Records from 2009 to 2026. Most recent: inspection, 10 March 2026.
Inspection history · 25
10 March 2026
PSC B · COC-TVE Annual
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8323214
25 March 2025
COC-TVE Renew · PSC B
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 8095238
13 May 2024
COE-Administrative
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7911493
13 February 2024
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7864806
10 November 2023
PSC B · COC-TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7819855
25 August 2021
COC-TVE Renew · PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7296482
9 December 2019
COC-TVE Renew · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Honolulu · USCG Oceania District (CGD-O) · Activity 6865712
19 March 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6374246
12 December 2017
Ballast Water Examination · COC-TVE Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6321249
11 November 2017
In-Service Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6306190
10 November 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6304698
28 March 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6113044
25 March 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6111509
25 January 2017
ISPS II Exam · COC-TVE Annual · Ballast Water Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6076764
3 December 2015
ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5773156
21 February 2012
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4248637
21 February 2012
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4267080
1 December 2011
ISPS II Exam · Ballast Water Examination · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4199603
14 July 2011
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4081126
21 December 2010
COC-TVE Annual · ISPS II Exam · Ballast Water Examination
Physical examination · Marine Safety Unit Galveston · USCG Heartland District (CGD-H) · Activity 3911372
20 December 2010
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3911257
15 November 2010
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3891219
14 November 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3891665
9 February 2010
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3677599
12 December 2009
Ballast Water Examination · ISPS II Exam · COC-TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3649085
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 November 2023
Resolved
The purpose of this regulation is to prevent the ignition of combustible materials. PSCO observed a fuel oil leak on the main engine #2 cylinder high pressure fuel pump. 74SOLAS20, II-2/4, Restricted, Code 60ac
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 10 November 2023
Resolved 10 November 2023
Resolution: Rcvd, reviewed and accepted ABS class report stating fuel pump punctire valve was replaced and no leakage observed during survey.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 10 November 2023
Resolved
All steering gear components and the rudder stock shall be of sound and reliable construction to the satisfaction of the administration. PSCO observed a hydraulic leak on the #2 steering gear and multiple abnormal alarms from the #1 steering gear assembly. 74SOLAS20, II-1/29.2.1, Restricted, Code 60ac.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 10 November 2023
Resolved 10 November 2023
Resolution: Rcvd, reviewed and accepted ABS class report stating O rings where replaced and no leakage was observed. Alarms associated with steering gear system were tested and found sat
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 10 November 2023
Resolved
The condition of the ship and it's equipment shall be of the present regulations to ensure that the ship in all aspects will remain fit to proceed to sea without danger to the ship or persons on board. PSCO observed all cargo alarm monitoring systems with inaccurate readings. Radar was pulling multiple communication failure on multiple tanks. 74SOLAS20, I/11, Restricted, Code ac, Prior to Cargo.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 November 2023
Resolved 13 February 2024
Resolution: PSC NOLA received a class report from issuing entity satisfying the requirement.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 25 August 2021
Resolved
An immersion suit, complying with the requirements of section 2.3 of the code, of an appropriate size, shall be provided for every person assigned to crew the rescue boat, PSCO observed crew member (2nd Officer), unable to don immersion suit due to inappropriate size.
74SOLAS(20) III/7.3
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 August 2021
Resolution: Vessel provided proof that appropriate size immersion suit was onboard vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 August 2021
Resolved
All life-saving appliances & arrangements shall comply with the applicable requirements of the Code. The method of securing the lifejacket to the wearer has quick & positive means of closure that do not require tying of knots. All PFD's for crew had ties and no other means of securing.
74SOLAS(20) III/34
LSA 2.2.1.5.4
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 August 2021
Resolution: Vessel provided evidence that the necessary quantity and appropriate type of life jackets are onboard the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 25 August 2021
Resolved
The normal equipment of every lifeboat shall consist of...a food ration...these rations shall be kept in airtight packaging. PSCO observed 07 with damaged packaging, which may have caused the food ration to become unstable.
74SOLAS(20) III/34
LSA 4.4.8.12
Action required: 10 - Deficiency Rectified
Resolved 26 August 2021
Resolution: vessel had enough provisions onboard to meet the requirements of the safety equipment certificate after removing expired food rations.
09 - Working and Living Conditions › 092 - Working Conditions › Steam pipes and pressure pipes
Issued 25 August 2021
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fir to proceed to sea. PSCO observed steam valve on deck was leaking steam and water.
74SOLAS(20) I/II(a)
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 27 August 2021
Resolution: Vessel fixed the steam valve fitting and provided class report to confirm repairs.
Engineering › Diesel Engine (propulsion-direct drive) › Governor
Issued 11 November 2017
Resolved
1410 - Propulsion main engine - The condition of the ship and its equipment shall be maintained to ensure that t he ship in all respects will remain fit to a proceed to sea without danger to the ship or persons on board. PSCO observed that the crew was unable to control the main engine propulsion system from the bridge. This same issue was observed by MSU Baton Rouge on 25MAR2017.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 11 November 2017
Resolved 11 November 2017
Resolution: Recieved technician report attesting proper operation of main propulsion controls.