← All vessels
SLNC GOODWILL
SLNC GOODWILL is a tank ship. The Coast Guard has recorded 84 inspections since 2010, most recently in April 2026, along with 123 deficiencies, 4 operational controls and 10 casualty investigations between 2016 and 2025.
Records from 2010 to 2026. Most recent: inspection, 10 April 2026.
- Built
- Not recorded
- Last inspected
- 10 April 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 123 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 10 investigations · 2016–2025
Identity
1266919
9448334 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
WDI5693
1047442
Flag
UNITED STATES
367711140
Maury page id
psix-1047442
Inspections, by type
…with no type recorded16
Years with a record
13 calendar years (2010–2026)
The 84 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 1980.
Documentation record
Registered dimensions (L × B × D)580.4 ft × 105.6 ft × 59.7 ft
Registered tonnagegross 30,241 / net 14,686
ITC dimensions (L × B × D)580.4 ft × 105.6 ft × 59.7 ft
ITC tonnagegross 30,241 / net 14,686
BuilderGUANGZHOU SHIPYARD INTERNATIONAL COMPANY · CHINA
Hull materialSteel
PropulsionDiesel Direct
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portWILMINGTON, DE
Trade endorsementsRegistry
DocumentationValid · issued 17 March 2026 · expires 30 April 2027
Service, as the file records itTank Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it30241 - Convention (Subpart B), Gross Ton
14686 - Convention (Subpart B), Net Ton
50326 - Dead Weight, Metric Ton
62174 - Displacement, Metric Ton
14686 - Convention (Subpart B), Net Ton
50326 - Dead Weight, Metric Ton
62174 - Displacement, Metric Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDI5693MMSI 367711140 · active · compulsorily equipped · granted 24 December 2025, expires 20 January 2036
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 84
10 April 2026
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8345649
18 October 2025
Administrative Inspection · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8254796
14 October 2025
Deficiency Check · Administrative Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8251392
17 September 2025
Type not recorded
No type recorded · Activities Europe · Activity 8237245
11 August 2025
Administrative Inspection
Administrative · Activities Europe · Activity 8207093
2 July 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8174629
15 May 2025
MSP Annual Oversight · Annual Inspection · MTSA/ISPS Verification
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8132097
10 May 2025
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8132093
6 April 2025
Administrative Inspection · In-Service Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8105823
10 March 2025
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8090810
6 March 2025
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8090567
5 March 2025
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8089102
15 December 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8047521
23 August 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7987399
21 July 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7964670
6 May 2024
Administrative Inspection · COI Inspection · Internal Structural Exam · Drydock Exam · MSP COI Oversight
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7907137
10 April 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7892835
31 March 2024
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7900503
19 January 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7851477
14 August 2023
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7767659
5 August 2023
MSP Annual Oversight · Administrative Inspection · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7761616
9 July 2023
MSP Annual Oversight
Type not classified · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7739021
17 June 2023
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7721127
19 May 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7691931
14 March 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7650561
6 March 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7645837
30 December 2022
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7614440
26 December 2022
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7612990
15 December 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7622928
28 November 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7606640
22 October 2022
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7582547
1 September 2022
Examination of Repairs · Administrative Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7554818
23 June 2022
MSP Annual Oversight
Type not classified · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 7485028
29 March 2022
Underwater Inspection in lieu of Drydock
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7420450
19 November 2021
Bulk Liquid Transfer Monitor
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7353996
24 October 2021
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7338401
24 September 2021
In-Service Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7319375
14 June 2021
Administrative Inspection · MSP Annual Oversight · Annual Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7224676
17 May 2021
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7198647
19 April 2021
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7265087
8 March 2021
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7151873
20 October 2020
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7080587
29 September 2020
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7088014
13 September 2020
MSP COI Oversight · COI Inspection · MTSA Verification
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7061158
1 September 2020
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7047214
7 August 2020
Administrative Inspection · Permit to Proceed · Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7028636
5 August 2020
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7025155
24 July 2020
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7014645
18 May 2020
Damage Survey · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6954996
2 April 2020
Annual Inspection · MSP Annual Oversight
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6934370
30 November 2019
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6886366
5 November 2019
Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6862615
22 October 2019
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6839315
10 September 2019
Administrative Inspection · Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6809849
9 July 2019
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6742850
21 April 2019
MTSA/ISPS Verification · Administrative Inspection · Ballast Water Examination · Annual Inspection · MSP Annual Oversight
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6673147
4 April 2019
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6655563
14 February 2019
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6625576
18 July 2018
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6483092
9 April 2018
Periodic Inspection · MSP Annual Oversight · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6386300
15 March 2018
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6372174
3 March 2018
Type not recorded
No type recorded · Sector Northern New England · USCG Northeast District (CGD-NE) · Activity 6381275
7 February 2018
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6350856
6 February 2018
Damage Survey
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6351572
20 November 2017
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 6346726
8 May 2017
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6433511
27 April 2017
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 6133453
12 April 2017
Underwater Inspection in lieu of Drydock
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6116262
8 March 2017
MTSA/ISPS Verification · Annual Inspection · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6093826
2 March 2017
Underwater Inspection in lieu of Drydock
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 6097464
6 October 2016
Deficiency Check · Administrative Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6017230
28 September 2016
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6011164
29 August 2016
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5986021
24 June 2016
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5917280
17 June 2016
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5909995
2 May 2016
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 5866863
9 April 2016
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 5923165
3 March 2016
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 5828884
20 January 2016
ISM Oversight · MTSA/ISPS Verification · Reflagging & Initial Certification
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 5800070
3 November 2015
Type not recorded
No type recorded · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 5759051
9 October 2015
ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Renew
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5734573
16 November 2010
Ballast Water Examination · ISPS II Exam · COC-CHEM Annual
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3888714
11 March 2010
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3693908
4 March 2010
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3689706
Deficiency record · 123
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2025
Resolved
Fire-fighting systems and appliances shall be kept in
good working order and readily available for immediate
use. During inspection of CO2 room, Inspectors
discovered the control line for the remote activation of
fixed high pressure CO2 into the Inert Gas Generator
room was disconnected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 May 2025
Resolved
The following fire protection systems shall be kept in
good order so as to ensure their required performance if
a fire occurs. Structural fire protection, including
fire-resisting divisions, and protection of openings and
penetrations in these divisions. The Roxtec bulkhead
penetration between the cargo deck and accommodation
space was found wasted and in disrepair rendering the
wedge unable to be tightened. 74 SOLAS
II-2/14.2.1.1
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 May 2025
Resolved
Cables and wiring shall be installed and supported in
such a manner as to avoid chafing or other damage
utilizing standards found in IEC 60092, electrical
installations in ships and DNV class rules. Multiple
horizontal and vertical cable runs were found
unsupported and drooping due to utilization of plastic
zip ties. 74 SOLAS
II-1/45.5.5
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 15 May 2025
Resolved
The purpose of this regulation is to prevent the
ignition of combustible materials or flammable liquids.
