Documentation record
Registered dimensions (L × B × D)361.9 ft × 74.0 ft × 31.0 ft
Registered tonnagegross 6,516 / net 3,945
ITC dimensions (L × B × D)361.9 ft × 74.0 ft × 31.0 ft
ITC tonnagegross 6,516 / net 3,945
BuilderCORN ISLAND SHIPYARD INC · GRANDVIEW, IN, UNITED STATES · built 2014
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portST LOUIS, MO
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 11 December 2025 · expires 30 November 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it3945 - Convention (Subpart B), Net Ton
6516 - Convention (Subpart B), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 29
12 June 2025
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8157963
5 August 2024
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7961171
26 March 2024
Drydock Exam · Deficiency Check · Cargo Tank Internal · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7886013
4 December 2023
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7822170
2 October 2022
Damage Survey · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7569975
2 October 2022
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7572710
23 August 2022
Periodic Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7540908
24 January 2022
Damage Survey · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7384915
1 December 2021
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7361031
12 August 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7285334
31 March 2021
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7166690
23 November 2020
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7100317
3 November 2019
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6849365
2 October 2019
Bulk Liquid Transfer Monitor
Physical examination · Marine Safety Unit Belfast · USCG Northeast District (CGD-NE) · Activity 6826531
9 September 2019
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6807203
9 August 2019
Drydock Exam · COI Inspection · Internal Structural Exam · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6777104
19 April 2019
Bulk Liquid Transfer Monitor
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6666090
4 January 2019
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6605509
27 August 2018
Bulk Liquid Transfer Monitor
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6526933
28 November 2017
MARPOL Annex II Examination · MARPOL Annex I Examination · MARPOL Annex IV Survey · Internal Structural Exam · MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6314313
11 October 2017
In-Service Inspection · Administrative Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 6282222
9 March 2017
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6103814
21 November 2016
MARPOL Annex II Examination · Periodic Inspection · MTSA/ISPS Verification · MARPOL Annex I Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6044979
18 July 2016
Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5948079
9 March 2016
Administrative Inspection · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 5830176
23 November 2015
Deficiency Check · MTSA Verification · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5769600
21 January 2015
Welding Related Inspections Qualification Testing · Damage Survey · Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5056464
19 January 2015
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 5060783
27 June 2014
MTSA Verification · Initial Certification · Administrative Inspection · Construction Oversight
Physical examination · Sector Ohio Valley · USCG Heartland District (CGD-H) · Activity 4995792
01 - Certificates & Documentation › 011 - Ships Certificates › Pollution Prevention by Noxious Liquid Sub in Bulk
Issued 12 June 2025
Resolved
Every ship of 150 gross tonnage and above certified to carry noxious liquid substances in bulk shall carry on board a shipboard marine pollution emergency plan for noxious liquid substances approved by the Administration.
Vessel is authorized to carry NLS and has an approved Shipboard Oil Pollution Emergency Plan (SOPEP) but does not have a valid Shipboard Marine Pollution Emergency Plan (SMPEP).
MARPOL II/17.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 July 2025
Resolved 15 July 2025
Resolution: Received SMPEP approval letter (uploaded)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 5 August 2024
Resolved
Where cargo pump shafts pierce gastight bulkheads, stuffing boxes with readily accessible gastight glands shall be provided.
STBD outboard cargo pump vapor tight seal is compromised. Witnessed standing water where cargo pump shaft exits cargo pump room bulkhead.
STBD outboard cargo pump may not be used for cargo operations until rectified.
STBD Inboard cargo pump may still be used for cargo operations.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 August 2024
Resolution: Gas tight seal replaced. Test SAT.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 5 August 2024
Resolved
The owner, master, or person-in-charge of a tank vessel must ensure that portable and semi-portable extinguishers are inspected and maintained in accordance with NFPA 10.
