam · MARPOL Annex I Examination · COC-TVE Renew
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 4253174
23 September 2010
Type not recorded
No type recorded · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 3855345
17 May 2010
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 3740851
Documentation › Certificates/Documents › IOPP Certificate
Issued 11 April 2014
Resolved
0150 International Register of Shipping issued TACLOBO an IOPP to expire on 09/25/2013. Saipan Marine Corporation operated the TACLOBO in a loaded condition within the Sector Guam AOR on the following dates: 3/10/2014, 3/14/2014, 3/16/2014, 3/21/2014, 3/23/2014. MARPOL Anx 1 Reg 7.1 Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 May 2014
Resolution: IOPP issued by RINA and original is onboard.
Documentation › Certificates/Documents › Certificate of Compliance (Fish)
Issued 11 April 2014
Resolved
0199- T/V TACLOBO's Tank Vessel COC expired March 1, 2014. Saipan Marine Corporation operated the TACLOBO in a loaded condition with the Sector Guam COTP Zone on the following dates: 3/10/2014, 3/14/2014, 3/16/2014, 3/21/2014, 3/23/2014. 46 CFR 2.01-6 (a) Rectify to the satisfaction of the Coast Guard prior to movement.
Action required: 705 - Other - as specified
Resolved 9 May 2014
Resolution: COC issued 09May2014.
Documentation › Certificates/Documents › IOPP Certificate
Issued 11 April 2014
Resolved
0150- Saipan Marine Corporation failed to arrange for an initial survey to be conducted for the issuance of an IOPP Certificate on the T/V TACLOBO prior to operating in the Sector Guam COTP zone after the previous IOPP Certificate expired on September 25, 2013. MARPOL Anx 1 Reg 6.1.1 Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: RINA attended TACLOBO for survey to issue IOPP.
Documentation › Certificates/Documents › International Load Line Certificate
Issued 11 April 2014
Resolved
0120- Saipan Marine Corporation was unable to provide an original ICLL Certificate on board the TACLOBO IAW FAL.2/Circ.123. ICLL Article 16. Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 May 2014
Resolution: ICLL original certificate is onboard.
Documentation › Certificates/Documents › International Tonnage Certificate
Issued 11 April 2014
Resolved
0199- Saipan Marine Corporation was unable to provide an original International Tonnage Certificate IAW FAL.2/Circ.123. Tonnage Conv. Art. 7. Rectify to the satisfaction of the Administration.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 April 2014
Resolution: Original tonnage certificate verified onboard by USCG and RINA representative.
Construction/Loadline › Hull › Sheerstrake
Issued 11 April 2014
Resolved
0984- U.S. Coast Guard Marine Inspector discovered an indication of a possible fracture and cargo leakage in the lap seam located between frames 2 & 4 on the starboard side. Discoloration originated at the lap seam providing visual evidence of possible cargo leakage. 46 CFR31.10-15 & NVIC 7-68. Rectify to the satisfaction of the Coast Guard OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Pin hole on lapse seam gouged out and rewelded. UT testing by qualified NDT inspector and considered sat.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 11 April 2014
Resolved
0725- Saipan Marine Corporation could not provide inspection or test records for the fixed fire fighting system protecting the vessel's pumproom. The system was installed in 2009 and has not been inspected or tested since. 46CFR31.10-18 (a). Rectify to the satisfaction of the Coast Guard OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 25 April 2014
Resolution: Rec. svc station Phoenix Pacific completed annual servicing of the fire ext. system. Verified by RINA and USCG.
Engineering › Generator (propulsion/auxiliary-electric) › Indicator Circuitry
Issued 11 April 2014
Resolved
1430- Saipan Marine Corporation placed a portable (non-marine) generator in service to supply power to the TACLOBO's electrical system without Class approval. 46CFR31.30-1. Rectify to the satisfaction of the Coast Guard OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Generator and installation examined by RINA and considered sat. USCG verified.
Electrical › Electric Supply System (service) › Cable
Issued 11 April 2014
Resolved
0830- Electrical wiring originating from the vessel's pumproom and installed throughout the length of the entire port side is not properly installed or supported. Metal supports on the port side are corroded and detached from their original position. Loose wiring was observed next to the deck coaming creating a tripping hazard to vessel personnel. 46CFR31.35-1. Rectify to the sat. of USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Corroded and detached wiring and supports were removed entirely and verified by RINA and USCG.
Construction/Loadline › Markings › Load Line Mark
Issued 11 April 2014
Resolved
1220- The loadline and draft markings are colored black against a black hull and not plainly visible. ICLL Ch. 1 Reg. 8. Rectify to the satisfaction of the USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Freeboard lines and draft marks repainted and verified by RINA and USCG.
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 11 April 2014
Resolved
1899- The enclosed containment area under the diesel fuel tank, servicing the cargo pumps, has a 1/2" hole in it. 33CFR155.320(b)(1). Rectify to the satisfaction of the USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 April 2014
Resolution: Hole at aft coaming of diesel fuel tank was inserted with new plate and examined by RINA to be sat. USCG verified.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 11 April 2014
Resolved
9800- Saipan Marine Corp. was unable to provide a USCG response plan approval letter and the plan is expired in the USCG response plan database. 33CFR155.1040. Rectify to the satisfaction of the USCG OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 May 2014
Resolution: VRP approved by USCG HQ VRP office on May 8, 2014.