Records from 2016 to 2025. Most recent: operational control imposed, 11 July 2025.
Inspection history · 28
10 July 2025
Deficiency Check · PSC B · Administrative Inspection · COC-CHEM & TVE Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8174027
2 July 2025
Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8172956
9 March 2025
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8090689
18 December 2024
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8099956
23 August 2024
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7987529
28 June 2024
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7937664
18 May 2023
COC-CHEM & TVE Annual · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7691287
11 March 2023
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7649065
10 March 2023
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7649067
19 May 2022
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7452684
14 March 2022
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7411359
14 June 2021
COC-CHEM & TVE Annual · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7221734
11 March 2021
Administrative Inspection
Administrative · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 7154469
3 March 2021
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7149851
22 May 2020
PSC C · COC-CHEM & TVE Renew
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6955866
22 May 2019
Ballast Water Examination · COC-CHEM & TVE Annual · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6689926
16 January 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6619585
23 May 2018
Type not recorded
No type recorded · USCG Heartland District · USCG Heartland District (CGD-H) · Activity 6422769
22 May 2018
ISPS II Exam · COC-CHEM & TVE Renew · Ballast Water Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6417726
2 February 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6348489
23 May 2017
COC-CHEM & TVE Annual · Ballast Water Examination · ISPS II Exam
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 6149082
24 January 2017
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6076845
26 August 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5984015
26 August 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6015767
5 July 2016
In-Service Inspection · COE-Dockside
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5926115
5 July 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5929699
5 July 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5932674
14 May 2016
COC-CHEM & TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5876845
08 - Alarms › N/A - No Subsystem › Inert gas alarm
Issued 10 July 2025
Resolved
For tankers of 20,000 tonnes deadweight and upwards constructed on or after 1 July 2002 but before 1 January 2016, the protection of the cargo tanks shall be achieved by a fixe inert gas system in accordance with the requirements of the Fire Safety Systems Code, as adopted by resolution MSC.98(73), except that the Administration may accept other equivalent systems or arrangments, as described in paragraph 5.5.4.
74SOLAS(20) II-2 4.5.5.1.1
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 July 2025
Resolution: Replaced defective O2 sensor, checked and tested satisfactory.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 20 May 2023
Resolved
Before the ship leaves port and at all times during the voyage, all life saving appliances shall be in working order and ready for use.
PSCO observed 01 quick realease, 4kg lifebuoy, cracked and without replacement onboard.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2023
Resolved 23 May 2023
Resolution: Vessel procured 02 new 4kg lifebuoys.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 20 May 2023
Resolved
A food ration for each person the lifeboat is permitted to accommodate; these rations shall be kept in airtight packaging and be stowed in a water tight container.
PSCO observed multiple food rations in the lifeboat that were no longer air tight.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 June 2023
Resolved 23 May 2023
Resolution: Vessel procured 50 additional lifeboat rations.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 19 May 2022
Resolved
The arrangements for providing foam shall be capable of delivering foam to the entire cargo tanks deck area as well as into any cargo tank the deck of which has been ruptured. During testing of the deck foam monitors, PSCO observed internal components of foam monitor #1 jettisoned overboard impairing the ability of the foam monitor's pressure and capability of delivering foam to sufficient deck area. Rectify deficiency prior to cargo operations.
74 SOLAS (2020) II-2/ 10.8.1.1 FSS Code (2015) 14.2.1.1
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2022
Resolved 20 May 2022
Resolution: Received and accepted class report from RINA stating the deficiencies were cleared.
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 19 May 2022
Resolved
As an additional safeguard against the possible leakage of hydrocarbon liquids or vapours back from the deck main, means shall be provided to permit this section of the line between the valve having positive means of closure referred to in paragraph 2.3.1.4.3 and the valve referred to in paragraph 2.3.1.3 to be vented in a safe manner when the first of these valves is closed. PSCO observed leaking air from actuator to bleed valve 6051. Rectify deficiency prior to cargo operations.
74 SOLAS (2020) II-2/ 4.5.5.1.1
FSS CODE (2007) 15.2.3.1.4.4
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2022
Resolved 20 May 2022
Resolution: Received and accepted class report from RINA stating the deficiencies were cleared.
Operations/Management › Ballast Water Managment › Ballast Water Discharge
Issued 23 May 2017
Resolved
33 CFR 151.2025-Ballast Water Management Requirements-Vessel was discharging ballast during cargo operations in U.S. waters without an approved ballast water management system installed. The vessel had been in drydock after the extended compliance date and no supplemental extension was requested by the vessel owner.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 15 June 2017
Resolved 25 May 2017
Resolution: Vessel owner applied for and received a supplemental extension to the extended compliance date. New compliance date to have BWMS installed is next scheduled drydock after November 1, 2016 per CG-OES.
Operations/Management › Ballast Water Managment › Submission of Report
Issued 23 May 2017
Resolved
33 CFR 151.2060(b)(3)-Ballast Water Reporting Requirements-Vessel conducted complete ballast water exchange on voyage from Carteret NJ to Lake Charles, LA and did not submit the reporting form to NBIC.
Action required: 705 - Other - as specified
Due 23 May 2017
Resolved 23 May 2017
Resolution: Vessel submitted the ballast water reporting form during Port State Control exam.
Construction/Loadline › Hull › Hull Plating
Issued 5 July 2016
Resolved
0938-Hull damage impairing seaworthiness-The condition of the ship and it equipment shall be maintained to ensure that the ship will remain fit to proceed to sea. At MM 86.6 the vessel was struck by the UTV OMAHA resulting in a 4 foot by 2 inch hull breach on the port side. provide class report attesting to repair plans. SOLAS 74 I/11 - 60 a/c
Action required: 705 - Other - as specified
Resolved 6 July 2016
Resolution: Received class report recommending vessel be allowed to transit to repair facility.
Construction/Loadline › Hull › Side Shell
Issued 5 July 2016
Resolved
0938-Hull damage impairing seaworthiness -The condition of the ship and it equipment shall be maintained to ensure that the ship will remain fit to proceed to sea. At MM 86.6 the vessel was struck by the UTV OMAHA resulting in a 4 foot by 2 inch hull breach on the port side. Make permanent repairs prior to departure from port SOLAS 74 I/11
Action required: 17 - Rectify deficiencies prior to departure
Resolved 9 July 2016
Resolution: Received class report stating permanent repairs have been made.