Inspection history · 34
20 January 2026
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8297400
10 March 2025
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8092755
20 February 2025
Deficiency Check · Periodic Inspection
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 8075266
4 December 2024
Deficiency Check · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8022949
1 July 2024
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7946539
2 June 2024
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7941114
12 May 2024
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7911655
22 February 2024
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7868874
22 January 2024
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7848678
11 September 2023
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7795575
29 June 2023
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7726320
16 December 2022
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7610872
12 December 2022
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7608351
14 January 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7396049
19 November 2021
Cargo Tank Internal · Internal Structural Exam · Drydock Exam · Administrative Inspection · In-Service Inspection · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7364524
12 June 2020
Load Line/Change of Employment · Internal Structural Exam · In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6951261
3 April 2020
Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6936152
2 March 2020
In-Service Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6919273
11 February 2020
In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6908131
28 June 2019
Administrative Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6728474
13 June 2019
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6713228
21 May 2019
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6690166
29 April 2019
MTSA Verification · Periodic Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6669191
22 April 2019
In-Service Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6667714
11 March 2019
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6640089
22 February 2019
Administrative Inspection · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6631654
23 April 2018
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6397417
16 April 2018
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6392779
14 February 2018
Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6355326
7 December 2017
Administrative Inspection · Examination of Repairs
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6320634
6 December 2017
Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6319808
3 December 2017
MTSA Verification · Administrative Inspection · In-Service Inspection · Ballast Water Examination
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6317205
14 June 2017
Deficiency Check
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6175965
11 May 2017
Deficiency Check · MTSA Verification · Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 6154414
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 January 2026
Resolved
The master of a tank vessel having a COW system under 46 CFR 157.10(e), 157.10a(a)(2), or 157.10c(b)(2) shall ensure the following: Before each cargo tank is crude oil washed, the oxygen content in that tank is 8 percent or less by volume at the locations under paragraph (a)(1) of this section. Vessel's inert gas system could not be verified to operate properly. Repair inert gas system to the satisfaction of a Coast Guard marine inspector prior to operation of the COW system but no later than 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 January 2026
Resolved 20 January 2026
Resolution: Received objective evidence of the IG system operating properly
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 20 February 2025
Resolved
The master of a tank vessel having a COW system under 46 CFR 157.10(e), 157.10a(a)(2), or 157.10c(b)(2) shall ensure the following: Before each cargo tank is crude oil washed, the oxygen content in that tank is 8 percent or less by volume at the locations under paragraph (a)(1) of this section. Vessel's inert gas system could not be verified to operate properly. Repair inert gas system to the satisfaction of a Coast Guard marine inspector prior to operation of the COW system but no later than 14 days.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 March 2025
Resolved 10 March 2025
Resolution: Tech report received.
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 20 February 2025
Resolved
Manned tank barges and tank ships authorized to carry Grade A, B, C, or D liquids at any temperature, or Grade E liquids at elevated temperatures, shall be provided with a combustible gas indicator suitable for determining the presence of explosive concentrations of the cargo carried. Vessels installed fixed gas detection system was found not operating properly. Repair gas detection system to the satisfaction of the a Coast Guard marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2025
Resolved 19 March 2025
Resolution: Received Tech report.
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 20 February 2025
Resolved
All tank vessels shall have efficient guard rails or bulwarks on decks and bridges. All rails shall consist of solid or tubular sections or chains or wire ropes. Numerous turnbuckles holding the safety chains in place were found wasted. Properly secure all openings in the deck rail on the periphery of the vessel, to the satisfaction of a Coast Guard marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2025
Resolved 21 February 2025
Resolution: Turnbuckles replaced.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 20 February 2025
Resolved
On all tank ships where the plans and arrangements will possibly permit, all passageways leading to living quarters, or places where anyone may be regularly employed, shall be provided with not less than two avenues of escape so located that if one of such avenues is not available another may be. The emergency escape hatch, located on top of the thermal fluid heater compartment, was unable to be opened safely from the interior due to a broken assist spring. In addition, the access ladder on the outside of the compartment, which acts as part of the escape route, had two wasted rungs on the bottom, creating an unsafe condition for crew. Repair escape hatch and ladder rungs, to the satisfaction of Coast Guard marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2025
Resolved 19 March 2025
Resolution: Temporary repair accepted. Work order received for permanent repair.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 20 February 2025
Resolved
Electrical installations on vessels must ensure maintenance of system integrity to which plan review has been approved. Inert gas generator high temperature alarm cable overhead penetration has temporary repair. Properly repair penetration.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 March 2025
Resolved 10 March 2025
Resolution: Tech report received.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 December 2024
Resolved
Electric installations on vessels must ensure maintenance of services necessary for safety under normal and emergency conditions. Protection of passengers, crew, other persons, and the vessel from electrical hazards. MI observed that the electrical shore tie supplying power to the barge from the tug was no longer serviceable. Vessel shall enact permanent repairs to the satisfaction of attending USCG Marine Inspector.
