MAURY USCG vessel records
← All vessels

OCEANIA

Built
2010
Last inspected
10 May 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 10 May 2026
…with no type recorded3
Operational controls None recorded without a removal date
Years with a record 17 calendar years (2010–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

1073985
Flag
UNITED STATES
Maury page id
psix-1073985

Documentation record

Registered dimensions (L × B × D)288.2 ft × 80.1 ft × 18.0 ft
Registered tonnagegross 3,747 / net 3,747
ITC dimensions (L × B × D)288.2 ft × 80.1 ft × 18.0 ft
ITC tonnagegross 5,552 / net 2,330
BuilderNANJING ASLAPRIDE SHIPPING MAKING CO. LTD · NANJING CITY, JIANGSU, CHINA · built 2010
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portAPRA HARBOR, GU
Endorsements, as the file codes themreg
DocumentationValid · issued 11 December 2025 · expires 31 December 2026
Service, as the file records itFreight Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it3747 - Regulatory (Subpart C or D), Gross Ton
5552 - Convention (Subpart B), Gross Ton
3747 - Regulatory (Subpart C or D), Net Ton
2330 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 32 inspections, each with its date, unit and type; 62 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 1 other vessel inspected with it; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

TAMARAW Towing Vessel · MISLE 205909 · 13 October 2020 · activity 7085489TAMARAW Towing Vessel · MISLE 205909 · 24 October 2015 · activity 5752341

Inspection history · 32

10 May 2026 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8370397
15 December 2025 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8283237
15 December 2025 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8284010
10 November 2025 Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 8267753
24 September 2025 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8240797
5 August 2024 Hull Examination · Internal Structural Exam · Drydock Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7958374
19 June 2024 COI Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7934474
28 May 2024 Drydock Extension · Internal Structural Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7921189
30 August 2023 Annual Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7781451
8 August 2023 Damage Survey
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7763652
7 August 2023 Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7762824
30 September 2022 Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7569009
1 April 2022 Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7423848
23 September 2021 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7322734
12 July 2021 Internal Structural Exam · Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7253164
13 October 2020 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7085489
26 August 2020 Deficiency Check
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7042958
6 May 2020 COI Inspection · MARPOL Annex I Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6948960
27 January 2020 Damage Survey
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6896573
1 May 2019 Drydock Exam · Internal Structural Exam · Annual Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6692238
16 January 2019 Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6610887
2 July 2018 Annual Inspection · MTSA Verification · MARPOL Annex I Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6463672
1 August 2017 Annual Inspection · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6227912
18 October 2016 Administrative Inspection · Drydock Exam · Annual Inspection · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6018083
22 June 2016 Examination of Repairs
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5915056
24 October 2015 Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5752341
10 July 2015 COI Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 5179276
25 May 2014 COI Inspection · Drydock Exam · MARPOL Annex I Examination · Internal Structural Exam
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 4867690
26 June 2013 Administrative Inspection · In-Service Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 4596759
1 August 2012 Deficiency Check · Spot Check · Damage Survey
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 4397546
12 September 2011 MARPOL Annex I Examination · Annual Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 4142166
26 October 2010 Initial Certification · Internal Structural Exam · Drydock Exam · MARPOL Annex I Examination
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 3787168

