Records from 2021 to 2026. Most recent: inspection, 1 April 2026.
Inspection history · 35
1 April 2026
MTSA/ISPS Verification · Annual Inspection · Vessel Attendance · MSP Annual Oversight
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8370029
5 February 2026
Administrative Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8306363
10 December 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8281904
9 December 2025
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8280284
21 September 2025
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8238113
18 September 2025
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8237167
17 August 2025
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 8212299
26 July 2025
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8194779
15 June 2025
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8159389
10 June 2025
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8156200
27 May 2025
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 8144609
18 May 2025
Type not recorded
No type recorded · Sector Detroit · USCG Great Lakes District (CGD-GL) · Activity 8147100
9 April 2025
COI Inspection · MTSA/ISPS Verification · Administrative Inspection · MSP COI Oversight
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 8108570
10 May 2024
Periodic Inspection · MTSA/ISPS Verification · Deficiency Check · MSP Periodic Oversight
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7929726
22 April 2024
Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7899167
17 January 2024
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7850253
25 September 2023
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7802328
6 September 2023
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7789179
20 June 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7718594
7 June 2023
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7706141
22 May 2023
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7724802
11 May 2023
Underwater Inspection in lieu of Drydock · Administrative Inspection
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7685740
17 April 2023
Administrative Inspection · MSP Annual Oversight · Annual Inspection · MSP Select Additional Oversight – Risk Assessment
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7669703
15 February 2023
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7636984
13 January 2023
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7621783
22 October 2022
Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 7581861
25 July 2022
MSP Annual Oversight · ISM Oversight · Annual Inspection · Ballast Water Examination · Administrative Inspection · MTSA/ISPS Verification
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7508685
19 July 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7578548
5 July 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7549314
28 June 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7543867
26 May 2022
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7467044
16 April 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7441946
21 February 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7406924
8 January 2022
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 7384438
9 November 2021
MTSA/ISPS Verification · COI Inspection · MSP Initial Reflag · Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 7347803
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 26 July 2025
Resolved
Whenever a vessel is deprived of the service of a member of its complement, and the master is unable to find appropriate credentialed personnel to man the vessel, the master may proceed on the voyage, having determined the vessel is sufficiently manned for the voyage. Vessel reported sailing short one (1) 3rd Engineer, the captain has determined the vessel is safe to sail.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 August 2025
Resolved 1 August 2025
Resolution: Received an email from the Master of the vessel stating that a replacement 3AE had signed on and COI manning is back to full compliment
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 24 June 2025
Resolved
Means shall be provided to control leaks of flammable liquids and means shall be provided to limit the accumulation of flammable vapors. The ventilation of machinery spaces shall be sufficient under normal conditions to prevent accumulation of oil vapor. The Engine room ventilation air intake has oil accumulation starting at the intake screen throughout the ventilation ducting to the discharge screens. Oil is being atomized and spread throughout the engine room on the machinery equipment. All machinery space screens, ducting, and fans are to be cleaned and free of oil. Provide means for preventing re-occurrence of oil and oil vapor entry and build up in the machinery space ventilation systems.74 SOLAS (2009) II-2/ 4.1.1, II-2/4.1.2, and II-2/4.2.2.2.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 June 2025
Resolution: Class DNV surveyed vessel and found ducting and fans were cleaned. See Survey report N2676910 in deficiency documents.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for rescue boats
Issued 24 June 2025