46 CFR 111.01-1
Action required: 17 - Rectify deficiencies prior to departure
Due 6 December 2024
Resolved 11 December 2024
Resolution: Verified install of new electrical shore tie supplying power to the barge from the tug.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 February 2024
Resolved
Each cargo vessel must carry the number of lifebuoys prescribed in table 199.271 of this section. The vessel only had 5 lifebuoys on board. Procure the required 12 lifebuoys and install on board to the satisfaction of the coast guard.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 February 2024
Resolved 22 February 2024
Resolution: Vessel procured & installed additional life buoys along with attachments (qty 12). Reviewed updated Fire Control Plan, verified location of life buoys and ABS approval of plan.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 December 2022
Resolved
In order to maintain system integrity, each individual electrical installation in a hazardous location must comply specifically with Articles 500-505 of NFPA NEC 2002 (incorporated by reference; see 46 CFR 110.10-1), as modified by 46 CFR 111.105-3, or with the IEC 60079 series (as defined in 46 CFR 111.105-1 and incorporated by reference; see 46 CFR 110.10-1), but not in combination in a manner that will compromise system integrity or safety. Hazardous location equipment must be approved as suitable for use in the specific hazardous atmosphere in which it is installed. The use of nonapproved equipment is prohibited.Covers for angle drives are degraded and in need of replacement (#1-4) Vessel is authorized a one way transit to Beaumont with the following restricitons; Must maintain inerted tanks at 3.5% O2, Lock out tag out all cargo pump engines, temp repair covers. No Cargo ops authorized until repairs made in Beaumont to satisfaction of attending Coast Guard inspector/local OCMI.
46 CFR 111.105-5
Condition: Improper/Lack of Maintenance
Action required: 15 - Rectify deficiencies by next port
Resolved 16 December 2022
Resolution: New cover were installed on engine angle drives.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 12 February 2021
Resolved
Except as provided in paragraphs (b) through (g) of this section, each tank vessel must undergo drydock, internal structural, and cargo tank internal examinations as follows: (1) except under paragraph (a)(2) of this section, vessels that operate in salt water must be inspected in accordance with the intervals set forth table 31.10-21(a).
This tank barge is subject to a 5.0yr interval for Dry dock, which expires February 12, 2021. Conduct a Dry dock Examination to satisfaction of a CG Marine Inspector prior to conducting any cargo operations.
Any requests to conduct a voyage associated with pursuing a Dry dock contract shall be communicated with the local OCMI.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
Resolution: Credit DD/ISE/CTIE
12 - Dangerous Goods › N/A - No Subsystem › Temperature control
Issued 12 June 2020
Resolved
Fired thermal fluid heaters must have a low fluid level cutout device or a low flow device. Due to lack of thermal fluid, proper test was not able to be conducted. Prior to use of thermal fluid heater, USCG must witness satisfactory operational test and shutdown.
Action required: 705 - Other - as specified
Resolved 9 February 2021
Resolution: Re-issued deficiency.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 12 June 2020
Resolved
Manned seagoing barges must be fitted with anchors, chains and hawsers in general agreement with the standards established by the American Bureau of Shipping. Vessel port anchor is missing and windlass is inoperable. Until port anchor satisfactorily replaced, vessel restricted from anchoring, and transits must be performed in accordance with NOLA MSIB "Carrollton Gauge at 15 Feet and Falling" dated 07 Feb 2020.
