Inspection history · 36
17 June 2026
Administrative Inspection · Vessel Attendance · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8407290
5 June 2026
COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8381673
28 October 2025
Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8259866
24 March 2025
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8096887
17 March 2025
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8094966
8 May 2024
Drydock Exam · Examination of Repairs · Administrative Inspection · Periodic Inspection · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7908998
6 November 2023
Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7822122
2 February 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7631338
14 November 2022
Annual Inspection · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7592350
16 August 2022
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7538109
13 January 2022
Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7379920
28 September 2021
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7322274
16 April 2021
Hull Examination · Construction Oversight · Examination of Repairs · Internal Structural Exam · In-Service Inspection · Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7175788
1 April 2021
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7166940
17 July 2020
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6961982
19 May 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6955773
2 August 2019
Periodic Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6770401
11 June 2019
Administrative Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6710333
7 May 2018
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6405178
23 June 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6184222
31 May 2017
MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6154567
6 April 2016
COI Inspection · MTSA Verification · Drydock Exam · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5848463
19 May 2015
Type not recorded
No type recorded · Marine Safety Detachment Fort Macon · USCG East District (CGD-E) · Activity 5129564
23 April 2015
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5109055
22 April 2015
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5108677
21 April 2015
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5108744
21 April 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5109128
9 February 2015
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5066953
4 February 2015
Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5068044
3 February 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5064493
14 April 2014
MARPOL Annex I Examination · Internal Structural Exam · Deficiency Check · MTSA Verification · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 4835450
11 July 2013
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 4652623
14 June 2013
MTSA Verification · Periodic Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4621716
3 June 2013
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4612508
23 May 2012
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4319517
19 October 2010
Construction Oversight · Cargo Tank Internal · Internal Structural Exam · Administrative Inspection · Initial Certification · Hull Examination
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 3875060
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 17 June 2026
Resolved
The piping shall be arranged so as to avoid excessive stresses at the joints. For sizes exceeding 2 inches in diameter, flanged, welded, or other approved types of joints shall be employed. Vessel reported crack in the drain-back line of the starboard cargo pump packing gland drain. Required to effect permanent repairs to the satisfaction of the USCG after arrival to next port and prior to carriage of cargo.
46 CFR 32.50-15; 705 ac
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 17 June 2026
Resolved 7 July 2026
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 17 June 2026
Resolved
46 CFR 32.50-3
Pumps or other acceptable means shall be used to discharge cargo from gravity type cargo tanks vented at gauge pressure of 4 pounds per square inch or less. Deep-well cargo pump was unable to maintain suction for cargo discharge, requiring use of a submersible pump to complete the offloading of remaining cargo.
Prior to next on-load of cargo, identify the cause of the loss of suction from the deep-well cargo pumps and conduct repairs to the satisfaction of the attending Marine Inspector.
46 CFR 32.50-3
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 July 2026
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 17 March 2025
Resolved
The scantlings, material, and workmanship, the subdivision of cargo spaces, the arrangement of cofferdams, the testing of tanks and cofferdams, shall be at least equivalent to the requirements of a recognized classification society for the particular service specified in the application for the certificate of inspection and permit for the transportation of liquid flammable cargoes in bulk as of the date when the tank vessel was built or as of the date when the vessel
Vessel suffered damage to NO.5 Port cargo tank. Vessel is required to discharge cargo at CITGO Lake Charles and proceed directly to Port Arthur City Dock for permanent repairs to satisfaction of USCG.
Action required: 60 - Rectify deficiencies prior to movement
Due 14 June 2025
Resolved 24 March 2025
Resolution: C/R 36" x 36" deck plate between frame 43-45 by deck house. NDT complete.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 8 May 2024
Resolved
Operational tests and checks of all safety and limit controls, combustion controls, programming controls, and safety relief valves must be conducted by the owner, chief engineer, or person in charge at the inspection for certification, periodic inspection, and when directed by the Officer in Charge, Marine Inspection, to determine that the control components and safety devices are functioning properly and are in satisfactory operating condition. These tests and checks must be conducted in the presence of a marine inspector and must include the following: proper pre-purge, burner ignition sequence checks, operation of the combustion controls, limit controls, fluid flow controls, fluid level controls, high temperature control, proper post-purge control, and verification of the flame safeguard. Thermal Fluid Heater number one failed to turn on high temperature alarm when tested and Thermal Fluid number two failed to alarm post-purge and flame safeguard.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 July 2024
Resolution: Rio technician identified the fuel filters were clogged, replaced, and reran tests with successful activation of high temperature alarm witnessed by MI.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 8 May 2024
Resolved
If your vessel's Certificate of Inspection is renewed less often than annually, the marine inspector must check the settings of the safety or relief valves on all pressure vessels, except cargo tanks, twice every 5 years. No more than 3 years may elapse between any check and its immediate predecessor. Pressure vessels safety relief valves settings check have lapsed minimum time requirement.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2024
Resolution: Vsl rep provided photographs of newly installed safety relief valves to pressure vessels.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 September 2021
Resolved
The following plans must be submitted for Coast Guard review in 110.25-3: elementary one-line diagram of the power system, supported by cable lists, panel board summaries, and other information.
While conducting electrical plan review for the new BWTS, MI found the following distribution panels do not match approved plans: L1-A, L2-A, LB-1B, and LP-1A.
Submit electrical drawings to MSC for revision to match new installation.