Resolved
The rescue boat launching arrangements shall be such that the rescue boat can be boarded and launched in the shortest possible time. The means of launching the rescue boat utilizing ship’s power was found inoperable. Repair to the davit was completed by the crew but needs manufacturer certification of repairs and proper operation.74 SOLAS (2014) III/17.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 June 2025
Resolution: Class DNV surveyed vessel and found ducting and fans were cleaned. See Survey report N2676910 in deficiency documents.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2025
Resolved
Ships shall be maintained in compliance with the electrical requirements of a classification society which is recognized by the Administration. 220V Switchboard low insulation faults present.74 SOLAS (2020) II-1/3-1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 July 2025
Resolved 16 October 2025
Resolution: DNV surveyor found in order. See survey statement in deficiency documents.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 June 2025
Resolved
Ships shall be maintained in compliance with the electrical requirements of a classification society which is recognized by the Administration. 440V Emergency Switchboard low insulation faults present.74 SOLAS (2020) II-1/3-1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 31 July 2025
Resolution: The 440V Ground was determined to be due to a faulty cargo reefer container plugged into the cargo deck deck outlets. Once the unit was identified and disconnected the fault was rectified. DNV verified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 June 2025
Resolved
After any survey of the ship under regulation 10 has been completed no change shall be made in the machinery and the equipment and other items covered by the survey. Sludge transfer piping was modified with flanges added on for use of a diaphragm pump. 74 SOLAS (2020) 1/11(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2025
Resolved 29 December 2025
Resolution: Documentation confirming that the modified arrangement of the sludge transfer piping has been
accepted following proper technical evaluation and DNV approval procedures. Survey report saved to deficiency documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 24 June 2025
Resolved
After any survey of the ship under regulation 10 has been completed no change shall be made in the machinery and the equipment and other items covered by the survey. Modifications to Main Engine local emergency control station were made and prevent the local control station from being operational per the posted operating instructions.74 SOLAS (2020) 1/11(b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2025
Resolved 21 August 2025
Resolution: DNV verified PMI VIT system modifications to the Main Engine local emergency control station were reviewed against the MAN service report dated 2025-08-05. During the onboard verification, it was confirmed that the local emergency control is satisfactory.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 24 June 2025
Resolved
Ships shall be maintained in compliance with the structural requirements of a classification society which is recognized by the Administration. Boiler Blow down overboard piping from valve flange overboard is corroded. Determine condition of pipe and replace if found outside of tolerance with class DNV rules.74 SOLAS (2020) II-1/3-1
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 August 2025
Resolution: The boiler overboard line has been cleaned and inspected during the shipyard and the UT measurements completed by DNV approved Service Supplier Qingdao Haihui Thickness Measurements Co. LTD. Avererage readings were 15.7 % waistage from original 7.5 mm.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 24 June 2025
Resolved
Ships shall be maintained in compliance with the mechanical and electrical requirements of a classification society which is recognized by the Administration. Amperage Gauges on the 3 start air compressor operating panels were found inoperable.74 SOLAS (2020) II-1/3-1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2025
Resolved 30 September 2025
Resolution: DNV provided survey statement that the defective ammeters on each of the three auxiliary air compressor control operating panels #1, 2 & 3 were renewed and tested and noted to be in good working order. See survey statement in deficiency documents.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 24 June 2025
Resolved
Control locations of any fixed gas fire-extinguishing system shall have clear instructions relating to the operation of the system having regard to the safety of personnel. The instructions on the CO2 system control box for the cargo holds incorrectly states that opening the control box door will shut down ventilation. The ventilation shutdowns are in separate space.74 SOLAS(2009) II-2/7.1.1, FSS Code Chapter 5.2.1.3.3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2025
Resolved 30 September 2025
Resolution: Class DNV provided survey statement indicating the correct instructional placard was installed. See survey report in deficiency documents for CC 65.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 June 2025
