Records from 2020 to 2024. Most recent: inspection, 14 October 2024.
Inspection history · 14
14 October 2024
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8018544
13 October 2024
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8020696
23 April 2024
Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7900351
29 March 2024
Damage Survey
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7887033
26 February 2024
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7870450
25 February 2024
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7869768
8 July 2023
Administrative Inspection · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7736487
25 September 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7320329
6 August 2021
PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7278861
17 December 2020
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7113261
4 December 2020
Appeal
Administrative · Commandant (CG-CVC) · Activity 7115647
17 November 2020
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7096601
17 November 2020
Deficiency Check · PSC A
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7096645
17 November 2020
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7096953
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 29 March 2024
Resolved
The machinery, boilers, and other pressure vessels associated piping systems and fittings should be of a design and construction of adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces, and other hazards.
PSCO observed seawater and high temp alarms in alarm history which lead to a reduction in RPMs. Make repairs and test cooling water system and main engine to satisfaction of recognized classification society. 74 SOLAS(20) II-1/26.1 60ac PTM.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 29 March 2024
Resolution: CREWS CHANGED SW PUMP SUCTION FROM HIGH SEA CHEST TO LOW SEA CHEST AND RELEASED AIR FROM THE PUMP MAKING THE PUMP RUN NORMALLY. CLASS REPORT ATTATCHED SATISFYING THE REQUIREMENTS.
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 17 November 2020
Resolved
Before the ship leaves port and at all times during the voyage, all lifesaving appliances shall be in working order and ready for immediate use. PSCO's observed 30 out of 31 immersion suits are unserviceable due to inoperable zippers and unsealed seams.
-74SOLAS(14)III/20.2
Action taken: 30a.b.c.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 17 November 2020
Resolved 19 November 2020
Resolution: Ship acquired 31 new immersion suits ready for immediate use.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 17 November 2020
Resolved
All life-saving appliances and arrangements shall comply with the applicable requirements of the Code. Unable to verify the validity and testing requirements of all pyrotechnics on board. No SOLAS or valid Coast Guard approvals are available.
-74SOLAS(14)III/34
Action Taken: 60a.c.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 17 November 2020
Resolved 19 November 2020
Resolution: Shp acquired type approved pyrotechnics for bridge and lifeboats
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 17 November 2020
Resolved
Fire fighting systems and appliances shall be kept in good working order and readily available for immediate use. The hydrant on the starboard bridge wing had excessive leaking at the valve stem.
-74SOLAS(14)II-2/14.2.1.2
Action Taken: 10c
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 17 November 2020
Resolved 17 November 2020
Resolution: Crew repaired and satifactorily tested hydrant for the PSCE
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 17 November 2020
Resolved
The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which maybe established by the company. 30 of 31 immersion suits were unservicable and were not identified by the ships crew in the three months since new ownership of the vessel. Recommend audit of the SMS within 30 days.
-74SOLAS(14)IX/3.1 & ISM code A/10.1
Action Taken: 50a.b.c
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 December 2020
Resolved 17 December 2020
Resolution: USCG satisfied with Audit Report, Audit Inspection Report, and SMS Finding Note sent from the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 November 2020
Resolved
Not less than two lifebuoys shall be provided with lifebuoy self-activating smoke signals complying with 2.1.3 of the code and be capable of quick release from the navigating bridge. Unable to verify validity and testing requirements of self-activating smoke signlas on navigating bridge. No SOLAS or vaild Coast Guard approvals are available.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 December 2020
Resolved 17 December 2020
Resolution: USCG satisfied with the 06 pictures and delivery receipt sent from the vessel.