For this purpose, the following functional requirement
shall be met. Means shall be provided to control leaks
of flammable liquids. During inspection of the cargo
manifold area it was noted that multiple valves on the
mix-master header were leaking by and dripping into the
spill containment through cargo line flanges. This shall
be rectified at next gas free period.(705)
This shall
be rectified at next gas free period.(705)
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 15 May 2025
Resolved
The main inlets and outlets of all ventilation systems
shall be capable of being closed from outside the spaces
being ventilated. The means of closing shall be easily
accessible as well as prominently and permanently marked
and shall indicate whether the shut-off is open or
closed. The number 2 machinery space ventilation louvers
failed to close upon operation of the remote cable pull. 74 SOLAS
II-2/5.2.1.1
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 15 April 2025
Resolved
Companies shall comply with the relevant requirements of part A of the International Safety Management Code. The Safety Management System (SMS) should include procedures ensuring that non-conformities, accidents and hazardous situations are reported to the company, investigated, and analyzed with the objective of improving safety and pollution prevention. The vessel did not report on board incinerator failed to operate to USCG and the vessel shows record of fuel oil being transferred from fuel oil/waste oil tank to overfill tank. The overfill tank is not authorized on the IOPP as a certified tank intended for management of waste oil, slops and sludge.74 SOLAS (2009) IX/3.1
ISM Part A 9.1
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 April 2025
Resolved
Companies shall comply with the relevant requirements of part A of the International Safety Management Code. The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. The vessel used after market flex hoses with hose clamps on the number 3 and 4 main engine cylinders to divert the fuel oil gallery alarm. When the attending MI energized the fuel oil boost pumps and began barring the engine over, 4 of the main engines 6 cylinders show signs of leakage with significant leakage from the No. 4 main engine cylinder. 74 SOLAS (2009) IX/3.1
ISM Part A 10.1
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 April 2025
Resolved
Companies shall comply with the relevant requirements of part A of the International Safety Management Code. The company should ensure that inspections are held at appropriate intervals. All three of the vessel's generators were overdue for maintenance.74 SOLAS (2009) IX/3.1
ISM Part A 10.2
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 6 April 2025
Resolved
Location of the controls of any valve serving a sea inlet, a discharge below the waterline shall be so sited as to allow adequate time for operation in case of influx of water to the space, having regard to the time likely to be required in order to reach and operate such controls. The high sea suction strainer cannot be removed due to current lay out of the vessel. The low sea suction hydraulic actuator in inoperative pneumatically. It can be operated manually. 74 SOLAS (2009) II-1/48.3
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 6 April 2025
Resolved
Maintenance of the Ship and Equipment after survey. Requires procedures to ensure inspections and maintenance of critical systems like seawater intakes. Provide a plan to address the inspection and service future modifications of the high sea chest suction. Current configurations prevent the high sea chest from being accessed for cleaning at regular intervals. A plan should be included in the next arability to make permanent rectifications to this finding.SOLAS II-1/26.1
ISM Code – S10
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 6 April 2025
Resolved
All survival craft shall be fitted with retroreflective material. Attending MI’s noted that the lifeboat retro reflective tape is faded beyond serviceability.SOLAS Chapter III, Regulation 20.11.1.1
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 6 April 2025
Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations. Attending MI’s noted that there are several past due engineering maintenance items including No. 3 Service Generator and Sludge Pump.SOLAS Chapter I, Regulation 11(a) / ISM Code – Section 10.1 and 10.2
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 6 April 2025
Resolved
The Company should ensure that all records, reports and logs are properly maintained and accurate.” Also applies where maintenance management software is used (e.g., NSE). The onboard maintenance management system, NSE, is not being utilized as intended. Specifically, many equipment maintenance schedules that are tracked on a calendar basis (e.g., monthly intervals) are instead being logged using operating hours. This inconsistency complicates the tracking of due maintenance tasks, making it challenging for both onboard crew and shore-side support to effectively monitor and plan maintenance activities. To address this issue, it’s essential to align the maintenance scheduling parameters within NSE with the maintain compliant tracking on job schedules.ISM Code – Section 11
ISM Code – Section 10 Maintenance System.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company verification, review and evaluation
Issued 6 April 2025
Resolved
The Company should ensure that inspections are held at appropriate intervals and records are maintained. ISM Code – Section 11 Accurate documentation is required to demonstrate compliance. During the attendance, it was noted that the vessel’s maintenance management system (NSE) displayed 47 overdue maintenance items. However, upon conducting a random query with the attending Marine Inspector, it was verified that several of these tasks had been completed and documented in the machinery history. For instance, the emergency fire pump flagged as overdue for a “Major Service” by 511 hours in the job list, yet the machinery history confirms that this service was completed in June 2024.