Resolved
Fire doors in stairway enclosures shall be capable of remote release. The stairway door at “F” level did not self-close during multiple tests of the smoke detection/general alarm and local test release button had inconsistent results. Door is be kept closed during normal operations until repair to releasing mechanism is made.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 19 August 2025
Resolution: The "F" Level Door magnetic release was reapaired and successfully tested onboard the ship. Video was provided to class.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 24 June 2025
Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the Company. In meeting these requirements, the Company should ensure that inspections are held at appropriate intervals; any non-conformity is reported with its possible cause, if known; appropriate corrective action is taken; and records of these activities are maintained. #1 and #2 SSDG’s found containing many fuel and oil leaks from generators and equipment. Covers for flywheel on all 3 SSDG’s were found missing. Intake air filters were found oil and debris covered. Filters for Generator Housing found dirty. #3 SSDG reported not fully operational since April 2025 due to timing issues an inability to operate under a full load. Oil and debris found around all 3 start air compressors. Exhaust ducting in engine room found missing screens and oil and debris found in many of the ducts. Conduct external audit of Safety Management System for the adequacy of planned maintenance of SSDG’s, air compressor’s, ventilation systems including keeping the machinery spaces clean and maintained from flammable liquids, vapors, and debris. (705) To be completed in 90 days.74 SOLAS (2020) IX/3.1, ISM Regulation 10
Action required: 705 - Other - as specified
Due 24 September 2025
Resolved 16 November 2025
Resolution: ISM Additional Audit by ABS on 13 October 2025 were plan accepted.Audit Report saved to #13 deficiency documents.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 24 June 2025
Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the Company. In meeting these requirements, the Company should ensure that inspections are held at appropriate intervals; any non-conformity is reported with its possible cause, if known; appropriate corrective action is taken; and records of these activities are maintained. Defects identified by the ship that affect the safety and/or operations of the ship were not reported to class such as hydraulic leak on emergency steering pump, leak on emergency fire pump, and #2 LT pump temporary patch. Conduct external audit reviewing class reporting requirements.(705) To be completed in 90 days.
Action required: 705 - Other - as specified
Due 24 September 2025
Resolved 16 November 2025
Resolution: ISM Additional Audit by ABS on 13 October 2025 were plan accepted.Audit Report saved to #13 deficiency documents.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 24 June 2025
Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the Company. In meeting these requirements, the Company should ensure that inspections are held at appropriate intervals; any non-conformity is reported with its possible cause, if known; appropriate corrective action is taken; and records of these activities are maintained. Gauges throughout the engine room were broken, not calibrated, or maintained. Conduct external audit of adequacy of the SMS for the maintenance of engine room gauges. (705) Complete in 90 days.74 SOLAS (2020) IX/3.1, ISM Regulation 10.
Action required: 705 - Other - as specified
Due 24 September 2025
Resolved 16 November 2025
Resolution: ISM Additional Audit by ABS on 13 October 2025 were plan accepted.Audit Report saved to #13 deficiency documents.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 June 2025
Resolved
The condition of the ship shall be maintained to conform with the provisions of the present regulations in all aspects will remain fit to proceed to sea without dangers to the ship or persons onboard. A-class door # E.13 was found with its automatic closure device missing and A-class door # A.20 latch was inoperable. 74 SOLAS(2024) Ch I/11
Action required: 10 - Deficiency Rectified
Resolved 24 June 2025
Resolution: Automatic closure device installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 June 2025
Resolved
Ships shall be maintained in compliance with the mechanical requirements of a classification society which is recognized by the Administration. #1 SSDG had fuel leaks present in several of the fuel pumps and return lines. Pooling of fuel oil found on frames. Oily soot, dirt and debris found on top of the prime mover next to the turbo. Evidence of leaks present dripping down the side of the engine block from many of the spray shield covers. Fly wheel opening not covered and evidence of oil found dripping downside of flywheel housing.74 SOLAS (2020) II-1/3-1
Action required: 10 - Deficiency Rectified
Resolved 24 June 2025
Resolution: #1 SSDG was cleaned, fittings were tightened on return and and supply lines, o-rings replaced on fuel pumps as required. SSDG's ran under load for tests.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 24 June 2025
