Records from 2011 to 2026. Most recent: inspection, 19 May 2026.
Inspection history · 27
19 May 2026
MTSA Verification · Drydock Exam · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8376450
19 March 2026
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8328730
17 January 2026
Type not recorded
No type recorded · USCGC TIGER SHARK (WPB 87359) · USCG Heartland District (CGD-H) · Activity 8297866
27 June 2025
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8141518
9 July 2024
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7954388
14 June 2024
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7918412
2 June 2023
MTSA Verification · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7686006
4 April 2023
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7662441
3 April 2023
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7664204
24 October 2022
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7575380
27 August 2022
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7562928
18 May 2021
Administrative Inspection · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7184859
4 November 2020
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7089509
25 October 2020
Damage Survey · In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7083646
25 October 2020
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7085093
4 February 2020
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6902876
3 December 2019
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6866729
30 July 2019
Initial Certification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6767602
26 October 2016
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6029881
28 September 2016
Type not recorded
No type recorded · Station Pensacola · USCG Heartland District (CGD-H) · Activity 6011207
5 February 2015
DAPI Audit · Deficiency Check · Industry Initiated Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5068138
22 January 2015
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5057020
18 November 2014
Type not recorded
No type recorded · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5026270
8 April 2013
Type not recorded
No type recorded · Station New Orleans · USCG Heartland District (CGD-H) · Activity 4565497
10 May 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4307584
11 April 2012
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4287775
26 September 2011
Industry Initiated Exam · DAPI Audit
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4154525
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 June 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under normal and emergency conditions. MI witnessed cracked grey water pipe leaking onto stbd generator.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 14 June 2024
Resolved 18 June 2024
Resolution: Piping was fixed by installing new piping.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 June 2024
Resolved
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 June 2024
Resolved 18 June 2024
Resolution: Installed an entirely new life float.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 2 June 2023
Resolved
If a dedicated storage cabinet is provided it must be either a flammable liquid storage cabinet that satisfies UL 1275 or FM Approvals Standard 6050. Flammable liquid storage cabinet on deck was found corroded and the doors did not close properly to meet the FM standard. Remove and replace with a new cabinet. 46 CFR 142.225(c).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 July 2023
Resolved 27 June 2023
Resolution: Received photographic evidence of proper installatin of new flammable liquids cabinet.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 April 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. On April 4, 2023, the MORGAN RAY was involved in an allision which resulted in damage to the deck plating. The master attested to a loss of propulsion controls. 46 CFR 143.205
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 4 April 2023
Resolution: Technician report and in-person inspection by CG confirm the the port side control valve portion loose on the mount to the head. Tightend the control valve and tested engine, satisfactory test.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 24 October 2022
Resolved
Each life float and rigid buoyant apparatus must be fitted with a lifeline, pendants, a painter, and floating electric water light approved under approval series 161.010.
Life float was missing floating electric water light, vessel name, and weak link.
46 CFR 141.325(c)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 October 2022
Resolution: Installed ne lifefloat, new light, new weak link and the lifefloat was stencilled as required.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 October 2022
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space.
No emergency lighting or non-electric, phosphorescent adhesive lighting strips present in accommodation spaces.
46 CFR 143.410(b)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: Vessel installed phosphorescent adhesive lighting strips on accomodation spaces.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 October 2022
Resolved
For lifebuoys; the water light must be attached by the lanyard with a corrosion-resistant clip to allow the water light to be quickly disconnected from the lifebuoy.
The water light on 5 lifebuoys were not attached by a lanyard with a corrosion-resistant clip.
46 CFR 141.360(c)(3)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: Vessel personnel installed lanyards with corrossion resistant clips on all 5 lifebuoys.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 October 2022
Resolved
The master must ensure that all lifesaving equipment is properly maintained and ready for use at all times.
The plug on 1 lifebuoy has rotted out.
46 CFR 141.230
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: New lifebuoy was procured and installed on the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 October 2022
Resolved
Ring life buoys shall be of first class workmanship and free from any defects materially affecting their appearance or serviceability.
4 of the lifebuoys have retro-reflective tape that is no longer functional.