This discrepancy indicates a lapse in the integration between maintenance scheduling and record-keeping, potentially leading to misinformed decisions regarding equipment status and lapses in maintenance on required systems. Such inconsistencies can compromise the vessel’s safety management system (SMS) and are not in alignment with the ISM Code requirements.ISM Code – Section 10.3
14 - Pollution Prevention › 141 - MARPOL Annex I › Retention of oil on board
Issued 6 April 2025
Resolved
Ships with an aggregate oil fuel capacity of 600 m³ or more, delivered on or after 1 August 2010, must have oil fuel tanks designed and constructed to minimize the risk of oil pollution in the event of collision or grounding. This includes the provision of means to prevent overfilling and ensuring that sounding arrangements for oil tanks are accurate. During the inspection, it was observed that the vessel is equipped with an appropriate overfill tank intended for bunker overflow protection. However, the tank has been misused for storing fuel oil and lube oil waste, which is not its designated purpose and violates the IOPP certificate issued by DNV. This misuse compromises the tank’s intended function of preventing overfilling during bunkering operations. All non-authorized accumulated liquids and slops must be removed from the overfill tank. The overfill tank should be cleaned and restored to its intended condition to ensure it can effectively serve as a bunker overflow protection system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 April 2025
Resolved
Maintenance of propulsion and machinery systems must be properly recorded and monitored. Given the recent identification of both internal and external fuel leaks on the main engine, it is imperative to assess the condition of the of the engine’s lubrication system.
Provide a copy of the lube oily analysis from April.SOLAS Chapter II-1/26
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 6 April 2025
Resolved
Paint lockers protected by fixed CO2 systems must have integrated safety features, including automatic ventilation shutdown and audible alarms upon system activation. Attending MI’s observed that opening the CO2 system’s control cabinet door did not trigger the ventilation shutdown or sound the required alarm, indicating a malfunction in the system’s safety interlocks. Additionally, the operational instructions for the CO2 system lacked guidance on manually closing the fire dampers or ventilation louvers located on the deck above the paint locker, which is essential for effective fire suppression. The ship’s crew addressed these issues during the inspection by repairing the faulty control cabinet switch, restoring the automatic functions, and updating the operational instructions to include the necessary steps for closing the manual fire dampers and ventilation stacks.74 SOLAS (09) II-2/ 10.6.3.1 Code 17
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 6 April 2025
Resolved
The arrangement of the water seal, or equivalent devices, and its associated fittings shall
be such that it will prevent back-flow of vapors and liquids and will ensure the proper functioning of the seal under operating conditions. Marine inspector noted that sight glass on deck seal was not allowing crew to determine level of water. After changing the sight glass to a new one, Marine Inspector found that the new sight glass had cracked during installation. Make repairs to sight glass prior to carriage of cargo that requires use of IGS.74 SOLAS (20) II-2/4.5.5.2 FSS 2.2.3.1.5
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 6 April 2025
Resolved
The Company should ensure that each ship is: manned with qualified, certificated and medically fit seafarers in accordance with national and international requirements. During a licensing spot check, Marine Inspector found that not all crew had the VI/6 endorsement required for Personnel with Security Duties on board ships.74 SOLAS IX/3.1
ISM 6.2.1
46CFR15.113 (c)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 April 2025
Resolved
During sea trials intended to verify the reliability and safe operation of the vessel’s main engine following previous fuel leak incidents, two critical issues were observed: 1. The main diesel engine experienced an automated slowdown due to high jacket water temperature in cylinder No. 5. Investigation revealed a malfunctioning thermal probe, which was subsequently replaced, restoring normal operation.
2. A fuel leak was detected on cylinder No. 2, with fuel dripping onto the blowdown exhaust port, posing a significant fire hazard. Upon notification, the crew identified and secured a loose fuel return line on the forward injector of cylinder No. 2, mitigating the risk.Prior to departure, conduct a comprehensive fuel system grooming in collaboration with the Original Equipment Manufacturer (OEM) to ensure all systems function correctly and reliably. Subsequently, execute a follow-up sea trial with the presence of either an attending Coast Guard inspector or a representative from the recognized organization (DNV)to verify the effectiveness of the corrective measures and the overall reliability of the propulsion system.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Documentation-ISM
Issued 6 April 2025
Resolved
Over a four-day attendance period, multiple deficiencies were identified aboard the vessel, including outdated;
Inaccurate and outdated entries in the Nautical Systems Enterprise(NSE)maintenance system. Discrepancies between documented maintenance records and actual maintenance activities, leading to confusion over equipment status. Instances of non-compliance with established safety and security procedures, indicating lapses in crew training and adherence to the Safety Management system (SMS)
The vessel’s operating company is to arrange for an external audit of the ship’s Safety Management System (SMS) and the Nautical Systems Enterprise (NSE) maintenance system. This audit should include: The effectiveness and accuracy of the SMS and NSE systems.
Identify and document any non-conformities or areas requiring improvement.
Ensure that corrective actions are implemented to address the identified deficiencies.
The audit should be scheduled at the earliest opportunity, and a copy of the audit report, along with a detailed corrective action plan, must be submitted to the U.S. Coast Guard for review and verification.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 May 2024
Resolved
The venting arrangements shall be so designed and operated as to ensure that neither pressure nor vacuum in cargo tanks shall exceed design parameters. PV breaker is empty. Fill breaker IAW manufacturer's specs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 May 2024
Resolved
The last 1.0 meter (3.3 feet) of vapor piping upstream of the vessel vapor connection and each end of a vapor hose must be (1) Painted in the sequence of red/yellow/red. The width of the red bands must be 0.1 meter (0.33 foot) and the width of the middle yellow band must be 0.8 meter (2.64 feet) and (2) Labeled with the word “VAPOR” painted in black letters at least 50.8 millimeters (2 inches) high. Paint and label vapor manifold.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 6 May 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea. Cargo piping on deck heavily scaled and corroded. Descale and assess cargo piping and provide report with findings.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 6 May 2024
Resolved
Electrical installations shall be such that: the safety of passengers, crew, and ship from electrical hazards will be ensured. Ground fault id'd on main service bus 220AC. Identify, isolate, and correct.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 6 May 2024
Resolved
Surfaces with temperatures above 220C which may be impinged as a result of a fuel system failure shall be properly insulated. Renew oil soaked lagging IWO MDE FO drain line, FO transfer pump strainer, FO purification room behind filter.