Deficiency record · 62

01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 24 September 2025 Resolved
Certificates of inspection may be revoked or suspended by the Coast Guard where such process is authorized by law. This may occur if the vessel does not meet the requirements of law or regulations in this chapter or if there is a failure to maintain the safety requirements requisite to the issuance of a certificate of inspection. Annual inspection lapsed. 46 CFR 91.01-10 (b) 17C
Action required: 17 - Rectify deficiencies prior to departure
Due 12 November 2025
Resolved 10 November 2025
Resolution: MSU Saipan completed an annual inspection.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 30 August 2023 Resolved
Repair all identified wasted/deteriorated ladders into AFT & FWD Rakes.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 September 2023
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 30 August 2023 Resolved
Repair wasted & dteriorated pad eye for FWD towing chain.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 September 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 30 August 2023 Resolved
Install missing nuts and studs on all identified manhole covers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 13 September 2023
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 30 August 2023 Resolved
Provide SOPEP equipment on board for desposal of the oil and clean-up materials.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 13 September 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 7 August 2023 Resolved
A survey, either general or partial, according to the circumstances, shall be made every time an accident occurs or a defect is discovered which affects the safety of the vessel or the efficacy or completeness of its lifesaving appliances, fire-fighting or other equipment, or whenever any important repairs or renewals are made. The survey shall be such as to insure that the necessary repairs or renewals have been effectively made, that the material and the workmanship of such repairs or renewals are in all respects satisfactory, and that the vessel complies in all respects with the regulations in this subchapter. The vessel operator reported that the vessel allegedly allided with the pier in Tinian. Contact Sector Guam Prevention office and arrange for a Coast Guard marine inspector to attend the vessel prior to cargo operations and prior to departing Guam.-Code 705 46 CFR 91.30-1
Action required: 705 - Other - as specified
Due 14 August 2023
Resolved 8 August 2023
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 30 September 2022 Resolved
VSL assigned load line marks shall be painted white or yellow on a dark ground. Deck line marks is rusted and faded.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2022
Resolved 3 October 2022
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 30 September 2022 Resolved
Side light shall be fitted Matt black inboard screens. The paint on NAV light screens are faded and rusted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2022
Resolved 3 October 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 September 2022 Resolved
Life buoys must be marked in block capital letters with name of the vessel and port. Found two lifebuoys on board marked deferent vessel name.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 October 2022
Resolved 3 October 2022
10 - Safety of Navigation › N/A - No Subsystem › Pilot ladders and hoist/pilot transfer arrangements
Issued 21 July 2020 Resolved
Pilot ladder need to be replaced in kind (USCG approval) due to deterioration of the line.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 August 2020
Resolved 26 August 2020
Resolution: Pilot ladder was removed from the barge; all personnel embarking the barge will only to be conducted via the dock (gangway) or from the tug as per company policy and procedures.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 27 January 2020 Resolved
46 CFR 91.30-1: It was discovered by USCG Sector Guam that USCG certificated deck barge, S7000, allided into F3, at the Port Authority of Guam while docking on or about 22JAN2020, resulting in damages to the continuous weld seam below the waterline on the aft port side shell. Prior to departure from [name withheld], an internal examination of the aft port void must be completed by an attending USCG MI. Prior to entering, the aft port void must be certified safe for entry by a Marine Chemist.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2020
Resolution: Inspected void and observed no damage to bottom hull, side shell and frames.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 January 2019 Resolved
Conducted post-casualty damage survey of barge following grounding. Damage was discovered as follows: In P2 void 1. Outermost port side forward bulkhead bracket is tripped. 2. Outermost port side longitudinal frame is tripped In P3 void 1. Transverse frames #2, 3, 4, & 5 (counting from forward bulkhead) are tripped and damaged 2. Outermost port side aft bulkhead bracket is tripped Submit repair plain for addressing above noted damages - plan may include temporary repairs adequate for barge to continue operating until next scheduled dry-dock Barge shall not be operated until repair plan is agreed to and repair are made to the satisfaction of attending Coast Guard marine inspector.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 29 January 2019
Resolved 7 February 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 January 2019 Resolved
Make barge internal spaces accessible for inspection including obtaining marine chemist certificate.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 January 2019
Resolved 30 January 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 16 January 2019 Resolved
Barge shall not be operate or moved without permission from the Coast Guard until after an inspection of damages related to a grounding occurring on January 15, 2019 is completed to the satisfaction of the Coast Guard attending marine inspector.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 January 2019
Resolved 30 January 2019
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank Fore Peak- Grind and weld repair all cracks in structural members.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Bracket
Issued 24 October 2016 Resolved
Void Tank Fore Peak- Crop and renew gusset on starboard side overhead.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 8P/2 Grind and weld repair all cracks in structural members.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 8P/2- NDT buttered up weld on bottom shell.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 8S/1 - Grind and weld repair all cracks in structural members.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 October 2016 Resolved
Void Tank 8S/1- Crop and renew bottom bulkhead at centerline adjacent Void Tank 8P/1 at frames 43-44
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 October 2016 Resolved
Void Tank 7P/1 - Crop and renew bottome bulkhead at centerline adjacent Void Tank 7S/1 at Frames 36-37.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 October 2016 Resolved
Void Tank 7S/1 - Crop and renew top bulkhead adjacent Void Tank 7S/2 at Frames 39-40.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 October 2016 Resolved
Void Tank 7P/2 - Crop and renew top bulkhead adjacent Void Tank 7P/1.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 7P/2 - Grind and weld repair outboard horizontal stiffener.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Bracket
