Records from 2010 to 2023. Most recent: inspection, 25 February 2023.
Inspection history · 24
25 February 2023
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7642064
25 February 2023
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7648393
21 February 2023
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7639584
1 September 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7548776
21 April 2022
Deficiency Check · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7435267
22 February 2022
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7399739
22 February 2022
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7399810
22 February 2022
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7405194
8 December 2021
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7364441
9 October 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7329522
30 May 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7203310
6 September 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6802283
26 February 2019
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6632572
26 February 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6632655
26 December 2018
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6602861
31 October 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6571757
29 October 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6572708
27 October 2018
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6569189
6 September 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6534354
25 August 2018
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6515785
30 October 2014
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 5015126
10 January 2011
Deficiency Check · PII Safety Exam
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3920878
21 November 2010
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3895649
21 November 2010
Ballast Water Examination · In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3896017
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 21 April 2022
Resolved
IN SPACES WHERE PENETRATION OF OIL PRODUCTS IS POSSIBLE, THE SURFACE OF INSULATION SHALL BE IMPERVIOUSTO OIL OR OIL VAPORS.
PSCO OBSERVED OIL SOAKED INSULATION COVERING SIX FEET OF PIPE LOCATED ON LOWEST LEVEL ENGINE ROOM, PORT SIDE, FORWARD, NEXT TO ESCAPE TRUNK. ALSO OBSERVED OIL SOAKED INSULATION UNDER FUEL PUMPS IN PURIFIER ROOM FORWARD.
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 July 2022
Resolution: Vessel provided calss documentation stating the oil leak was rectified and the insulation was renewed. Vessel crew also adjusted door stoppers correcting the 3 doors which failed to close properly. Fleet wide notifications we made.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 21 April 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 30 July 2022
Resolution: Vessel provided calss documentation stating the oil leak was rectified and the insulation was renewed. Vessel crew also adjusted door stoppers correcting the 3 doors which failed to close properly. Fleet wide notifications we made.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Record book of engine parameters
Issued 21 April 2022
Resolved
THE VOLUME OF LOW SULPHER FUEL OILS IN EACH TANK AS WELL AS THE DATE, TIME, AND POSITION OF THE SHIP WHEN ANY FUEL OIL CHANGEOVER OPERATION IS COMPLETED PRIOR TO THE ENTRY INTO AN EMISSION CONTROL AREA OR COMMENCED AFTER EXIT FROM SUCH AN AREA, SHALL BE RECORDED IN SUCH LOGBOOK AS PRESCRIBED BY THE ADMINISTRATION.
PSCO OBSERVED MISSING CHANGEOVER DATA LOG ENTRY FOR 08APR2022.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 April 2022
Resolved 21 April 2022
14 - Pollution Prevention › 146 - MARPOL Annex VI › Technical files and if applicable, monitoring manual
Issued 21 April 2022
Resolved
THE COMPANY SHOULD ESTABLISH PROCEDURES, PLANS, AND INSTRUCTIONS, INCLUDING CHECKLISTS AS APPROPRIATE FOR KEY SHIPBOARD OPERATIONS CONCERNING THE . . . PROTECTION OF THE ENVIRONMENT.
PSCO OBSERVED INCOMPLETE FORM SMS FORM NO. ECR 024 (FUEL OIL CHANGE OVER PROCEDURE RECORD)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 April 2022
Resolved 21 April 2022
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 8 December 2021
Resolved
Current carrying components(Marine Sanatation Device) must be protected from accidental contact by personnel operating or routinely servicing components must be as a minimum be of drip-proof construction or be enclosed within a drip-proof compartment.
PSCO observed flange on marine sanitation device missing three bolts and appeard to be leaking. Also observed wire ties holding cover on pump #2 and smelled a strong odor from the flang area.
33 CFR 159.95 (c)
50,a,c
Due 8 January 2022
Resolved 22 April 2022
Resolution: Vessel provided documentation attesting the that deficiency has been resolved.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Electrical
Issued 8 December 2021
Resolved
Electrical installations shall be such that the safety of passengers, crew and ship from electrical hazards will be ensured.
PSCO observed multiple electrical connections throughout the engine room with gromets or electric puddy missing on stuffing tubes. Also observed old VDR system on bridge was left in place and electrical connections were not secured or removed in effect to avoid possible shock.
74 SOLAS (20) II-1/40.1.3
50,a,c
Due 8 January 2022
Resolved 22 April 2022
Resolution: Vessel provided documentation attesting the that deficiency has been resolved.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 25 August 2018
Resolved
14402-(Pollution Prevention)-Current carrying components (in the marine sanitation device) must be protected from accidental contact by personnel operating or routinely servicing components must be as a minimum be of drip-proof construction or be enclosed within o drip-proof compartment. PSCO observed deteriorated gasket and wastage on access panel of ships sewage tank and apparent odor of chlorine. 33 CFR 159.95 (c) 16a
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 August 2018
Resolved 6 September 2018
Resolution: PSC NOLA received a class report from DNV-GL satisfying the requirement.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 21 November 2010
Resolved
1400 Ship's MDO tank level became insufficient to maintain fuel supply to main & service generator engines, resulting in a loss of propulsion & electric supply. The tank sounding system has tank level indicator, bu no means of indicating an insufficient level. Provide written report of Class verifying correction. 40ac.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 November 2010
Resolved 10 January 2011
Resolution: Verified funciton of installed Low Level Alarm on MDO Service Tank
Engineering › Fuel Oil Service System › Piping
Issued 21 November 2010
Resolved
1400 Observed numerous leaks--drips & several streams--of fuel oil from all 4 marine diesel generators, quick closing supply valves, & fuel supply pipe flange on port side of engine space while vessel was operating on low-sulfur Marine Diesel Oil; this situation is causing a hazard of fire. 60ac--converted to 10 while o/b.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 November 2010
Resolved 21 November 2010
Resolution: All fittings were tightened & leaked oil removed from machinery, piping, & catchment areas.