46 CFR 31.35-1 & 46 CFR 110.25-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2021
Resolved 13 January 2022
Resolution: Vessel rep provided line diagram and MSC approval letter. Cleared Def. Documents attached.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 3 September 2021
Resolved
Licenses for ship stations in the maritime services will normally be issued for a term of ten years from the date of original issuance, or renewal.
License authorization expired in February 2021.
47 CFR 80.25(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 October 2021
Resolved 3 September 2021
Resolution: Vessel is not required to have a VFH. 04 handheld radios suffice for primary and back-up comms per the conditional occupancy endorsement.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 August 2019
Resolved
The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine; Remote manual shutdowns did not operate freely and secure both #1 and #2 discharge pumps; Correct deficiency prior to movement and to the satisfaction of the Coast Guard.
Action required: 17 - Rectify deficiencies prior to departure
Due 2 August 2019
Resolved 6 August 2019
Resolution: Vsl repaired and replaced emergency shutoff.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 2 August 2019
Resolved
Machinery driving forced-draft and induced-draft fans, fuel-oil transfer pumps, fuel oil unit and service pump and similar fuel-oil pump must be fitted with remote controls outside the space; Starboard side cargo pump house, vent and cargo controls were not operational; make repairs according to 46CFR58.01-25; to the satisfaction of the Coast Guard; prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2019
Resolved 5 August 2019
Resolution: Vsl replaced contols.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 2 August 2019
Resolved
Each system required by this sub-part to be intrinsically safe must use approved components meeting UL 913 or IEC; the forward high level and overfill protection monitor display case and fitting were not intrinsically safe; make repairs meeting requirements of 46CFR111.105-11;to the satisfaction of the Coast Guard; prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Due 5 August 2019
Resolved 5 August 2019
Resolution: Vsl replaces wiring to meet requirments
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 2 August 2019
Resolved
Each system required by this sub-part to be intrinsically safe must use approved components meeting UL 913 or IEC; Starboard junction box housing of facility connection; make repairs meeting requirements of 46CFR111.105-11, to the satisfaction of the Coast Guard; prior to departure.
Action required: 10 - Deficiency Rectified
Due 5 August 2019
Resolved 5 August 2019
Resolution: Vsl repaired juction box wiring.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 August 2019
Resolved
All exposed and dangerous places such as gears and machinery shall be properly protected with covers, guards or rails in order that the danger of accidents may be minimized; Cargo pump prime mover din not have lagging on exhaust; make corrections in accordance with 46CFR32.05-15; to the satisfaction of the Coast Guard; in 14 days.
Action required: 10 - Deficiency Rectified
Due 5 August 2019
Resolved 5 August 2019
Resolution: Vsl replaced lagging.
Construction/Loadline › Hull › Hull Plating
Issued 10 February 2015
Resolved
In conjunction with vessel's Annual COI inspection and ABS Loadline inspection, vessel shall make permanent repairs to 3ft radius inset on port bow, to include repair of the longitudinals 3 through 5, to the satisfaction of the marine surveyor.
Due 15 May 2015
Resolved 22 April 2015
Resolution: Visually inspected exterior of the repair job, ABS Surveyor inspected interior and witnessed the pressure test to 2 psi. all sat.
Electrical › Electric Supply System (service) › Cable
Issued 14 April 2014
Resolved
Starboard side electrical motor winch power feed armored cable is compromised and exposed. Cable needs to be repaired back to original condition as per 46 CFR 111.105-17.
Due 2 May 2014
Resolved 30 April 2014
Resolution: Received report from General Marine Electric LLC attesting to the proper repairs to the electrical motor winch power feed cable located in the hazardous zone.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 14 June 2013
Resolved
PROVE PROPER OPERATION OF HIGH AND OVERFILL ALARMS PRIOR TO USING VAPOR CONTROL SYSTEM.
Action required: 705 - Other - as specified
Due 14 July 2013
Resolved 11 July 2013
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 May 2012
Resolved
Forward anchor light was not operational.
Action required: 705 - Other - as specified
Due 6 June 2012
Resolved 25 May 2012
Resolution: Received evidence of proper operation of forward anchor light.
Deck/Cargo › Cargo Heating › General
Issued 23 May 2012
Resolved
Forward, #1 Thermal fluid heater was not operational. Volcanic tech was onboard attempting repairs. Required tech report after repairs are complete.
Action required: 705 - Other - as specified
Due 6 June 2012
Resolved 1 June 2012
Resolution: Received tech report from Volcanic stating the thermal fluid heater was operational and all safety devices in working order.
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 22 October 2010
Resolved
Prove proper operation of # 1 Thermal Fluid Heater to the satisfaction of the attending Class Surveyor or USCG Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2011
Resolution: Cleared by attending ABS class surveyor
Deck/Cargo › Ballast › Pumps
Issued 22 October 2010
Resolved
Prove proper operation of ballast pump to attending Class Surveyor or USCG Inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 April 2011
Resolution: Cleared by attending ABS surveyor.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 22 October 2010
Resolved
Due to the forward mast being removed during transit to New Orleans; while in transit on Inland Rivers a flashing amber light shall be placed on the bow in accordance with navigation rule 24, upon re-installation of forward mast prove proper placement and operation to the attending Class Surveyor or USCG inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 April 2011
Resolution: Vsl reinstalled forward mast. All lights on mast tested sat.