Records from 2016 to 2025. Most recent: inspection, 26 August 2025.
Inspection history · 16
26 August 2025
PSC B
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 8214964
4 March 2024
Type not recorded
No type recorded · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7873684
19 July 2022
PSC B
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7506986
15 August 2020
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7033574
11 August 2020
Ballast Water Examination · PSC B
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7027908
29 March 2020
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6932767
25 March 2020
Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6931470
25 March 2020
Type not recorded
No type recorded · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7219863
9 December 2019
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6876162
19 August 2019
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6787988
15 July 2019
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6751440
26 June 2018
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6453315
14 June 2017
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6175646
13 July 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5939954
13 July 2016
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5940469
1 June 2016
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5893734
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 19 July 2022
Resolved
Where the emergency source of electrical power is a generator, it shall be provided with a source of emergency electrical power unless an emergency generator is provided capable both of supplying the services and of being automatically started and supplying the required load as quickly as is safe and practicable subject to a maximum of 45s. Emergency generator is capable of taking on load under test.
74 SOLAS 09 CONS. II-1 43.3.1.3
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2022
Resolution: The Vessel is to received a class survey report from DVN and Liberia flag dispensation letter attesting to the rectification of the deficiency. Dispensation letter attached to deficiency.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 19 July 2022
Resolved
Access doors and access hatch covers normally closed at sea, intended to ensure the watertight integrity of internal openings, shall be provided with means of indication locally and on the bridge showing whether these doors or hatch covers are open or closed. A notice is to be affixed to each such door or hatch cover to the effect that it is not to be left open. Nos. 86 port and 124 port watertight doors were found with tape disabling the indicators and no. 52 starboard watertight door was found tied open with the indicator disabled by a hose section.
74 SOLAS 09 CONS. II-1 13-1.3
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2022
Resolution: The Vessel obtained attestation by the recognized organization to the rectification of the diciciency and completed a limited external audit of safety management system.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 19 July 2022
Resolved
The company should establish procedure to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. Crew did not follow the procedures detailed in the safety management system. Vessel TGM 2.10.7 A3 item l, fire doors and watertight doors was not completed. Vessel is to complete external audit.
74 SOLAS 20 CONS IX 5
ISM PART A/10.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 July 2022
Resolution: Vessel undertook a limited external audit or their safety management system.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 July 2022
Resolved
Fire-fighting systems and appliances shall be kept in good working order and readily available for immediate use. Water mist system nozzle above the fuel purifiers was leaking.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 July 2022
Resolution: Vessel replaced nozzles, verified by attending RO.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 19 July 2022
Resolved
Oil fuel pipes, which, if damaged, would allow oil to escape from a storage, settling or daily service tankhaving a capacity of 500L and above, shall be fitted with a cock or valve directly on the tank capable of being closed from a safe position outside the space concerned in the event of a fire occuring in the space in which such tanks are situated. Valve for high side lube oil tank is leaking air.
Action required: 10 - Deficiency Rectified
Due 19 July 2022
Resolved 19 July 2022
Resolution: The valve for high side lube oil tank air leak was rectified.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 19 July 2022
Resolved
General arrangement plans shall be permanently exhibited, showing clearly for each deck the fire-extinguishing appliances, etc. Plans shall be kept up to date; any alterations thereto shall be recorded as soon as practicable. Fire-extinguishing appliance locations do not match the plan near the BWTS.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 20 July 2022
Resolution: Vessel moved appliances back to approved locations, verified by attending RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 August 2020
Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are untended. PSCO observed a temporary repair on a leaking sea water inlet pipe to the ship's Main Diesel Engine.
Condition: Damaged By Earlier Event
Action required: 15 - Rectify deficiencies by next port
Resolved 15 August 2020
Resolution: Received satisfactory class report from DNV-GL attesting the permanent repair and operation of the jacket water feed line.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 11 August 2020
Resolved
Doors fitted in boundary bulkheads of machinery spaces of category A shall be reasonably gastight and self-closing. The entrance door to the steering gear room, and door to a storeroom within the steering gear room both had broken self-closing hinges. Vessel replaced hinges with spare parts onboard; repairs were verified by PSCO.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 11 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 March 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel reported knocking in main engine scavenge unit number 4 and stopped main engine while departing Port Hueneme. Vessel reported loose bolts were found after equipment overhaul the previous day, and that bolts were able to be removed and damage to stuffing box able to be repaired. - SOLAS 74a I/11 - 16a
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 April 2020
Resolved 28 March 2020
Resolution: Deficiency cleared after review and acceptance of DNVGL survey report.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboats
Issued 19 August 2019
Resolved
CITE: SOLAS 74(2014) III/34 ACTION: 17ac
LSA - 4.4.6.3
All life-saving appliances and arrangements shall comply with the applicable requirements of the code. The engine shall be capable of operating for not less than 5 min after starting from cold with the lifeboat out of the water. Free fall lifeboat engine was inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Due 19 August 2019
Resolved 23 August 2019
Resolution: Recieved Satisfactory Class report attesting to the repairs conducted on the lifeboat.
Engineering › Diesel Engine (propulsion-direct drive) › Distributor (air start)
Issued 13 July 2016
Resolved
Means shall be provided to ensure that the machinery can be brought into operation from the dead ship condition without external aid. Vessel was unable to op[erate in astern propulsion while mooring.
Condition: Design Flaw
Action required: 17 - Rectify deficiencies prior to departure
Resolved 19 August 2016
Resolution: recieved class report attesting to the repair.