09 - Working and Living Conditions › 091 - Living Conditions › Other (crew and accommodation)
Issued 6 May 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure the ship in all respects will remain fit to proceed to sea. Accommodation forward facing A60 rated blast windows are delaminating. Replace/renew.
10 - Safety of Navigation › N/A - No Subsystem › Voyage data recorder (VDR)/Simplified Voyage data recorder(S-VDR)
Issued 6 August 2023
Resolved
To assist in casualty investigations, ships engaged on international voyages shall be fitted with a voyage data recorder (VDR). MIs noted that the VDR deck seal penetration for cabling was not weathertight. Penetration shall be sealed to prevent water ingress.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2023
Resolved
Machinery and associated piping/controls shall be maintained in working condition for intended use. MIs noted valve faults for the cargo piping system on CT 1 PS and CT 3 SB. Valve faults shall be corrected within 14 days.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 August 2023
Resolved
Condition of ship and equipment shall be maintained to ensure safety. MIs noted following failed sensors during cargo inspection:
CT 5P COT - failed IG pressure and temp sensor
Residual slop tank - failed temp sensor
#2P high level alarm inop but overfill alarm works (confirmed TLI in CCR operational)
Satisfactory repairs due within 14 days.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 August 2023
Resolved
In tankers, electrical equipment, cables and wiring shall not be installed in hazardous locations unless it conforms with the standards of IEC 60092-502:1999 (Electrical installations in ships - Tankers). This standard specifies requirements for equipment rating based on hazardous location (Class 1, Division 1) and cabling penetration methods for rated enclosures. MIs noted the following electrical installation concerns in hazardous locations:
1. Cargo pump electrical junction boxes w/ corrosion and temporary repairs (specifically noted #1P, #5P, #6P...more thorough inspection required by vessel/RO to identify suspect junction boxes for motor controllers).
2. CO2 pull box alarm for fwd paint stores (new install)
3. Deck lighting underneath foscle w/ improper cable glands and exposed wiring to explosion proof enclosures
Repairs due within 30 days.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 August 2023
Resolved
Condition of ship shall be maintained for safety. Noted the following areas of cargo deck corrosion requiring action:
1. Centerline manifold (4P/4S IG - main catwalk) - corroded & fractured stanchion supporting the catwalk & cargo piping - requires temporary repairs for structural support (Belzona patch) and steel renewal for damaged/corroded vertical support.
2. Electrical conduit for high level alarms heavily corroded and fractured in multiple places
3. #1 and #2 cargo drop line flanges ivo port manifold are heavily corroded and require repairs/preservation.
Repair work required w/in 30 days.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 August 2023
Resolved
Condition of ship shall be maintained for safety. Noted the following areas of deck corrosion during exterior walkthrough:
1. Wasted fire damper hinges for C-deck Port side
2. FRB charging mount underneath steps to board FRB
3. Starboard LR electrical conduit for embarkation lighting
4. Flying bridge (Corroded light fixtures & cabling glands, control air piping corroded for ship's whistle, corroded and broken grounding straps, IMARSAT cage frame broken and duct taped together)
5. Main deck starboard stairwell railing fractured (A/B deck).
Repair work required w/in 30 days.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 6 August 2023
Resolved
Fire-fighting appliances shall be maintained and ready
for use. During pressure test of fire hoses, 2 hoses
failed (stored on deck in foam applicator lockers). Both
hoses were replaced and corrected during the inspection.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Other (MARPOL Annex VI)
Issued 6 August 2023
Resolved
MARPOL Annex VI (Air/Energy Pollution) survey was not credited by RO (DNV) due to comment regarding EEXI and SEEMP III applicability to ship due to military contract & exemptions; survey complete but annual credit withheld. Company shall engage with RO to determine applicability of EEXI and SEEMP III for re-issuance of IAPPC iaw RR 861 Ref 1058g comment (2023-01-03) from DNV.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 6 August 2023
Resolved
Condition of ship shall be maintained for safety. MIs noted substantial corrosion to steam piping system on-deck and noted that system had several piping sections removed. Aligned with DNV comments during 2023 annual surveys, steam piping shall be planned for removal from the vessel due to extensive corrosion at next scheduled DD (May 2024). Additionally, RO (DNV) shall ensure that the issued certificate of fitness (CoF) does not authorize heated cargo carriage due to OOC steam system on deck. This shall be completed w/in 30 days for CoF review by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2023
Resolved
Detailed instruction manuals for the IGG shall be provided onboard covering safety and maintenance requirements. Ship had an IGS manual but no instructions for crew to test system safeties and shutdowns/alarms. OEM support required to obtain testing instructions for system safeties and instructions shall be included into IGG manual retained onboard.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 August 2023
Resolved
Condition of ship and structure shall be maintained for fitness and operation. Following cargo deck items were noted for corrosion concerns and addressing at 2024 drydock period:
1. Grating damage around aft starboard station fire monitor
2. Cargo deck centerline hydraulic piping heavily corroded throughout length of ship
3. #2 starboard disc (B099) valve
4. #2 SD ROP (B085) valve
5. #2 starboard tank washing line spool pieces wasted
6. FM piping centerline fwd of #3 PVs
7. #3S Ballast sensor line supports wasted
8. #3S pressure gauge wiring conduit corroded
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 6 August 2023
Resolved
Means shall be provided to control leaks of flammable liquids. Following leaks were noted during the exam:
1. MIs noted lube oil leak on Main Engine flywheel, coming from sheared bolt. Immediate corrective action is required to mitigate leak during ME operation as the leak is hitting the flywheel while spinning and causing dispersement throughout main machinery room.
2. FO leaks noted around shock absorbers and ME cylinders 5/6
3. Saturated (FO soaked) lagging in multiple locations
a. IWO bilge pump (overhead piping)
b. Bulkhead connections and piping iwo HFO #2 tank
Remove saturated lagging, inspect for leaks, and renew.