Resolved
Ships shall be maintained in compliance with the mechanical requirements of a classification society which is recognized by the Administration. #2 SSDG had fuel leaks present in several of the fuel pumps, supply and return lines. Pooling of fuel oil found on frames and behind spray shields. Loose fittings present in fuel lines.74 SOLAS (2020) II-1/3-1
Action required: 10 - Deficiency Rectified
Resolved 24 June 2025
Resolution: #2 SSDG was cleaned, fittings were tightened on return and and supply lines, o-rings replaced on fuel pumps as required. SSDG's ran under load for tests.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 June 2025
Resolved
Ships shall be maintained in compliance with the electrical requirements of a classification society which is recognized by the Administration. #2 Generator Reverse Power Relay was found not operational.74 SOLAS (2020) II-1/3-1
Action required: 10 - Deficiency Rectified
Resolved 24 June 2025
Resolution: Reverse Power Relay for #2 SSDG was satisfactorily tested.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 10 June 2024
Resolved
The control systems shall be such that the services needed for the operation of the main propulsion machinery and its auxiliaries are ensured through the necessary automatic arrangements. During testing, the salt water standby cooling pumps #1, 2, & 3 were unable to auto start upon loss of primary cooling pump. 74 SOLAS (09) II-1 Reg 53.4.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2024
Resolved 16 August 2024
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 10 June 2024
Resolved
Electrical installations shall be such that electrical services essential for safety will be ensured under various emergency conditions and safety of crew members from electrical hazards will be ensured. Multiple extinguished lights in the paint locker. In addition, found light fixture's grounding cable not properly fastened.
74 SOLAS (09) II-1 Reg 40.1.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 12 June 2024
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 10 June 2024
Resolved
Lifebuoys complying with the requirements of paragraph 2.1.1 of the Code shall be capable of quick release from the navigation bridge; lifebuoys with lights and those with lights and smoke signals shall be equally distributed on both sides of the ship. The port side bridge wing lifebuoy's grab lines are dry rotted and disintegrated.
74 SOLAS (20) Chap III Reg 7.1.1.3
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 12 June 2024
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 10 June 2024
Resolved
The function of the fixed fire detection and fire alarm systems shall be periodically tested to the satisfaction of the Administration by means of equipment producing hot air at the appropriate temperature, or smoke, or aerosol particles having the appropriate range of density or particle size or other phenomena associated with incipient fires to which the detector is designed to respond. The vessel did not have the approved type of testing equipment for heat and flame detectors on board. 74 SOLAS (14) Chap II-2 Reg 7.3.3.2
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 17 June 2024
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 10 June 2024
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all aspects remain fit to proceed to sea without danger to the ship or persons on board. The bosun storeroom's bench grinder is missing it's safety shield. 74 SOLAS (20) Chap I/11
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 12 June 2024
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil filtering equipment
Issued 17 April 2023
Resolved
Oil filtering equipment shall comply with paragraph 6 of this regulation. The Re-circulating facilities should be so configured as to prevent under all operating conditions any by-pass of the oily-water separator. Re-circulating facilities do not meet the requirements of MEPC 107(49)/6.1.1 and as installed allows for the by-pass of the oily water separator through the sampling point.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 May 2023
Resolved 8 May 2023
Resolution: Sampling point in way of overboard line has been permanently blocked and sealed
with tracing number.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 17 April 2023
Resolved
The main inlets and outlets of all ventilation systems shall be capable of being closed from outside the spaces being ventilated. The means of closing shall be easily accessible as well as prominently and permanently marked and shall indicate whether the shut off is open or closed. The port upper stack vents did not fully close when activated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 May 2023
Resolved 8 May 2023
Resolution: Defective actuator was replaced by new spare parts. Test carried out and found in
order.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 17 April 2023
Resolved
46 CFR 199.70(b)(3): Each lifejackets must be marked in block capital letters with the name of the vessel and with Type 1 retro-reflective material approved under approval 160.018. The crew's lifejackets was not marked with the vessel's name.