Issued 24 October 2016 Resolved
Void Tank 7P/2 - Renew 2 Gussets.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Deck Plating
Issued 24 October 2016 Resolved
VOid Tank 6S/1 - Crop and renew deck area including 3 overhead longitudinal stiffeners at Frames 30-31.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Stiffener
Issued 24 October 2016 Resolved
Void Tank 6S/1 - Crop and renew overhead longitudinal stiffeners at Frames 30-32.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Deck Plating
Issued 24 October 2016 Resolved
VOid Tank 6S/1 - Crop and renew deck area including 1 overhead longitudinal stiffener at Frames 34-35 by manhole.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Deck Plating
Issued 24 October 2016 Resolved
Void Tank 6S/1 - Crop and renew deck inset at Frames 29-30.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 October 2016 Resolved
Void Tank 5S/1 - Crop and renew bottom bulkhead adjacent Void Tank 5S/2 at Frames 26-28.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 October 2016 Resolved
Void Tank 5S/1 - Crop and renew bottom bulkhead adjacent Void Tank 5P/1 at Frames 26-29.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Stiffener
Issued 24 October 2016 Resolved
Void Tank 5S/1 - Crop and renew damaged longitudinal stiffener aft.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 5S/1 - Grind and weld repair all cracks located in top longitudinal stiffeners.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Deck Plating
Issued 24 October 2016 Resolved
Void Tank 5S/1 - Crop and renew deck area including overhead longitudinal stiffeners at Frames 27-28.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 October 2016 Resolved
Void Tank 5P/1 - Crop and renew top bulkhead adjacent Void Tank 5P/2 at Frames 27-28.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Deck Plating
Issued 24 October 2016 Resolved
Void Tank 5P/1 - Crop and renew deck area including overhead longitudinal stiffeners at Frames 26-28.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 October 2016 Resolved
Void Tank 4S/2 - Crop and renew centerline top bulkhead adjacent Void Tank 4S/1.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 4S/2 - Grind and weld repair crack at bottom of ladder.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Transverse Frame
Issued 24 October 2016 Resolved
Void Tank 4P/2 - Crop and renew buckled section of transverse web-frame bottom.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Bracket
Issued 24 October 2016 Resolved
Void Tank 4P/2 - Renew 1 bent gusset.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 October 2016 Resolved
Void Tank 3S/1 - Crop and renew bottom centerline bulkhead adjacent Void Tank 3P/1 at Frames 11-14.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 24 October 2016 Resolved
Void Tank 3S/1 - Crop and renew bottom centerline bulkhead adjacent Void Tank 3P/1 at Frames 15-16.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 3P/1 - Grind and weld repair cracks at vertical stiffener under manhole.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 2S/2 - Grind and weld repair cracks at horizontal stiffeners.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 October 2016 Resolved
Void Tank 2P/1 - Crop and renew buckled forward top bulkhead adjacent Void Tank 3P/1.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 24 October 2016 Resolved
Void Tank 1S/1 - Crop and renew buckled forward top bulkhead adjacent Void Tank 2S/1.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Hull › Weld
Issued 24 October 2016 Resolved
Void Tank 1P/1 - Grind and weld repair crack by ladder.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Deck Plating
Issued 24 October 2016 Resolved
Crop and renew main deck inset stbd side at Frames 15-16.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Deck/Cargo › Cargo Stowage › General
Issued 24 October 2016 Resolved
Crop and renew damanged areas of cargo containment walls.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Deck/Cargo › Cargo Stowage › General
Issued 24 October 2016 Resolved
Crop and renew wasted sections of horizontal stiffeners on the containment wall.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Construction/Loadline › Structures › Superstructure
Issued 24 October 2016 Resolved
Crop and renew damaged stanchions for lifelines around periphery of the barge.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 November 2016
Resolution: USCG and/or ABS witnessed repairs to the satisfaction of attending USCG inspector.
Documentation › Safety/Response Plans/Programs › SOPEP
Issued 10 July 2015 Resolved
Provide a valid SOPEP.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2015
Resolved 14 July 2015
Resolution: ProvideD a valid SOPEP.
Construction/Loadline › Structures › Superstructure
Issued 10 July 2015 Resolved
Provide/repair missing stancions on the weatherdecks
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2015
Resolved 28 July 2015
Deck/Cargo › Mooring/Anchoring › Capstan
Issued 10 July 2015 Resolved
Demonstrate proper operation of the fwd winch
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2015
Resolved 28 July 2015
Deck/Cargo › Towing › Terminal Gear
Issued 10 July 2015 Resolved
Demonstrate proper operation of the tow bridle terminals.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2015
Resolved 28 July 2015
Construction/Loadline › Structures › Door
Issued 10 July 2015 Resolved
Demonstrate proper operation of the doors on the cargo wall.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2015
Resolved 28 July 2015
Construction/Loadline › Penetrations › Flange Pad
Issued 10 July 2015 Resolved
Provide missing studs in the various manhole/covers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2015
Resolved 28 July 2015
Documentation › Certificates/Documents › Certificate of Inspection
Issued 10 July 2015 Resolved
Provide a method to store the required documents on the vessel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 August 2015
Resolved 28 July 2015
Construction/Loadline › Structures › Deck Plating
Issued 2 June 2014 Resolved
During USCG attendance of the subject vessel in drydock, a number of structural deficiencies were noted. A repair proposal for the structural deficiencies was created by owner's rep to the satisfaction of the attending USCG Marine Inspector. The repairs are to be witnessed and tested by the cognizant ABS surveyor and he/she is to include them in their final report for the drydocking period.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 July 2014
Resolution: Received class report attesting to the satisfactory completion of all necessary repairs.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 1 August 2012 Resolved
Show proof of valid certificate of documentation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 August 2012
Resolution: Received copy of COD, valid from August 1, 2012, expires August 31, 2013.
Documentation › Certificates/Documents › Stability Letter
Issued 1 August 2012 Resolved
Show proof of valid stability letter.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2012
Resolution: Received copy of stability letter, issued by ABS on August 21, 2012.
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 1 August 2012 Resolved
Show proof of approved cargo securing manual.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 April 2013
Resolution: Administratively cleared, not required.

Recorded names · 1

S-7000 (2015–2020). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.