Satisfactory repairs and OEM technical support required w/in 14 days.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2023
Resolved
Boilers shall be maintained for intended use. MIs noted that auxiliary boiler safety valve relieving gear was not functioning. Safety valve gear requires repairs and corrections; repairs due w/in 14 days & aux boiler supervision while in operation by engine watch-standers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2023
Resolved
Piping systems shall be maintained in working order. MIs noted the following items w/ repairs due in 14 days:
1. Holed saltwater discharge piping from atm drain tank
2. Bilge pump for daily bilge water w/ soft patch & leak
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 6 August 2023
Resolved
An alarm system shall be provided indicating any fault requiring attention and capable of sounding an audible alarm and visual signal in the machinery compartments. MIs noted the alarm signal column for the generator room was inop. Satisfactory repairs due w/in 14 days.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 6 August 2023
Resolved
Piping systems shall be maintained in working order. MIs noted cargo deck fwd hydraulic lines for foscle winches with leaks on deck. Satisfactory repairs due w/in 14 days.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2023
Resolved
Condition of cargo deck equipment and piping shall be maintained for intended use and safety. MIs noted the following items:
1. Fwd starboard deck winch, heavily corroded hydraulic piping and winch motor control block
2. Starboard manifold heavy corrosion (aft piping & vents)
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 30 December 2022
Resolved
Immediately after addressing safety concerns, the owner, agent, master, operator, or person in charge, shall notify the nearest OCMI whenever a vessel is involved in a marine casualty where an occurrence materially and adversely affects the vessel's seaworthiness or fitness for service or route. Vessel allided with barge on 16Dec22 at anchorage in Korea. Damage includes a holed hull on the port quarter between Frames #1-2 in the aft peak tank approximately 1.3m above draught.
Flag state dispensation is granted for vessel to make direct transit from Guam to Singapore to affect permanent repairs. Provide damage assessment, risk assessment and mitigation, Master's statement regarding incident, and submit a CG-2692.
74 SOLAS (20) I/11(c)
46 CFR 4.05-1(a)(4)
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2022
Resolved
A chemical tanker shall comply with the requirements of the International Bulk Chemical Code and shall, in addition to the requirement of I/10, as applicable, be surveyed and certified as provided for in the Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory.
Electrical installations shall be such as to minimize the risk of fire and explosion from flammable products. The 6 cargo pump explosion proof enclosure compromised due to damaged hardware. Vessel prohibited from carriage of cargoes with a flash point below 60 degrees Celsius or cargoes on the vessel's COF listed as flammable under Column K of the International Bulk Chemical Code until repairs are made to the 6 cargo pump explosion proof enclosure in accordance with the manufacturer specifications to the satisfaction of Class. In addition, provide Class report attesting to the repairs to Sector Honolulu Inspections for review.
74 SOLAS(20)VII-10.1
IBC (20 Ed)10.1.2.1
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2022
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. Intrinsically safe wiring in the vicinity of the number 4 cargo pump is not supported. Mount and support the intrinsically safe wiring to avoid damage.
74 SOLAS (04)Chapter II-1 Reg 45. 5.5
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2022
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. A light fixture and its wiring under the focsle have broken free of their mounts and are unsupported. Mount and support the light fixture and wiring.
74 SOLAS (04) Chapter II-1 Reg 45 5.5
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2022
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. The 2 starboard ballast tank level indicator junction box and its wiring have broken free of their mounts. Mount and support the junction box and its wiring.
74 SOLAS (04) Chapter II-1 Reg 45 5.5
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2022
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. The chemical locker fan controller and its wiring have broken free of their mounts. Mount and support the junction box and its wiring.
74 SOLAS (04) Chapter II-1 Reg 45 5.5
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 24 June 2022
Resolved
All access openings in bulkheads at ends of enclosed superstructures shall be fitted with doors of steel or other equivalent material, permanently and strongly attached to the bulkhead, and framed, stiffened and fitted so that the whole structure is of equivalent strength to the unpierced bulkhead and watertight when closed. All watertight and weathertight doors require maintenance/repairs. Submit a maintenance/repair proposal for all watertight and weathertight doors. Once the maintenance/repair proposal is approved maintain/repair and test all watertight and weathertight doors prior to receiving credit dry dock.
ICLL Reg 12.1
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 24 June 2022
Resolved
At positions 1 and 2 the height above the deck of hatchway coamings fitted with weathertight hatch covers of steel or other equivalent material fitted with gaskets and clamping shall be as specified in regulation 15. All hatch covers require maintenance/repairs. Submit a maintenance/repair proposal for all hatch covers. Once the maintenance/repair proposal is approved maintain/repair and test all hatch covers prior to receiving credit dry dock.
ICLL Reg 16.1
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 24 June 2022
Resolved
Where air pipes to ballast and other tanks extend above the freeboard or superstructure decks, the exposed parts of the pipes shall be of substantial construction.... Satisfactory means, permanently attached, shall be provided for the closing the openings of the air pipes. All air pips require maintenance/repairs. Submit a maintenance/repair proposal for all air pipes. Once the maintenance/repair proposal is approved maintain/repair and test all air pipes prior to receiving credit dry dock.
ICLL Reg 20
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 24 June 2022
Resolved
After any survey of the ship has been completed, no change shall be made in the structural arrangements, machinery, or equipment and other items covered by the survey, without the sanction of the Administration. The heavy fuel oil port side manifold low point drain valve handle is missing.
74 SOLAS (20) Chapter 1 Reg 11.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 June 2022
Resolved
The fire resistance of doors shall be equivalent to that of the division in which they are fitted, this being determined in accordance with the Fire Test Procedures Code. The cargo control room class "A" fire screen door was not attached to the doors two lower hinges.
74 SOLAS (04) Chapter II-2 Reg 9 4.2.1
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 June 2022
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. The ignitability of combustible materials shall be restricted. The deep fat fryer vent is covered in grease and needs cleaning.
74 SOLAS 04 Chapter II-2 Reg 4 1.1
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 June 2022
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials or flammable liquids. The ignitability of combustible materials shall be restricted. Dryer A3's vent screen was clogged with lint and needs cleaning.