Action required: 10 - Deficiency Rectified
Resolved 20 April 2023
Resolution: Vessel captain submitted photos and statement that all lifejackets have been marked with the vessel's name IAW cite.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 2 August 2022
Resolved
The condition of the ship and its equipment shall be maintained to ensure that the ship remains fit to proceed to sea without danger. Following conditions were observed on the cargo deck/poop deck exterior requiring repair/replacement:
1. Aft stores crane control housing door broken & gasket deteriorated.
2. Stbd & Port sludge pump emergency stop housing controls broken, secured with jumpers.
3. High voltage outdoor connection for reefer container units (Poop deck, fwd house bulkhead) is exposed to environment and observed with consistent condensate exposure from reefer containers. Overhead drip shield to be installed.
4. Stbd acetylene storage room dog seized
5. No. 4 Hold Exhaust (Mushroom vent - stbd inboard) - broken flame screen connection to vent.
Repairs to be made to satisfaction of RO.
74SOLAS(2020)I/11(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2022
Resolved 26 August 2022
Resolution: Accepted by RO, and extended to 21SEP22
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 2 August 2022
Resolved
Openings in freeboard decks shall be protected by an enclosed superstructure of equivalent strength and weathertightness. MIs observed port aft safety equipment store room with exposed piping penetration in aft bulkhead by watertight door leading to stern (ivo winches). Piping penetration believed to be designed for shore power connection; however, no cabling sealed through exposed hole leading from stern into storage room. Satisfactory repairs to be made to restore weathertightness to bulkhead penetration to satisfaction of RO.
ICLL (1988) Reg. 18(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2022
Resolved 26 August 2022
Resolution: Rectified via DNV survey report
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 11 January 2022
Resolved
46 USC 53102
The vessel owner/operator is responsible for preparing a report, known as a "gap analysis," of vessel systems, equipment, or other items that meet a standard different for the US statutory requirements in accordance with NVIC 01-13, Change 1. The submitted "gap analysis" must be updated to address the following:
- Item I.B.1 - correct date of issuance for ITC
- Item I.C.2 - addresses loading manual but
references damage stability under 'action'
- Item II.B.2 - states fire pump is rated for 8 bar,
Item II.B.4 states the fire main piping system
working pressure is 8 bar, but Item II.B.3 states
the fire main system provides a low-pressure alarm
at 1.6MPa (16 bar) meaning the system operates in
an alarm state.
- Item II.B.9 - does not address flexible loops on
fixed CO2 system
- Item III.A and B - states rescue boat is on
starboard side in III.A and port side in III.B
- Item IV.B.1.iv and IV.D.4 and D.5 - sections
address starting air system but state different
design capacity and system design pressures
- Item VII.B.3 - action states "safety valve exceeds
MAWP... and should be replaced prior to
reflagging." Confirm this was completed or replace.
Recommend addressing following items:
Pilot and embarkation ladders, fire dampers, rudder
angle indicators, ship's whistle, windows class A,
and SCBA's required by SOLAS II-2/19
Action required: 17 - Rectify deficiencies prior to departure
Due 11 February 2022
Resolved 23 February 2022
Resolution: Changed from 17 to 50. Rec'd and accepted.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 11 January 2022
Resolved
Means shall be provided for automatically giving audible warning of release of fire extinguishing medium for a minimum of 20 seconds into spaces in which personnel normally work or to which they have access during normal operations before the medium is released. The submitted "gap analysis" dated October 20, 2021, Rev. 0 (Item II.B.9) stated the vessel’s HFO purifier room is to be equipped with a time delay.