Action required: 705 - Other - as specified
Resolved 9 February 2021
Resolution: Witnessed satisfactory testing of PORT & STBD Anchor Windless systems following repairs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 12 June 2020
Resolved
Manned tank barges authorized to carry Grade A, B, C, or D liquids at any temperature, or Grade E liquids at elevated temperatures, shall be provided with a combustible gas indicator suitable for determining the presence of explosive concentrations of the cargo carried. The No. 4 Port ballast tank sensor was inoperable. Rectify deficiency prior to loading cargo.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 February 2021
Resolution: Re-issued deficiency.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 12 June 2020
Resolved
No person may operate any vessel equipped with installed toilet facilities unless it is equipped with: an operable Type I, II, or III MSD certified and labeled under 159.12, 159. 12(a), or 159.16. Vessel had an insufficient temporary repair of a silicon patch on the MSD holding tank. Within 30 days, perform permanent repairs.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 July 2020
Resolved 9 February 2021
Resolution: System replaced, new deficiency issued to provide documentation of proper use IAW manufacturer specs.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 12 June 2020
Resolved
Vessel transfer pipe systems must be satisfactorily tested annually: transfer hoses must be satisfactorily liquid pressure tested at 1.5x MAWP, pressure gauges must show pressure within 10% of the actual pressure, and relief valves must open at or below the test pressure at which it is set to open. Prior to loading or discharging cargo, complete annual cargo pipeline testing to satisfaction of USCG.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 February 2021
Resolution: Verified transfer system tested.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 12 June 2020
Resolved
Any tank vessel equipped with internal combustion engine cargo pumps on weather deck shall be provided with a minimum of one remote manual shutdown. Proper test of the #3 cargo pump remote shutdown was not able to be conducted due to inoperable pump. Prior to use of #3 cargo pump, USCG must witness satisfactory pump operation and remote shutdown. 46 CFR 32.50-35
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 February 2021
Resolution: Witnessed satisfactory testing of generator.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 12 June 2020
Resolved
Each generator must meet the applicable requirements for construction and testing in section 4-8-3 of the ABS Steel Vessel Rules. The #3 SSDG was found to have a coolant water leak impacting its "continuous rating" as defined by ABS, and the #1 SSDG was inoperable. Within 30 days, correct to satisfaction of USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 July 2020
Resolved 9 February 2021
Resolution: Witnessed satisfactory testing of generator.
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 12 June 2020
Resolved
Places where anyone may be regularly employed shall be provided with not less than two avenues of escape so located that if one such avenue is not available another may be. Emergency escape hatches on deck houses unable to be opened from spaces they protect. Correct to satisfaction of USCG within 30 days. 46 CFR 32.40-60(b) and 46 CFR 32.02-1
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 July 2020
Resolved 9 February 2021
Resolution: Verified hatches are operational.
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 12 June 2020
Resolved
Ballast piping systems must be so arranged as to prevent oil or water from one compartment to another. The #5 Stbd ballast tank has a piping leak, inhibiting ballast and stability of vessel. Within 30 days, correct to satisfaction of marine inspector. 46 CFR 56.50-50(h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 July 2020
Resolved 9 February 2021
Resolution: re-issued deficiency.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 June 2020
Resolved
VCS liquid filled pressure-vacuum breaker installations must meet Commandant approval. Vessel P/V breaker was found to have low liquid level, nearly out of sight glass. Corrected on-site. 46 CFR 39.2011(c)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 June 2020
Resolution: Crew refilled P/V Breaker during course of exam
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 June 2020
Resolved
Install and operate a ballast water management system (BWMS) that has been approved by the Coast Guard under 46 CFR part 162. The BWMS must be installed in accordance with §151.2035(b) of this subpart. Following installation, the master, owner, operator, agent, or person in charge of the vessel subject to this subpart must properly maintain the BWMS in accordance with all manufacturer specifications. Unless otherwise expressly provided for in this subpart, the master, owner, operator, agent, or person in charge of vessels employing a Coast Guard-approved BWMS must meet the applicable ballast water discharge standard (BWDS), found in §151.2030 of this subpart, at all times of discharge into the waters of the United States.
Current Ballast Water Management system has damage and internal leaking within the piping systems dedicated to the #5 Ballast Tanks. A previous NS5 work order detailed that the vessel was listing while carrying cargo, presenting a stability concern. Complete proper repairs and testing to satisfaction of CG Marine Inspector prior to conducting cargo operations.
33 CFR 151.2025(a)(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
09 - Working and Living Conditions › 092 - Working Conditions › Gas instruments
Issued 12 June 2020
Resolved
Gas detection systems must have a readout with meters that show flammable gas concentration over the concentration or volume ranges under paragraph (t) or (u) of this section.