46 CFR 160.050-4(f)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: New retroreflective tape was installed on life buoys.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 24 October 2022
Resolved
Each floating electric waterlight shall meet the requirements of ANSI/UL 1196.
3 of the electric waterlights attached to the lifebuoys do not meet current standards.
46 CFR 161.101-2
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: New lights were procured and installed as required in order to meet regulation.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 24 October 2022
Resolved
Electrical conductors passing though watertight bulkheads must be installed so that the bulkhead remains watertight.
Cables passing through a watertight bulkhead were found to be installed in such a way that it was no longer watertight.
46 CFR 143.400(h)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: Vessel personnel installed stuffing tube.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 October 2022
Resolved
Prior to getting underway for the first time on a particular towing vessel, each crewmember must receive a safety orientation on: the location, operation, and use of lifesaving equipment.
Life jacket donning procedures placard did not match life jackets at the stowage location.
46 CFR 140.410(b)(2)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 November 2022
Resolved 25 October 2022
Resolution: New placard for the lifejackets was posted.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 24 October 2022
Resolved
All fire-suppression and detection equipment and systems on board a towing vessel must be maintained in accordance with the attached nameplate, manufacturer's approved design manual, or as otherwise provided in any TSMS applicable to the vessel.
Smoke detector in pilot house did not function as designed.
46 CFR 142.240(b)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 24 October 2022
Resolved 24 October 2022
Resolution: Vessel personnel replaced batteries and tested detector with satisfactory results.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 May 2021
Resolved
Essential systems or equipment must be regularly tested and examined. Tests and examinations must verify that the system or equipment functions as designed. If a component is found unsatisfactory, it must be repaired or replaced.
The top of the MSD was rusted through and leaking sewage odors into the engine room. Repair or replace top of MSD tank to create a vaporless seal to the satisfaction of CG Marine Inspector.
46 CFR 143.245 (a)
16C
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2021
Resolved 18 May 2021
Resolution: Company replaced top of MSD tank and submitted video of new top to Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 18 May 2021
Resolved
Emergency lighting must be provided for all internal crew working and living areas.
No escape route lighting was installed in crew berthing areas. Install egress phosphorescent signs to satisfaction of CG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 20 January 2022
Resolution: Vessel installed required emergency lighting. All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 18 May 2021
Resolved
Each lifebuoy with a floating electric water light must have a lanof at least 3' but not more than 6', securing the water light around the body of the lifebuoy.
Splice line around body of lifebuoy, not grabline.
46 CFR 141360(c)(4)
16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2021
Resolved 18 May 2021
Resolution: Vessel submitted photo documentation of corrections to line mounting to buoy.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 18 May 2021
Resolved
The person in command of a documented vessel must have on board that vessel the original Certificate of Documentation currently in effect for that vessel.
Vessel was displaying an expired COD. Provide the current COD to the satisfaction of the CG Marine Inspector.
46 CFR 67.313 (a)
60C
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 18 May 2021
Resolution: Vessel submitted photo of COD found after leaving vessl.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 18 May 2021
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists oran essential system develops problems that require attention. The following alarms must be provided:
High bilge levels.
Vessel could not demonstrate audible bilge high level alamrs for the 02 installed units.
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 18 May 2021
Resolution: Vessel hired electrician to trace system and found loose connection. Submitted video of system operating correctly.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 April 2021
Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the 50% of the vessels that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 30 days. If an inspection is not completed prior to this date, the action for this deficiency will change to a code 60 (Rectify deficiencies prior to movement) and the vessel will no long be permitted to operate.
Vessel received 835v on 26 Oct 20 requiring the vessel to apply for a new COI due to change in compliance options.