Action required: 10 - Deficiency Rectified
Due 11 February 2022
Resolved 14 January 2022
Resolution: CC issued and cleared. Upon further research, system is accepted as installed at time of reflag in compliance with DNV rules.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/14.2.1
Fire detection and fire alarm systems shall be kept in good working order. Fire detection panel on bridge was found with standing fault “Central 1 Board RB 4 Earth Fault Positive, Fault (155) Rectifier Board” and two false alarms sounded during the inspection.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
74 SOLAS (20) II-2/14.2.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV, servicing report provided by vessel
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/14.2.1
Fire detection and fire alarm systems shall be kept in good working order. Cargo hold smoke detection sample extraction system main screen found filled with incomprehensible writing, with no clear indications as to status or use.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2022
Resolved 14 January 2022
Resolution: New panel installed and verified by DNV, cleared CA603 on 18Mar2022.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/14.2.1.2
Fire-fighting systems shall be kept in good working order and readily available for immediate use. Multiple failures were found during testing of UV detectors at MDE, SSDG, Incinerator, and Boiler including failure of detector, alarm in engine room not sounding, alarm not displaying on the local fire detection panel (water mist system), and no alarms indicated on the repeater panel on the bridge. Label local panel at engine room entrance.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV, servicing report provided by vessel
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/14.2.1.2
Fire-fighting systems shall be kept in good working order and readily available for immediate use. Sprinkler pump used to meet the requirements for effectively cooling the under-deck cargo spaces for 1.1-1.6 (excluding 1.4S) cargoes was found inoperable in a “trip” state with seized pump and missing discharge pressure gauge. Carriage of 1.1-1.6 (excluding 1.4S) cargoes under deck is prohibited until proper operation is demonstrated.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 January 2022
Resolution: Verified by DNV
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 8 January 2022
Resolved
74 SOLAS (20) II-1/31.3 46 CFR 62.50-30(c)
Where the main propulsion and associated machinery, including sources of main electrical supply, are provided with various degrees of automatic or remote control and are under continuous manual supervision from a control room the arrangements and controls shall be so designed, equipped and installed that the machinery operation will be as safe and effective as if it were under direct supervision with additional US requirements for periodically unattended machinery spaces. Multiple deficiencies were found with the vessel’s automation system.
a) The crew was unable to demonstrate the following pumps in standby mode: high temperature & low temperature cooling pumps, seawater pumps, & lube oil pumps. (Corrected)
b) Reliable operation of purifiers were unable to be demonstrated due to missing control PLCs, physical damage, and inoperable controls. (CC Issued)
c) Tank level indicator panel is faulty and not supplying accurate tank level information to the crew. Additionally, the high and low level alarms for all fuel and lube oil run through the indicator panel which is showing a constant fault on the main ECR control and monitoring system, providing no means of automated indication of high or low tank levels. (CC issued)
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2022
Resolved 14 January 2022
Resolution: CA 604 extended to 31Mar2022.
CC 6 extended to 14Apr2022.
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 8 January 2022
Resolved
74 SOLAS (20) II-1/51
An alarm system having a connection to the engineers’ public rooms and to each of the engineers’ cabins shall be provided indicating any fault requiring attention. Alarm panels in staterooms, common spaces, and the bridge indicate different standing alarms.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 8 January 2022
Resolved
74 SOLAS (20) II-1/35
Machinery spaces of category A shall be adequately ventilated so as to ensure that when machinery therein are operating at full power in all weather conditions including heavy weather, an adequate supply of air is maintained to the spaces for the safety and comfort of personnel and the operation of the machinery. The exhaust ventilation damper for the emergency generator room does not open upon energizing of the emergency generator, potentially causing the EDG to overheat and machinery space atmosphere to be forced into the surrounding accommodations spaces.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/35.2
An efficient bilge pumping system shall be provided. Bilge valves are remotely controlled from the Bilge System Control Panel in the ECR and this panel is the only control location for the valves, with indicators and alarms in the cargo control room and on the bridge. Cargo hold bilge valves BG218V and BG224V and engine room bilge valve BG25V do not open and engine room bilge valve BG27V will not close.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/35.2
An efficient bilge pumping system shall be provided. Cargo hold #3 bilge alarm failed to sound during operational testing. Test all bilge alarms and prove proper operation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 8 January 2022
Resolved
74 SOLAS (20) I/11(a)
The ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Bilge level alarm in forward Pump Room is indicated as alarm for Bow Thruster room bilge on alarm panels.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/10.1.1.2
Fire-extinguishing appliances shall be readily available. The semi-portable extinguisher in the emergency generator room is in an area that would be inaccessible in the event of the most probable fire locations within the space.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/4.1.1
Means shall be prevented to control leaks of flammable liquids. Excess oil and oil soaked rags and debris are present beneath both SSDG #1 and #2. Clean. Identify source and repair.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/4.1.1
Means shall be provided to control leaks of flammable liquids. There are multiple hydraulic leaks in the steering gear room on the steering pumps and the hydraulic storage tank and transfer pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/4.1.1
Means shall be provided to control leaks of flammable liquids. Excess oil and oil soaked lagging as well as damaged lagging, was found throughout forward pump room.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/9.1.3
The fire integrity of divisions shall be maintained at openings. The door to the ECR has broken internal framing leaving it not structurally sound.