Gas detection system has fault, #4 sensor inoperable. Replace associated sensors/equipment and test to satisfaction of CG Marine Inspector prior to conducting cargo operations regulated under 46 CFR, Subchapter O.
46 CFR 154.1350(d)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 12 June 2020
Resolved
Unless the cargo tanks are gas free, the master of each tankship to which this subpart applies shall ensure that the inert gas system is operated as necessary to maintain an inert atmosphere in the cargo tanks.
Inert Gas System "double block and bleed" approved by MSC project C1-1600476 is inoperable, and fuel/air lines are beyond service. Conduct proper repairs and testing to satisfaction of CG Marine Inspector prior to conducting cargo operations that require the use of the IGS.
46 CFR 32.53-5
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 12 June 2020
Resolved
Operational tests and checks of all safety and limit controls, combustion controls, programming controls, and safety relief valves must be conducted by the owner, chief engineer, or person in charge at the inspection for certification, periodic inspection, and when directed by the Officer in Charge, Marine Inspection, to determine that the control components and safety devices are functioning properly and are in satisfactory operating condition. These tests and checks must be conducted in the presence of a marine inspector and must include the following: proper prepurge, burner ignition sequence checks, operation of the combustion controls, limit controls, fluid flow controls, fluid level controls, high temperature control, proper postpurge control, and verification of the flame safeguard.
Thermal fluid heater coils are damaged and some have been removed, rendering the entire system inoperable. Conduct proper repairs and testing to satisfaction of CG Marine Inspector prior to conducting cargo operations of elevated temperature cargoes.
46 CFR 61.30-20
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
Resolution: Thermal Fluid Heater has been removed from service
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 12 June 2020
Resolved
The high-level alarm required by paragraph (a) of this section must— (3) Activate a visible and audible alarm so that it can be seen and heard on the vessel where cargo transfer is controlled and in the cargo deck area.
Audible alarm for High Level / Overfill system did not meet requirements. Repair or replace and test to satisfaction of CG Marine Inspector prior to conducting cargo operations.
46 CFR 39.2007(d)
46 CFR 39.2009
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 June 2020
Resolved
At each inspection for certification and periodic inspection the marine inspector shall conduct such tests and inspections of the main propulsion and auxiliary machinery and of its associated equipment, including the fluid control systems, as he feels necessary to check safe operation.
Safety shutdowns for installed generators have not been tested. Test and provide documentation to satisfaction of CG Marine Inspector within 30 days.
46 CFR 61.20-3(a)
Action required: 705 - Other - as specified
Resolved 21 December 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Load Lines (including Exemption)
Issued 12 June 2020
Resolved
All U.S. flag vessels which engage in foreign voyages or international voyages by sea (other than solely in Great Lakes voyages) are subject to this part.
Current Load Line certificate has expired. Renew certificate prior to conducting any voyage outside of the U.S. Boundary line.
46 CFR 42.03-5(a)
Action required: 705 - Other - as specified
Resolved 21 December 2021
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 12 June 2020
Resolved
The instructions supplied by the manufacturer must contain directions for each of the following: Safe operation and servicing of the device so that any discharge meets the applicable requirements of §159.53.
Vessel could not provide any certificates, documentation or logs pertaining to the use and maintenance of installed MSD. Provide to satisfaction of CG Marine Inspector prior to discharging any effluent.
Action required: 705 - Other - as specified
Resolved 8 April 2021
Resolution: Recieved copy of operating manual and CG certificate confirming Type II system.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 12 June 2020
Resolved
Operational readiness. Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use.
Liferaft hydrostatic releases are expired or have a missing expiration date. Replace to satisfaction of CG Marine Inspector within 30 days.
Action required: 705 - Other - as specified
Resolved 9 April 2021
Resolution: Received proof of new installations
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 12 June 2020
Resolved
A tank vessel owner or operator must submit plans, calculations, and specifications for a new tank vessel VCS to the MSC for review and approval before installing the system. A permanent or portable vapor processing unit onboard a tank vessel will be reviewed, together with the tank vessel, as a complete and integrated system.
Current VCS approval has been completed by the classification society ABS, who is no longer associated with Owner/Operator. Provide documentation of MSC approval or new classification society approval to satisfaction of CG Marine Inspector prior to conducting cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 12 June 2020
Resolved
Before issuing an original certificate of inspection, the following number of copies of the stability booklet required by §170.110 must be submitted for approval; three copies for plan review being conducted by the Coast Guard Marine Safety Center.