74 SOLAS 04 Chapter II-2 Reg 4 1.1
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2022
Resolved
Cables and wiring shall be installed and supported in such a manner as to avoid chafing or other damage. The B deck dryer's plug and its wiring have broken free of their mounts. Mount and support the junction box and its wiring.
74 SOLAS (04) Chapter II-1 Reg 45 5.5
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 24 June 2022
Resolved
For tankers 20,000 tonnes deadweight and upwards, the protection of the cargo tanks shall be achieved by a fixed inert gas system in accordance with the the requirements of the Fire Safety Systems Code. For inert gas systems of both the flue gas and the inert gas generator type, audible and visual shall be provided to indicate: low water level in the water seal. The water seal's low level water alarm grounding wire was disconnected from its connection.
74 SOLAS (04) Chapter II-2 Reg 4 5.5.1.1
FSS (07) Chapter 15 Reg 2.4.3.1.7
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 23 June 2022
Resolved
Annual Inspection. Your vessel must undergo an annual inspection within 3 months before or after each anniversary date, except as specified in paragraph (b) of this section. Nothing in the subpart limits the Marine Inspector from conducting such tests or inspections he or she deems necessary to be assured of the vessel's seaworthiness. During the vessel's annual inspection the USCG Marine Inspectors identified watertight and weathertight closures that fail to create watertight or weathertight seals. USCG Marine Inspectors will attend the vessel again of 24 June 2022 to witness test of all watertight and weathertight closures.
46 CFR 31.10-17 (a) (4)
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 15 September 2020
Resolved
Where it is necessary that a ventilation duct passes through a main vertical zone division, a fail-safe automatic closing fire damper shall shall be fitted adjacent to the division. Identified engine room fire dampers #1, #2, and #3 misaligned damper blades leafing approximately 1.5 inch air gap, failing to effectively close.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 September 2020
Resolved
Electrical instillations shall be such that electrical services essential for safety will be ensured under various emergency conditions. AC220V feeder panel is indicating electrical system ground.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 15 September 2020
Resolved
Windows and side scuttles, except wheelhouse windows, shall be constructed to "A-60" class standard. The inboard window located in the Cargo Control room has cracks and sings of delamination.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 September 2020
Resolved
Means shall be provided to control leaks of flammable liquids. Observed F/O leak IWO MDE #4 cylinder high pressure fuel pump and fuel injectors.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 15 September 2020
Resolved
Means shall be provided to contol leaks of flammable liquids. Observed failed mechanical seal on the incinerator slidge pump.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 September 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Boiler cascade tank inboard shielding is wasted and tank is potential compromised. Diagnose tank condition, and submit corrective action plan.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 15 September 2020
Resolved
Any ship of 10,000 gross tonnage and above shall be fitted with oil filtering equipment complying with paragraph 7 of this regulation. During operational test of OWS observed System pipe failure. Temp repair made and in place.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 September 2020
Resolved
After any survey of the ship has been completed, no change shall be made in the equipment and other items covered by the survey. Found Emergency Generator, Life Boat, Rescue Boat, and GMDSS batteries are for automotive service not certified for marine environment.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 15 September 2020
Resolved
After any survey of the ship has been completed, no change shall be made in the equipment and other items covered by the survey. Found P/S FWT local level gauge disconnected and unapproved hose sight glass installed without isolation valves. Additionally, P/S & STBD low level alarm floats are frozen and inoperable, tank feeds Hyper Mist Fire Fighting system.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 September 2020
Resolved
After any survey of the ship has been completed, no change shall be made in the equipment and other items covered by the survey. Found inhibited alarms for cargo tank radar fail & cargo system power fail. Further investigation found Selco alarm panel in CCR with active alarms to No.1 & No 2 HFO TNK (PS/SB) HL, L.S. HFO HL, M.D.O tank HL, system fault, cargo temperature, cargo IB pressure, valve fault, and radar fault. Operationally and physically verified/tested both systems, with no observed abnormalities.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 15 September 2020
Resolved
The Company should establish procedures for key shipboard operations concerning the safety of the ship and the prevention of pollution. Ship does not have procedures for the calibration and testing of IG system.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 15 September 2020
Resolved
Warning signs at gang way shall be displayed to warn
persons approaching the gangway. The sign state in 2"
letters, WARNING,NO OPEN LIGHTS,NO SMOKING,NO VISITORS
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 15 September 2020
Resolved
Coast Guard acceptance of automated systems to replace specific personnel or reduce overall crew requirements is predicated on continued reliability. Found a malfunctioning reverse power protection and auto closing of ACB of started stand-by generator for No.3
Diesel Generator failed. PUMS is suspended until rectified and satisfactory function test completed. Engine room is to be manned operation.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 September 2020
Resolved
Portable extinguishers shall listed and labeled as marine type by a recognized laboratory. Portable 45L AFFF and 9L Dry Chemical Extinguishers installed IVO the temporary generator instillation are not approved by a recognized laboratory or international body. Provide USCG approved portable equipment or USCG COMDT (CG-ENG)approved SOLAS equivalent extinguishers.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 August 2020
Resolved
Where risk from overspeeding machinery exists, means shall be provided to ensure that safe speed is not exceeded. DG#1 and DG#2 are inoperable, and DG#3 has been determined to be unreliable by OEM onboard. Conduct repairs and verify proper operation of DG#3 prior to movement from Sasebo, JP, for issuance of a Permit to Proceed (PtP) by FEACT OCMI to proceed to next intended port for conduction of permanent repairs to ships power plant.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 9 August 2020
Resolved
Machinery shall be adequate for intended service and protected to reduce to a minimum any danger to persons onboard. #1 SSDG suffered catostrophic failure, which damaged #2 SSDG and associated cables. In addition, SSDG#3 is unreliable due to low-voltage system issues associated with the electronic governor. SOLAS II-1/26.1.
Vessel is proceeding via Permit to Proceed (PtP to Orient Shipyard, Busan. Following completion of repairs to the power generation and distribution system, all SSDGs and associated safety devices (low lube oil shutdown, overspeed safeties (electronic and mechanical), high cooling water temperature alarms, and reverse power relays) are to be verified by the attending Recognized Organization (DNV-GL).
