Records from 2016 to 2025. Most recent: inspection, 7 October 2025.
Inspection history · 22
7 October 2025
COC-CHEM & TVE Annual · PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8245049
20 August 2025
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8214539
27 June 2025
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8168647
27 September 2024
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8008358
20 August 2024
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7985146
27 October 2023
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7816825
12 October 2023
PSC B · COC-CHEM & TVE Annual
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7805889
28 January 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7628428
29 October 2022
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7585816
17 October 2022
Administrative Inspection · Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7578822
28 September 2022
COC-CHEM & TVE Renew · PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7565124
21 December 2020
Administrative Inspection · PSC B · COC-CHEM & TVE Annual · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7114102
14 January 2020
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6890867
16 December 2019
Ballast Water Examination · ISPS III Exam · COC-CHEM & TVE Renew
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6874421
3 February 2019
Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6619285
8 January 2019
ISPS II Exam · Ballast Water Examination · COC-CHEM & TVE Annual
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 6606673
3 October 2018
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6554795
2 October 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6552948
14 August 2018
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6517792
13 August 2018
In-Service Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6510227
5 December 2017
COC-CHEM & TVE Renew · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6317498
7 November 2016
ISPS II Exam · Ballast Water Examination · COC-TVE Annual
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6036491
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 27 September 2024
Resolved
THE CONDITION OF THE SHIP AND ITS EQUIPMENT SHALL BE MAINTAINED TO CONFORM WITH THE PROVISIONS OF THE PRESENT CONVENTION TO ENSURE THAT THE SHIP IN ALL RESPECTS WILL REMAIN FIT TO PROCEED TO SEA WITHOUT PRESENTING AN UNREASONABLE THREAT TO THE MARINE ENVIRONMENT. PSCO OBSERVED CARGO TANK STEAM HEATING SYSTEM INOPERABLE DUE TO WASTEAGE. STEAM HEATING SYSTEM SERVICES ALL CARGO TANKS AS WELL AS TANK CLEANING SYSTEM.
MARPOL I/4.1
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 October 2024
Resolved 4 October 2024
Resolution: Received Class Memo and Company Comments (see documents attached this activity). Cleared deficiency, Class will be taking all further actions.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 October 2023
Resolved
A chemical tanker shall comply with the requirements of the international bulk chemical code. Electrical installations shall be such to minimize the risk of fire and explosion from flammable products. PSCO observed a hole in the electrical conduit pipe in a hazardous location.
SOLAS20/VII/10.1
IBC 10.1.2.1
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 12 November 2023
Resolved 12 October 2023
Resolution: Crewmembers patched and sealed hole.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 12 October 2023
Resolved
In tankers, electrical equipment, cables and wiring shall not be installed in hazardous locations unless it conforms to the standards not inferior to those acceptable to the organization. PSCO observed starboard side life buoy light in hazardous location not certified safe type.
Condition: Invalid
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 12 November 2023
Resolved 27 October 2023
Resolution: Reviewed class report attesting to installation of certified safe light in cargo area.
10 - Safety of Navigation › N/A - No Subsystem › Electronic charts (ECDIS)
Issued 28 September 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 7 October 2022
Resolved 28 January 2023
Resolution: SEC NOLA PSC/Arrivals Branch received a class report / proper documentation satisfying the requirement
05 - Radio Communications › N/A - No Subsystem › INMARSAT ship earth station
Issued 28 September 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 28 September 2022
Resolved 17 October 2022
Resolution: Received Flag state LRIT conformance test attesting to the rectification of the deficiency.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 16 December 2019
Resolved
The first periodical control of foam concentrates should be performed not more than 3 years after being supplied to the ship, and after that every year. PSCO observed the vessel's low expansion deck foam analysis was overdue by 27 days.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 January 2020
Resolved 14 January 2020
Resolution: PSC NOLA received proper documentation satisfying the requirement.
11 - Life Saving Appliances › N/A - No Subsystem › Lifeboat inventory
Issued 8 January 2019
Resolved
All lifesaving appliances and arrangements shall comply with the applicable requirements of the Code. A food ration as described in paragraph 4.1.5.1.18 totaling not less than 10,000 KJ for each person the lifeboat is permitted to accommodate. Vessel is sailing with expired lifeboat rations. 74SOLAS(14)III/34, LSA Code 4.4.8.12. 17A/C
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 11 January 2019
Resolution: Class report received. Vessel provided new food rations for lifeboats.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Freeboard marks
Issued 8 January 2019
Resolved
The ring lines and letter shall be painted in white or yellow on a dark background or in balck on a light ground. Vessel's load line on port and starboard side is not constrasting with the hull.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 January 2019
Resolved 3 February 2019
Resolution: SECTOR NEW ORLEANS PSC RECEIVED DOCUMENTATION FROM RINA SATISFYING THE REQUIREMENT.