Current stability booklet has been completed by the classification society ABS, who is no longer associated with Owner/Operator. Provide documentation of MSC approval or new class approval to satisfaction of CG Marine Inspector prior to conducting cargo operations.
46 CFR 170.080
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 December 2021
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 3 April 2020
Resolved
Vsl must complete an in-service and/or annual inspection prior to departure to ensure compliance with applicable provisions of 46 CFR subchapter D.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 December 2021
11 - Life Saving Appliances › N/A - No Subsystem › Line-throwing appliance
Issued 22 April 2019
Resolved
Line-throwing appliances. Each vessel must have a line throwing appliance approved under series 160.040. The vessels line-throwing appliance's are expired as of March 2019. Prior to departure local MI will validate that all line-throwing appliances are valid and not expired.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 April 2019
Resolution: Valid Line-throwing device onboard
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 22 April 2019
Resolved
Each vessel must carry distress flares. Vessels distress flares are expired. Prior to departure local MI will validate that all distress flares are valid and not expired.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 April 2019
Resolution: Valid Distress Signals onboard
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 22 April 2019
Resolved
Valves, Fittings, and Accessory Equipment. Provisions shall be made by the use of offsets, loops, bands, expansion joints, etc., to protect the piping and tank from excessive stress due to thermal movement and/or movements of the tank and hull structure. Expansion joints shall be held to a minimum and where used shall be of the bellows type and subject to special approval by the Commandant.
#4 cargo pipe line port aft has 2 expansion joints just forward of pump discharge that have over expanded and bulge out making the designed purpose of the expansion joint invalid.
Vessel crew has already notified company and placed the section of piping in the tag out system and also tagged out the pump. Vessel has placed on order both expansion Joints. However, since each joint is a special order/fabrication it is still 2 weeks from the date of delivery. Issued a 30 day period to vessel to fully install and test new expansion joints and to be reinspected by USCG MI before placing the section of pipe back into service.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2019
Resolved 28 June 2019
Resolution: Vessel recieved new expansion joints. Crew installed expansion joints. Conducted all required test. Passed with no leaks Deficiency Cleared
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Company responsibility and authority
Issued 22 April 2019
Resolved
Objective evidence discovered in an expanded SMS exam revealed a failure to implement requirements of the SMS as evidence by deficiencies #1-3. An internal SMS audit and corrective action report is required to be completed to the satisfaction of the cognizant OCMI within 3 months of this date, 22 April 2019.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 23 July 2019
Resolved 28 June 2019
Resolution: Recieved internal audit form from company rep. loaded into MISLE.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 6 December 2017
Resolved
Pressure/Vacuum breaker liquid level low. Vessel was emitting vapors during transfer which required VCS. Must correct liquid filled pressure vacuum breaker to operate according to manufactures specifications prior to resuming cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 December 2017
Resolution: P/V Breaker was refilled to the proper liquid level.
Fire Fighting › Fixed Deck Foam System › Main Control Station
Issued 6 December 2017
Resolved
#1 emergency pull cable for fixed foam fire fighting installation is missing. Repair to satisfaction of attending marine inspector prior to conducting discharge operations.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 December 2017
Resolved 7 December 2017
Resolution: Received pictures of repaired pull station and tech report (attached).
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 3 December 2017
Resolved
Fixed CO2 extinguishing cylinder for the gear oil locker found broken from its mount and laying adrift on the deck. Once temporarily secured, repair permanent installation to the satisfaction of the Marine Inspector.
46 CFR 31.10-18
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 December 2017
Resolved 8 December 2017
Resolution: Repaired the discharge pull handle for the fixed CO2 extinguishing cylinder for the gear oil locker.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 3 December 2017
Resolved
Portable dry-chemical fire extinguishers FE No. 10 and FE No. 2 were found undercharged. Safety and firefighting equipment checklist reflects that portable/semi-portable etinguishers were last inspected as satisfactory on 12/1/17. Properly charged spares replaced. Company to provide documentation of [name withheld] attesting to the implementation of Section 9.2 of the company Safety Management Manual.
46 CFR 31.10-18
33 CFR 96.210(c)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 17 April 2018
Resolution: Company updated "Bouchard Form #61, Safety and Fire Fighting Equipment Checklist" with line items to address mounting bracket, keeper pin and seals, and pressure indication needles. In addition, Bouchard now requires two signature integrity for form.