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 29 April 2019
Resolved
Repair cargo deck leaks ID'd in 03 areas where IG was pushing out cargo fumes through damaged gaskets between flanges.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 29 April 2019
Resolved
Repair holed/wasted flame screens ID'd on vessels stern and on cargo deck in front of the house.
02 - Structural Conditions › N/A - No Subsystem › Cargo tank vent system
Issued 29 April 2019
Resolved
Replace missing VCS stud on port side manifold.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 29 April 2019
Resolved
Repair leak in sight glass for the IG fuel oil tank located in the IG fan room.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 29 April 2019
Resolved
Secure loose cables over ventilation closures in the athwart ship passageway.
08 - Alarms › N/A - No Subsystem › Emergency signal
Issued 29 April 2019
Resolved
Install new bracket for the stbd manifold emergency stop station and the break glass controller for CO2 in the athwart ship passageway.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 29 April 2019
Resolved
Install proper circuit breaker with interlock for the No. 4 engine room vent fan panel inside the EDG room.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 29 April 2019
Resolved
Ensure A-0 door on D-Deck closes properly in an emergency.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 29 April 2019
Resolved
Repair foam monitor gasket leak forward of the pedestal crane centerline.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 April 2019
Resolved
Clamped flex hose modifications to #1/#2 start air receiver condensate drain lines are not approved.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 29 April 2019
Resolved
Mark primary and secondary egress routes in the steering compartment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 April 2019
Resolved
Remove zip tie cables from air valve assembly on #4 cylinder on the main diesel engine and install as designed to prevent damage due to vibration.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 April 2019
Resolved
Identify and isolate source of coiled 25 foot flexible cable with leads taped off on one end. Cable located halfway up starboard side shell within the main machinery space.
04 - Emergency Systems › N/A - No Subsystem › Emergency fire pump and its pipes
Issued 29 April 2019
Resolved
Repair active salt water leak on the emergency fire pump plunger assembly.
Documentation › Safety Management System › Key Shipboard Operations Plans/Instructions
Issued 9 April 2018
Resolved
74SOLAS(04) I/6; NVIC 1-13, CH.1: Under section 7.1 FIREMAIN SYSTEM described in the vessel’s GAP EVALUATION FOR MSP TRASNFER TO U.S. REGISTRY OF MT GOODWILL IMO#9448334, dtd January 2016, Rev. 3b, on pge 9, lists 3 electric motor driven pumps one of which is installed outside the engine room in the bow thruster room; access to the 3rd fire pump is through the bosun stores space forward. Vsl’s approved fire control and safety plan does not show a fire pump located in the bow thruster room as described in the vsl’s gap analysis. Vsl’s firemain system shall be verified to accurately document on vessel’s gap evaluation and fire control and safety plan.
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 9 April 2018
Resolved
74SOLAS(04)I/11: THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT REGULATIONS TO ENSURE THAT THE SHIP IN ALL ASPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT DANGER TO THE SHIP OR PERSONS ON BOARD. THE MAIN ENGINE START AIR VALVE LIMIT SWITCH IS BROKEN AND INOPERABLE.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 9 April 2018
Resolved
74SOLAS(04) VII/10.1; IBC Chapter 14.1.1: A CHEMICAL TANKER SHALL COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BULK CHEMICAL CODE (IBC). REPLACE DETERIORATED CHEMICAL PROTECTIVE SUITS IN FOAM ROOM WITH NEW.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 9 April 2018
Resolved
74SOLAS(04) II-2/4.5.5.3.2: THE INERT GAS SYSTEM REFERRED TO IN PARAGRAPH 5.5.3.1 SHALL BE DESIGNED, CONSTRUCTED AND TESTED IN ACCORDANCE WITH THE FIRE SAFETY SYSTEMS CODE. THE INERT GAS GENERATOR MANUAL AIR CAPACITY LINKAGE BRACKET IS CRACKED AND THE GUIDE ROD IS BENT.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 9 April 2018
Resolved
74SOLAS(04)II-1/26.1: THE MACHINERY AND ASSOCIATED PIPINGS SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THE MAIN ENGINE TOP AFT BRACING SYSTEM IS LEAKING HYDRAULIC OIL.
Engineering › Diesel Engine (propulsion-direct drive) › Pump, High Pressure (fuel injection)
Issued 9 April 2018
Resolved
74SOLAS(04)II-1/26.1: THE MACHINERY AND ASSOCIATED PIPINGS SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED. THE MAIN ENGINE #5 CYLINDER HIGH PRESSURE FUEL LINE SHOWING SIGNS OF LEAKAGE.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 9 April 2018
Resolved
74SOLAS(04)II-1/26.1: THE MACHINERY, BOILERS, ASSOCIATED PIPINGS SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD, DUE REGARD BEING PAID TO HOT SURFACES AND OTHER HAZARDS. THE AUXILIARY BOILER EXHAUST STEAM LINE FLANGE BOLTS ARE LOOSE AND MISSING FASTENING NUTS.
Engineering › Steam Boiler (auxiliary/waste heat) › Piping
Issued 9 April 2018
Resolved
74SOLAS(04)II-1/26.1: THE MACHINERY, BOILERS, ASSOCIATED PIPINGS SYSTEMS AND FITTINGS SHALL BE OF A DESIGN AND CONSTRUCTION ADEQUATE FOR THE SERVICE FOR WHICH THEY ARE INTENDED AND PROTECTED AS TO REDUCE TO A MINIMUM ANY DANGER TO PERSONS ON BOARD, DUE REGARD BEING PAID TO HOT SURFACES AND OTHER HAZARDS. THE AUXILIARY BOILER EXHAUST STEAM LINE IS MISSING INSULATIONS.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 9 April 2018
Resolved
74SOLAS(04)I/11: AFTER ANY SURVEY OF THE SHIP HAS BEEN COMPLETED, NO CHANGE SHALL BE MADE IN THE STRUCTURAL ARRANGEMENT, MACHINERY, EQUIPMENT AND OTHER ITEMS COVERED BY THE SURVEY, WITHOUT THE SANCTION OF THE ADMINISTRATION. THE INERT GAS SYSTEM #1 & #2 WATER SUPPLY PUMP PIPINGS FOR DECK SEAL ARE LEAKING AND HAVE NON-APPROVED TEMPORARY REPAIR PATCHES.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Pressure
Issued 9 April 2018
Resolved
74SOLAS(04)II-2/10.4.1.1.3: A FIXED PRESSURE WATER SPRAYING FIRE EXTINGUISHING SYSTEM COMPLYING WITH THE PROVISIONS OF THE FIRE SAFETY SYSTEM CODE. THE WATER TANK LEVEL INDICATOR'S GLASS IS CRACKED IN THE STEERING GEAR ROOM FOR THE WATER MIST SYSTEM.
