HUEMUL is a 2008 tank ship. The Coast Guard has recorded 22 inspections since 2017, most recently in February 2025, along with 9 deficiencies and 1 operational control.
Records from 2017 to 2025. Most recent: inspection, 26 February 2025.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Tonnage as PSIX records it13666 - Convention (Subpart B), Gross Ton 6687 - Convention (Subpart B), Net Ton 22062 - Dead Weight, Metric Ton 29414 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 19 May 2021Resolved
The comapany and ship shall comply with the requirtements of the ISM Code. The comapny should establish procedures to ensure that the e ship is mantianed in conformity with the provisions of the relevant rules and regiualtions which may be eatablished by the company. In meeting these requirements , the comapny should enaure that; inspectionss are held at appropairate intervals , any non coformity is reported, appropriate corrective action is taken, and records of these activities are maintianed. In accordance with the vessel's PMS [381.01,850.9508, and 850.95.03] Electrical installations on the deck are to be inspected every 90 days. Addtionally, tank gauging is to be inspected every 30 days. As delineated in the following deficieciencies, the vessel's comapny failed to ensure that maintenance and inspections of electrical installations, gauging systems, and deck water spray were being held at appropraite intervals. Note: comapny implimented a new PMS system on 11May, but vessel's crew was unable to provide records of prevention PMS records since the company's aquireing of the vessel in Jan21.
An internal audit, focusing on maintenance and inspections, is required within 30 days.
74SOLAS(14) IX/5.1
ISM Code 10.1
ISM Code 10.2
50C
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 1 September 2021
Resolution: PSCO verified satisfactory ISM internal audit report with corrective action for relevent non-conformities
Means shall be provided for montiroing ullage spaces contiaing a gas blanket to ensure that the correct atmosphere is being maintained. When overheating or overcooling could result in a adangerous condition, an alarm system wahich monitirs, the cargo temperature shall be provided. PSCO obseraved instrumentation on the cargo control room cargo monitoring system were inoperable. The system was producing a "Failure" code for the ullage, temp., and pressure. Accurate readings were not provided.
74SOLAS(14) VII/10.1
IBC 9.1.3.4
IBC 7.1.5.4
15AC
Action required: 705 - Other - as specified
Resolved 14 July 2021
Resolution: Received class report attesting to rectification.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 19 May 2021Resolved
Electrical equipment, cables, and wiring shall not be installed in the hazardous locatons unless it conforms with the standards not inferior to those acceptable to the organization. PSCO observed multiple electrical installations susceptaible to mechanical damage. The electircal lighting above #6 Center port is cracked. Note: light is in a hazardous locaton. Glan packing in mutliple electrical installations are losse rendering electrical not explosion proof.
74SOLAS (14) VII/ 10.1
IBC 10.1.4
40AC
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2021
Resolution: Received class report attesting to rectification.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 19 May 2021Resolved
A water-spray system of sufficient capacity shall be provided to blanket effectively the area surrounding the loading manifiold, the exposed deck piping associated with product handling , and the tank domes. PSCO observed 2 hooles in the water-spray systme piping. Each hole was two to three inches wide. In addition, multiple noxzzle heads were clogged cuasing insufficient coverage.
74SOLAS (14) VII/ 10.1
IBC 15.8.29
40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2021
Resolution: Received class report attesting to rectification.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 19 May 2021Resolved
Each vessel vapor connection flange must have a permanently attached .05 inch diameter stud atleast 1.0 inch long projecting outward from the flange face. PSCO observed vapor connection flange stud projecting inward.
46CFR39.2001(e)
40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 14 July 2021
Resolution: Received class report attesting to rectification.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Safety and environment policy
Issued 25 July 2019Resolved
the company and the ship shall comply with the requirements of the ISM Code. The company shouldensure that the polict is implemented and maintained at all levels of the organization, both ship-based and shore-based. Vessel unaware of transfer procedures and failed to follow procedures and arrangement manual as well asthe cargo operations plan from the integrated managment systems which caused the cargo tank to over fill and discharge oil. Recommend ISM Audit.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 3 September 2019
Resolution: A class report has been received from ABS attesting to the completion of SMS audit and issued a corrective action report. Company has implimented corrective actions.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 19 March 2019Resolved
SELF-CLOSING FIRE DOORS OF THE SAME FIRE INTEGRITY STANDARDS SHALL BE FITTED IN THE ENCLOSURE.
THE SELF-CLOSING FIRE DOORS LEADING TO THE MEANS OF ESCAPE FROM THE MACHINERY SPACE OF CATAGORY A WERE ALL FOUND TO BE MISSING THE LOCK, LEAVING A HOLE IN THE DOOR COMPROMISING THE A-60 FIRE-BOUNDARY RATING. 74SOLAS(14)II-2/13.4.2.1.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 19 March 2019
Resolved 19 March 2019
Resolution: REPAIRS MADE TO FIRE DOOR FIXING THE A-60 BOUNDARY.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 29 October 2018Resolved
01 - 02134 - To discharge ballast water into the water of the United States, the master, owner, operator, agent or person in charge of a vessel subject to 151.2025 of this subpart must either ensure that the ballast water meets the ballast water discharge standard in 151.2030(a), use an AMS as described in 151.2030(a)(3), or ballast with water from a U.S public water sustem, according to the schedule in paragraph (b) of this section. Subject vessel, of a keel laid date 09OCT06 and ballast water capacity of 9610.90 meters cubed, is past its compliance daate per the implementation schedule in 33CFR151.2035(b). Currently vessel's installed BWTS is inoperable. - 33CFR151.2035
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 13 November 2018
Resolved 13 November 2018
Resolution: Vessel submitted Ballast Water report to NBIC and Ballast water system is operational.
Fire Fighting › Fixed Pressure Water-Spraying Fire Extinguishing System › Nozzles
Issued 19 January 2018Resolved
Conditions of the ship and its equipment shall be maintained to conform. PSCO noted approximitly 10 nozzles not providing water as designed. IBC 1.5.3 40 a/c
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 19 January 2018
Resolved 31 January 2018
Resolution: SEC HOU-GAL PSC Branch received a class report satisfying the requirement
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.