Records from 2014 to 2025. Most recent: inspection, 10 June 2025.
Inspection history · 12
10 June 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8151041
19 September 2023
PSC B
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7790360
27 October 2021
PSC B
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7340685
16 January 2019
ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6607704
10 December 2017
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6321711
5 December 2017
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6318204
27 November 2017
Ballast Water Examination · PII Safety Exam · ISPS III Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6311377
22 May 2017
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6152204
17 May 2017
Ballast Water Examination · MARPOL Annex I Examination · PII Safety Exam · ISPS II Exam · ISM Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6145751
1 March 2016
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 5819695
12 February 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5814250
9 October 2014
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5002560
Operations/Management › Vessel Safety Management › Safety/Environmental Protection Policy
Issued 18 May 2017
Resolved
Every company should develop, implement, and maintain a safety management system (SMS). The ship is not following its SMS; Doc NO:s-07.10.10 Rev NO:07 for environmental pollution prevention. Objective evidence has been obtained that shows the ships crew is discharging oily water overboard in a way that is contradictory to the SMS.
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received class report satisfying requirement and attended vessel.
Operations/Management › Pollution › Retention of Oily Mixture
Issued 18 May 2017
Resolved
Any discharge into the sea of oil or oily mixtures shall be prohibited. Objective evidence has been obtained that documents the bilge tank was pumped directly overboard on 27 APR 2017 through the installed Fire/Bilge/Ballast pump utilizing an unapproved piping modification.
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Operations/Management › Pollution › Retention of Oily Mixture
Issued 18 May 2017
Resolved
Any discharge into the seo of oil or oily mixtures shall be prohibited. Objective evidence has been obtained that documents on 12 May 2017 the engine room bilge was washed with the ships fire hose and then pumped directly overboard with the ships installed bilge pump.
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Operations/Management › Pollution › Retention of Oily Mixture
Issued 18 May 2017
Resolved
Any discharge into the sea of oil or oily mixture shall be prohibited. Objective evidence has been obtained that documents fuel oil and lube oil purifier sludge was re-directed from the approved dicharge as verified on the ships drawings. The sludge was re-directed to portable buckets which were then dumped directly overboard.
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attened vessel.
Operations/Management › Pollution › Retention of Oily Mixture
Issued 18 May 2017
Resolved
Any discharge into the sea of oil or oily mixture shall be prohibited. Objective evidence has been obtained that documents temporary unapproved modifications to the stripping lines of the No. 1 and No. 2 Waste Oil Tank as verified on the ships drawings. This facilitated the use of portable buckets to collect oily water from the stripping line which was then dumped directly overboard.
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Engineering › Bilge Water Management System › Valve
Issued 18 May 2017
Resolved
No change shall be made in the structural arrangements, machinery, equipment, and other items covered by the survey. The one way device for the bilge oil tank valve which connected it to the bilge pump manifold was removed and re-installed. Proper operation of this valve is uncertain.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Pollution Prevention/Response › Prevention Equipment › Oily Residue (sludge/slop) Tank
Issued 18 May 2017
Resolved
No change shall be made in the structural arrangements, machinery, equipment, and other items covered by the survey. The current Waste Oil Tank piping does not match the ships drawings. An additional connection and blank flange were installed on overflow piping for the #2 Waste Oil Tank.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Documentation › Logs/Records › Oil Record Book
Issued 18 May 2017
Resolved
The Oil Record Book shall be in the form specified in appendix III to this Annex. Multiple discrepancies were found between the daily sounding log and weekly sounding in the Oil Record Book.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Documentation › Certificates/Documents › IOPP Certificate
Issued 18 May 2017
Resolved
The IOPP shall be drawn up in the form corresponding to the model given in appendix II to this Annex. The ships "Bilge Primary Tank" is not listed on the ships IOPP certificate.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 18 May 2017
Resolved
To ensure the safe operation of each ship and to provide a link between the company and those onboard, every company should designate a person or persons ashore having direct access to the highest level of management. The shipboard SMS manual does not identify or address a designated person or persons ashore.
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2017
Resolved 30 May 2017
Resolution: Received Class report satisfying requirement and attended vessel.
Lifesaving › Buoyant Smoke Signals › General
Issued 17 May 2017
Resolved
Self activating smoke signals required by Reg III/7.1.3 shall be provided with a quick release arrangement that automatically release and activate the signal. The self activating smoke signals attached to the lifebuoys on the bridge are not in a quick release arrangement.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 25 May 2017
Resolution: Coast Guard attended vessel and found proper work of equipment to clear the deficiency.
Lifesaving › Lifeboat › Propulsion Engine
Issued 17 May 2017
Resolved
Instructions for on board maintenance (Work No.20674-5) require lifeboat fuel oil to be drained and changed at intervals of 3 months. Vessel has not been completing this maintenance and is unable to produce records of such.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 May 2017
Resolved 25 May 2017
Resolution: Coast Guard attended vessel and observed documentation that the oil was changed to clear deficiency.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 1 March 2016
Resolved
While conducting galley exam, PSCO observed use of deep fat fryer with no fixed fire suppression system.
CITE: SOLAS 14 II-2/10.6.4
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 31 March 2016
Resolved 17 May 2017
Resolution: Received documentation from Flag correcting deficiency.