Personnel › Certificates/Documents/Licenses › Engineer
Issued 15 March 2018
Resolved
Vessel to be manned IAW COI and 46 CFR 15.860. The 1st Assistant Engineer is required to have a Tankerman-PIC or Tankerman-Engineer endorsement.
Navigation › Collision/Grounding Avoidance › Radar
Issued 7 February 2018
Resolved
10 cm Radar display is inoperable
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 27 April 2017
Resolved
Vessels seeking to operate with MAMS/PUMS which do not otherwise meet the requirements of 46 CFR 62.50-20 and/or 62.50-30 will align with the requirements by next credit dry-dock (no includding UWILD).
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 28 September 2016
Resolved
Issued FINAL 835 due date for EIAPP certficcates and full term IAPP to 07OCT2016. Authorized class to issue short term IAPP to 07OCT2016.
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 29 August 2016
Resolved
Extended 835 due date for EIAPP certficcates and full term IAPP to 30SEP2016. Authorized class to issue short term IAPP to 30SEP2016.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 2 May 2016
Resolved
Provide USCG approval letter from Marine Safety Center (MSC) for updated PSTP's.
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 2 May 2016
Resolved
Complete 100% satisfactory testing of final CG approved Periodic Safety Test Procedures (PSTP) prior to attendance of USCG inspectors for testing of system. Proof test of system by OCMI Marine Inspector shall be necessary after this testing to initiate trial period for PUMS/MAMS.
Documentation › Certificates/Documents › Engine EPA Approved Technical File
Issued 2 May 2016
Resolved
2nd Ext 29Jun16 via CVC-1. Provide EIAPP certificates and proof of full term IAPP certificates and tech files. Short term is authorized.
Electrical › Electric Generation Source (emergency) › Generator
Issued 3 March 2016
Resolved
Emergency diesel generator failed to start during routine testing.
Documentation › Certificates/Documents › Certificate of Fitness (BCH Code)
Issued 20 January 2016
Resolved
Cargo Authority approval from MSC prior to loading cargo
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 20 January 2016
Resolved
Replace broken Class1Div1 light in hazardous locations (Crane Area).
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 20 January 2016
Resolved
Submit time delay proposal for the High Pressure Co2 system to MSC for approval. After approval, install time delays and provide functional test..
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 20 January 2016
Resolved
Provide original COD onboard.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 20 January 2016
Resolved
Complete markings on free-fall lifeboat and hull
Documentation › Certificates/Documents › LRIT Conformance Test Report
Issued 20 January 2016
Resolved
Provide LRIT Conformance Test Report (CTR). In accordance w/ MSC.1/Circ.1307 10.1, the vessel transferred from Singapore Flag to the United States Flag. An LRIT Conformance Test was last completed on (23Jan16 for Singapore Flag) and shall be considered valid by the United States (CG CVC-1) until such time as a new CTR is completed but NLT (20Feb16)
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 20 January 2016
Resolved
Provide USCG approval letter from Marine Safety Center (MSC) for updated PSTP's
Operations/Management › Vessel Safety Management › Maintenance of Ship/Equipment
Issued 20 January 2016
Resolved
Complete 100% satisfactory testing of final CG approved Periodic Safety Test Procedures (PSTP) prior to attendance of USCG inspectors for testing of system. Proof test of system by OCMI Marine Inspector shall be necessary after this testing to initiate trial period for PUMS/MAMS.
Documentation › Markings/Placards › Warning Signs
Issued 20 January 2016
Resolved
Label switches, alarms, indicators, gauges throughout vessel
Documentation › Markings/Placards › Warning Signs
Issued 20 January 2016
Resolved
LB SOLAS routing signs egress
Documentation › Certificates/Documents › Engine IAPP Certificate
Issued 20 January 2016
Resolved
Provide EIAPP certificates and proof of full term IAPP certificates. Short term is authorized.
Lifesaving › Line-Throwing Appliances › Lines
Issued 20 January 2016
Resolved
Provide 500m service line for impulse line throwing appliance.
Documentation › Certificates/Documents › Proof of Consortium Enrollment (DAPI)
Issued 20 January 2016
Resolved
Complete Chemical Testing Program Audit and return to FEACT
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 4 March 2010
Resolved
Based on Masters statement to USCG IO of possible air draft error measurement calculations (i.e. pilot card and vessel particulars may not provide for correct measurement readings of vessel antenna) after antenna struck the [name withheld] Railroad bridge. Vessels class society is to remeasure and update if needed all vessels documentation.
Casualty record · 10
9 April 2016Routine · role: Involved in a Marine Casualty · activity 5923165
20 November 2017Routine · role: Involved in a Marine Casualty · activity 6346726
5 August 2020Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 7025155
20 October 2020Routine · role: Involved in a Marine Casualty · activity 7080587
22 October 2022Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7582547
15 December 2022Routine · role: Involved in a Marine Casualty · activity 7622928
31 March 2024Routine · role: Involved in a Marine Casualty · activity 7900503
5 March 2025Routine · role: Involved in a Marine Casualty · activity 8089102
6 March 2025Routine · role: Involved in a Marine Casualty · activity 8090567
17 September 2025Routine · role: Involved in a Marine Casualty · activity 8237245
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.