Action required: 17 - Rectify deficiencies prior to departure
Due 8 February 2022
Resolved 14 January 2022
Resolution: DNV verified installation, 08Mar22.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 8 January 2022
Resolved
74 SOLAS (20) I/11(a)
The ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Combustible material and rubbish is stored throughout engineering spaces and accommodations, preventing access to switchboards, water mist control panel, restricting movement around machinery, and interfering with egress.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
08 - Alarms › N/A - No Subsystem › General alarm
Issued 8 January 2022
Resolved
74 SOLAS (20) I/11(a)
The ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. During operational testing, the General Alarm lights did not activate and the audible alarm was too quiet to be heard over ambient noises in the engine room.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 8 January 2022
Resolved
74 SOLAS (20) I/11(a)
The ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Lighting in cargo hold #3 is ineffective as a significant amount of bulbs were out creating a slips, trips, and fall hazard for personnel. Replace light bulbs throughout all cargo holds to ensure adequate illumination.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 8 January 2022
Resolved
74 SOLAS (20) II-1/26.1
Machinery shall be so installed and protected as to hazards with due regard being given to moving parts. Guards on three seawater pumps are missing, creating a hazard to crew.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
10 - Safety of Navigation › N/A - No Subsystem › Pilot ladders and hoist/pilot transfer arrangements
Issued 8 January 2022
Resolved
74 SOLAS (20) V/23.3
Arrangements shall be provided to enable the pilot to embark and disembark safely on either side of the ship. Starboard side pilot ladder sustained damage and unserviceable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 January 2022
Resolved
74 SOLAS (20) II-1/40.1.3
The safety of the crew and ship from electrical hazards will be ensured. Paint Locker explosion proof light found with body improperly connected to mount, rendering it ineffective.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 8 January 2022
Resolved
74 SOLAS (20) III/8 and 37
Muster lists and emergency instructions shall be exhibited in conspicuous places throughout the ship and shall be prepared before the vessel proceeds to sea. Station Bill has been copied from another fleet vessel and shows incorrect equipment arrangement, incorrect muster stations, and incorrect vessel name.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 14 January 2022
Resolution: Verified by DNV
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 8 January 2022
Resolved
74 SOLAS (20) II-2/4.1.1
Means shall be prevented to control leaks of flammable liquids. The main diesel engine has leak at fuel pump on cylinder #6 with a bucket catching fuel beneath, presenting a fire hazard and potential operational impacts, temporary repair made.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 14 January 2022
Resolution: Verified by DNV
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 8 January 2022
Resolved
46 CFR 61.40-10
Periodic safety test procedures (PSTPs) must be written in a step-by-step or checklist format specific to the vessel. The PSTPs were written utilizing a sister vessel’s documents and need to be revised to the match the design and systems onboard and incorporate DNV comments from approval letter.
UMS is suspended until automation can be proved as effective as if it were under direct supervision, with due regard to deficiencies addressing fire detection, #5, #6, #8, #10, #17, and #25.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 March 2022
Resolved 14 January 2022