46 CFR 136.202(a)
Action required: 60 - Rectify deficiencies prior to movement
Resolved 10 February 2022
Resolution: Issued VSL CG Option COI
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 26 October 2020
Resolved
Vessel is required to have a COI under U.S. Coast Guard option or TSMS option. Vessel's TPO is no longer active, rendering the COI invalid. Vessel shall obtain a new COI before operating. Due to potential hurricane, vessel may shift barges as necessary for storm preparation at [name withheld] Facility.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2020
Resolved 15 April 2021
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 26 October 2020
Resolved
Vessel suffered damage after allision with bridge. Vessel shall provide repair proposal.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2020
Resolved 15 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 26 October 2020
Resolved
Port generator tachometer was reading 0 rpms while generator was running & providing power. Port generator tachometer must be operable and reading accurate rpms.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2020
Resolved 15 April 2021
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 26 October 2020
Resolved
Port shaft seal was leaking excessively. Port shaft seal must be tightened so water is not streaming into vessel.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 26 October 2020
Resolved 15 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 October 2020
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. Post-allision, the starboard propulsion engine is reported to be inoperable. Submit repair proposal to be approved by USCG Inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 25 October 2020
Resolved 15 April 2021
Resolution: Recieved Tech Report
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 25 October 2020
Resolved
Each towing vessel must be equipped with a marine radar. Radar reported inoperable due to significant damage to superstructure from bridge allision. Submit repair proposal to be approved by USCG Inspector.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 25 October 2020
Resolved 15 April 2021
Resolution: Recieved Tech Report
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 4 February 2020
Resolved
All fire detection systems must be serviced every 12 months. The fire detection panel was last serviced on Apr 2018, almost 2 years overdue for servicing, no other proof could be found for recent servicing. From crew discussions, management was aware of the issue for several months. 46CFR142.240
Action required: 30 - Ship detained
Resolved 8 February 2020
Resolution: see narrative
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 4 February 2020
Resolved
The valve must be installed in the fuel piping directly outside of the fuel oil supply tank. The valve must be operable from a safe place outside the space where the valve is installed. The pin was missing on the stbd side remote fuel shut off valve, so if the valve was pulled during a fire, the valve would not close. While pulling the handle manually, it appears the valve does not close completely. 46CFR142.260
Action required: 30 - Ship detained
Resolved 8 February 2020
Resolution: see narrative
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 4 February 2020
Resolved
A B–II portable fire extinguisher must be located near the storage room or cabinet. This is in addition to the portable fire extinguishers required by Tables 142.230(d)(1) and 142.230(d)(2) of § 142.230. This B-II extinguisher was missing from its required location, place a B-II there as soon as possible. 46CFR142.230(d)
Action required: 30 - Ship detained
Resolved 8 February 2020
Resolution: see narrative
08 - Alarms › N/A - No Subsystem › General alarm
Issued 4 February 2020
Resolved
Each towing vessel must be fitted with a general alarm that: Is activated at each operating station and can notify persons on board in the event of an emergency; Is capable of notifying persons in any accommodation, work space, and the engine room. The general alarm light was inoperable in the bottom of the engine room, a light needs to be installed on the top of the engine room, and the alarm could not be heard on the main deck when the engine room doors were shut, install an alarm on the outside deck. 46CFR143.235
Action required: 30 - Ship detained
Resolved 8 February 2020
Resolution: see narrative
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 4 February 2020
Resolved
The safety of the towing vessel is the responsibility of the master and includes: Adherence to the provisions of the COI; Compliance with the applicable provisions of this subchapter; compliance with the TSMS, if one is applicable to the vessel; and supervision of all persons onboard in carrying out their assigned duties. Licensed operators and crew not familiar with the TSMS and what unsafe conditions are, when to report, etc. conduct refresher training by management to all crew. 46CFR140.210
Action required: 30 - Ship detained
Resolved 8 February 2020
Resolution: see narrative
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Other (ISM)
Issued 4 February 2020
Resolved
The officer in charge of a navigational watch must conduct a navigation assessment for the intended route and operations prior to getting underway. No records in the vessel logbook, and licensed operators unfamiliar with navigation assessments, voyage plans, etc, conduct refresher training and what items require logging. 46CFR140.635
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 February 2020
Resolution: see narrative
Fire Fighting › Fixed Fire Detection System › Control Panel
Issued 22 January 2015
Resolved
Installed fixed fire detection panel is inoperable.
Action required: 705 - Other - as specified
Due 22 January 2015
Resolved 5 February 2015
Resolution: The fire detection panel has been serviced and is now operating properly.