Operations/Management › Ballast Water Managment › Ballast Water Discharge
Issued 3 December 2017
Resolved
Vessel's Ballast Water Alternate Management System reported as inoperative since May 2017. As a "new vessel", provide notification to nearest COTP and proceeed as directed prior to discharging untreated ballast water in the waters of the US. Alternately, provide valid USCG extension letter. Prior to discharge of untreated BW.
33 CFR 151.205(g)
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 15 February 2018
Operations/Management › Ballast Water Managment › Mandatory Practices
Issued 3 December 2017
Resolved
Vessel's Ballst Water Treatment Plan does not include the provisions outlined in 33 CFR 151.2050(g), including procedures for cooridnating the shipboard BWM strategy with the Coast Guard as well as detailed reporting requirements and procedures for ports in the US. Update plan as required to the satisfaction of the Coast Guard.
33 CFR 151.2050(g)
Condition: Invalid
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 6 March 2019
Resolution: Plan has the the necessary wording and the master knew to go to the response plan for the info.
Engineering › Generator (propulsion/auxiliary-electric) › Indicator Circuitry
Issued 3 December 2017
Resolved
Start air guages for ballast water pump gens. #1 and #3 inoperative. Make repairs and prove proper opeation to the satisfaction of the attending Marine Inspector.
46 CFR 61.01-1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 15 February 2018
Resolution: Air gauges replaced and tested; operable.
Fire Fighting › Structural - A Class Divisions › Door Frames
Issued 3 December 2017
Resolved
The fire doors and frames forming part of the continuous class A structural fire boundary in the cargo pump room (port and starboard)are gapped. Additionally, marine cable transit for the adjacent accomodation space not properly installed. Make repairs and prove proper operation to the satisfaction of the attending Marine Inspector.
46 CFR 32.57-10
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 6 March 2019
Resolution: Not a class A rated fire door or listed on the fire plan as a fire door or class A boundary.
Operations/Management › Ballast Water Managment › Ballast Water Discharge
Issued 3 December 2017
Resolved
Ballast water pumps #1 and #3 noted with significant leakages past the packing glands. Make repairs and prove proper operation to the satisfaction of the attending Marine Inspector.
46 CFR 61.01-1
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 15 February 2018
Resolution: Glands repacked.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 3 December 2017
Resolved
Section 4.5 part B of the Bouchard Safety Management Manual (SMM)(2017 ed.) prescribes the safe working practices for entry into restricted access spaces. The forepeak has been identified as a restricted access spaace and is regularly accessed by the crew. There is no objective evidence to indicate that these safe work practices have been implemented prior to entry. Prior to entry, company to provide documentation of corrective action attesting to the implementation of Section 4.5 of the company SMM.
46 CFR 35.20-20
33 CFR 96.210(c)
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 16 February 2018
Resolved 25 April 2018
Resolution: Vessel provided subjective evidence that they were ventilating the space for two hours and logging each entry into the restricted area.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Communications
Issued 11 May 2017
Resolved
High level/Over-fill Alarms are not functioning properly. After offload of current cargo, vessel is not authorized to conduct cargo operations until repairs are made to the alarms.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2017
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 11 May 2017
Resolved
Three metallic expansion joints (2 on cargo pipe and 1 on the vapor line were found to cracked on the outer bellows.
Condition: Improper/Lack of Maintenance
Due 12 June 2017
Resolved 14 June 2017
Resolution: Received invoice and pictures of newly installed expansion joints.
Operations/Management › Vessel Safety Management › Documentation Maintenance/Control
Issued 11 May 2017
Resolved
Ensure approved testing procedures for vital equipment is on onboard for conducting periodic safety tests.
Condition: Improper/Lack of Maintenance
Due 12 June 2017
Resolved 15 May 2017
Fire Fighting › Fixed Deck Foam System › Main Control Station
Issued 11 May 2017
Resolved
Repair pull station cable conduit for foam extinguishing system.
Condition: Damaged By Earlier Event
Due 12 June 2017
Resolved 15 May 2017
Lifesaving › Inflatable Liferafts › Inflation Characteristics
Issued 11 May 2017
Resolved
Replace life raft launching procedures placard at port aft raft launching station.
Condition: Improper/Lack of Maintenance
Due 12 June 2017
Resolved 12 May 2017