Records from 2010 to 2023. Most recent: inspection, 20 December 2023.
Inspection history · 20
20 December 2023
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7839609
8 January 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 7618077
10 August 2022
PSC C
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7530189
31 July 2022
Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7516872
2 February 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7134671
27 January 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7131570
14 January 2021
In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7124633
14 January 2021
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7143104
13 January 2021
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7123692
30 April 2020
PSC B · Ballast Water Examination · COC-CHEM Renew
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6941474
18 January 2019
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6612212
8 January 2019
COC-CHEM Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6605319
8 January 2018
Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6334090
26 December 2017
COC-CHEM & TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6329068
16 September 2016
ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Annual
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6002122
6 September 2015
Ballast Water Examination · ISPS II Exam · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5236369
13 February 2012
PI Safety Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4243752
13 February 2012
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 4244263
6 September 2011
ISPS II Exam · PII Safety Exam · COC-CHEM Renew · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4137088
22 September 2010
ISPS II Exam · COC-CHEM Annual · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3855116
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 10 August 2022
Resolved
Starboard side gangway used for pilot boarding arrangement is missing bottom rail course, and, platform step meant to align with pilot ladder is frozen, unable to adjust to safely extend to embarking or disembarking pilot in attendance.
SOLAS '74 (Amended), II-1/3-9
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 13 November 2022
Resolution: Two (P&S) new accommodation ladders (ClassNK approved Cert no FE22SC01256) were installed this time and onboard operational test conducted satisfactorily including load test. (Load Applied 600Kg).
09 - Working and Living Conditions › 092 - Working Conditions › Gangway, accommodation-ladder
Issued 10 August 2022
Resolved
Starboard and port side gangways used for pilot boarding arrangements are materially needing replacement in order to conform to MSC.1/Circ.1331.
SOLAS '74 (Amended), II-1/3-9
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 13 November 2022
Resolution: Two (P&S) new accommodation ladders (ClassNK approved Cert no FE22SC01256) were installed this time and onboard operational test conducted satisfactorily including load test. (Load Applied 600Kg).
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 31 July 2022
Resolved
AUBIBLE AND VISUAL ALARMS SAHALL BE PROVIDED TO INCLUDE: LOW FEED AIR PRESSURE OF FLOW FROM COMPRESSOR. PSSCO OBSERVED THAT NO AUDIBLE OR VISUAL ALARM WHERE ACTIVATED WHEN TESSTING THE LOW FEED AIR PRESSURE
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 November 2022
Resolution: A replacement pressure transmitter was supplied and installed on 14 AUG 2022. The alarm was tested, confirming proper operation of the audible/visual alarms. All found Satifactory.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other cargo/timber/deck/construction
Issued 14 January 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea. PSCO noted that during transfer of stores, using the ships crane, the hydraulic line on the crane burst. Causing 80-90 liters of fluid to discharge onto the deck of the ship, the terminal, and into the waterway.
Action required: 10 - Deficiency Rectified
Resolved 14 January 2021
Resolution: The ship replaced the hose and enacted their TVRP along with the crew initiating cleanup.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 8 January 2019
Resolved
Escape routes shall be maintained in a safe condition, clear of obstacles. Escape route on the upper deck to the STBD Main deck was blocked with exercise equipment.
74SOLAS(14) II-1/13.1.2
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 8 January 2019
Resolved 8 January 2019
Resolution: Crew removed all gym equipment blocking the escape route and stored it in a more reasonable location.
Lifesaving › Lifeboat › Propulsion Engine
Issued 26 December 2017
Resolved
0610- Lifesaving- The engines in lifeboats shall be run for a total period of not less than 3 minutes weekly. The portside lifeboat is inoperable due to damaged piston on engine.-74 Solas(14) III/20.6.2
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 January 2018
Resolution: Class provided survey report, deleting the inoperable lifeboat engine item.
Engineering › Compressed Air System (start air) › Piping
Issued 13 February 2012
Resolved
The vessel had a loss of propulsion while docking to North Locust Point Terminal. The main engine start air pipe separated at the union. Ship's engineers have made satisfactory temporary repairs. Code 17a. Prior to Departure to the satisfaction of Class.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 February 2012
Resolution: Received Class report attesting to proper repairs. Class report is attached in the documents.