Records from 2010 to 2025. Most recent: inspection, 21 May 2025.
Documentation record
Registered dimensions (L × B × D)132.3 ft × 34.0 ft × 10.8 ft
Registered tonnagegross 472 / net 321
ITC dimensions (L × B × D)132.3 ft × 34.0 ft × 10.8 ft
ITC tonnagegross 634 / net 190
BuilderEASTERN SHIPBUILDING GROUP INC · PANAMA CITY, FL, UNITED STATES · built 2009
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPADUCAH, KY
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 29 October 2025 · expires 30 November 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it634 - Convention (Subpart B), Gross Ton
472 - Regulatory (Subpart C or D), Gross Ton
190 - Convention (Subpart B), Net Ton
321 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
21 May 2025
Deficiency Check · Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8140390
21 May 2025
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8140488
18 March 2025
Appeal
Administrative · USCG Heartland District (dp) · USCG Heartland District (CGD-H) · Activity 8153037
28 February 2025
Deficiency Check · Damage Survey
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 8086126
4 November 2024
COI Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 8009387
28 March 2023
TPO Audit
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7656284
21 March 2023
Damage Survey · Deficiency Check
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7654209
21 March 2023
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7656363
30 November 2022
Type not recorded
No type recorded · Marine Safety Unit Pittsburgh · USCG Heartland District (CGD-H) · Activity 7602734
1 January 2022
Type not recorded
No type recorded · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 7374910
20 July 2021
TPO Audit
Administrative · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 7262308
8 November 2019
Administrative Inspection · MTSA Verification · Initial Certification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6852042
14 July 2018
Type not recorded
No type recorded · Marine Safety Unit Huntington · USCG Heartland District (CGD-H) · Activity 6491766
19 July 2017
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 6223254
12 September 2014
Deficiency Check · Industry Initiated Exam
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4984114
4 February 2013
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4527717
3 November 2012
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4501438
16 August 2011
Industry Initiated Exam · DAPI Audit
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4118311
20 November 2010
Type not recorded
No type recorded · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3910410
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 May 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on-board under normal and emergency conditions.
Vessel reported issues with both gearboxes coming out of gear and unable to maneuver into forward or reverse. Prove proper operation of gearbox control prior to resuming operations.
This deficiency may be cleared by the USCG or Vessel's TPO, TVIB.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 21 May 2025
Resolved 22 May 2025
Resolution: Repairs affected to the satisfaction of the vessel's TPO, TVIB. Closeout letter attached.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 February 2025
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation. Vessels flanking rudder steering system will not swing to port. Make permanent repairs to the satisfaction of attending Marine Inspector.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 February 2025
Resolved 28 February 2025
Resolution: Accepted statement from master that the log was removed and vessel operates as designed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 4 November 2024
Resolved
Fire hazards should be minimized. Accumulation of oil in
engine room bilge, drums, and slop tank full. Remove oil.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 4 November 2024
Resolution: Removed oil from bilge, oil drums, and slop tank.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 November 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Port steering ram piping bracket has broken weld. Make repairs to satisfaction of attending CGMI.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 4 November 2024
Resolution: Installed new piping bracket, tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 March 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions.
The vessel reported an issue with the port main diesel engine.
Prove proper operation of the propulsion machinery to the satisfaction of the vessel's TPO.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 21 March 2023
Resolved 26 March 2023
Resolution: TVIB Tracking number 1223297-CRC-2023-03-21
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 10 December 2019
Resolved
Ventilation fans for fwd stowage can not be shut off in the event of fire and activation of the FFE for the space. Shut-off switch can not be located. Locate switch and demonstrate operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 10 February 2020
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 10 December 2019
Resolved
Remove all gear from atop the CO2 bottles for the engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 10 February 2020
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 December 2019
Resolved
Ballast fill pipe located engine room, port aft is holed. Make permanent repairs.
Action required: 705 - Other - as specified
Due 10 January 2020
Resolved 6 March 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 10 December 2019
Resolved
Locate and test bilge high water alarm located somewhere in engine room.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 10 February 2020
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 8 November 2019
Resolved
Properly stencil life jacket stowage containers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 10 February 2020
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 November 2019
Resolved
Place containment under the rescue boat's re-fueling tank.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 January 2020
Resolved 10 February 2020
20 November 2010Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 3910410
3 November 2012Routine · role: Involved in a Marine Casualty · activity 4501438
4 February 2013Routine · role: Involved in a Marine Casualty · activity 4527717
19 July 2017Significant Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 6223254
14 July 2018Routine · role: Involved in a Marine Casualty · activity 6491766
30 November 2022Routine · role: Transiting Vicinity of Primary Subject · activity 7602734
21 March 2023Routine · role: Involved in a Marine Casualty · activity 7656363
21 May 2025Routine · role: Involved in a Marine Casualty · activity 8140488
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source:
IIR, through 2026.