It ws found that the CO2 extinguisher in cargo pump room was not mounted.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 6 August 2024
Resolution: Extinguisher was mounted in bracket in machinery space.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 4 December 2023
Resolved
On all tank vessels, the construction or conversion of which is started on or after November 10, 1936, the cargo pumps shall be designed and installed to minimize the danger of sparking. Special care shall be exercised in the design of packing spaces in order to secure ample depth and accessibility of glands. Where cargo pump shafts pierce gastight bulkheads, stuffing boxes with readily accessible gastight glands shall be provided.
Inspector observed tear on gastight vapor trunk on the exterior shafting of the inboard cargo pump.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 4 December 2023
Resolution: POC sent images of proper repair
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 1 December 2021
Resolved
The high level over fill protection system must alarm in the event of loss of power to the alarm system or failure of electrical circuitry to the tank level sensor. Loss of power alarm did not activate. Rectify prior to loading cargo.
46CFR39.20-7(a)(2), 705c
Action required: 705 - Other - as specified
Resolved 3 December 2021
Resolution: Reesolved via ABS class report that alarm was now fully functioning
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 December 2021
Resolved
Non-conducting deck coverings, such as non-conducting mats or gratings, suitable for the specific switchboard voltage must be installed for personnel protection at the front and rear of the switchboard. Vessel did not have non conductive matting located in front of electrical panels.
46CFR111.30-11, 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2021
Resolved 3 December 2021
Resolution: Resolved via ABS class report that matting was added appropriately
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 1 December 2021
Resolved
A self-propelled vessel with a capacity of 250 or more barrels of oil or hazardous material that is conducting transfer operations between sunset and sunrise must have deck lighting that adequately illuminates each transfer operations work area and each transfer connection point in use on the vessel.
Many deck lights were burned out throughout the length of the vessel.
33 CFR 155.790(a)(1), 16c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 December 2021
Resolved 3 December 2021
Resolution: Resolved via proof that appropriate lights had been received
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 23 November 2020
Resolved
Each vessel must carry a category 1 406MHz satellite EPIRB meeting the requirements of 47 CFR part 80. When the vessel is underway, the EPIRB must be stowed in its float-free bracket with the controls set for automatic activation and be mounted in a manner so that it will float free if the vessel sinks.
As an Oceans route vessel, applicability with Sub chapter W is required. Vessel is not equipped with an EPIRB.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 December 2020
Resolved 5 January 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 November 2020
Resolved
Each vessel must carry the number of life buoys prescribed in table 199.271. 46 CFR 199.271 (table) indicates 10 life buoys are required for vessels between 328-492 feet in length.
Vessel is currently equipped with 3 life buoys.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 December 2020
Resolved 15 January 2021
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 23 November 2020
Resolved
Each completed operation shall be signed by the person or persons in charge of the operations concerned and each completed actions concerned and each completed page shall be signed by the master or other person having charge of the ship.
Vessels Oil Record Book Pt. 2 was missing validation signatures on nearly most pages.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 December 2020
Resolved 10 December 2020
01 - Certificates & Documentation › 013 - Documents › Oil record book
Issued 23 November 2020
Resolved
Each Oil Tanker of 150 gross tons and above, ships of 400 gross tons and above other than Oil Tankers...shall maintain an Oil Record Book Part 1 (machinery space operations).
Vessel was not able to produce an Oil Record Book Part 1.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 December 2020
Resolved 15 December 2020
Construction/Loadline › Hull › Weld
Issued 28 November 2017
Resolved
V/W the washed out welds on the bow, as marked and reviewed by attending [name withheld] worklist in Acitivty documents.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 7 December 2017
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 28 November 2017
Resolved
Vessel did not have valid drug and alcohol certificate onboard to have proof of enrollment in a program.
Condition: Invalid
Action required: 705 - Other - as specified
Due 8 January 2018
Resolved 22 December 2017
Resolution: Recieved confrimation from vessel representative on valid drug and alcohol enrollment.
Construction/Loadline › Markings › Load Line Mark
Issued 28 November 2017
Resolved
Vessel's loadline mark was not permanently marked. To be corrected prior to next credit dry dock.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 17 October 2019
Resolved 30 August 2019
Resolution: MI attended and observed load line permanently marked on vessel's side shell.
Documentation › Logs/Records › Cargo Record Book (NLS)
Issued 9 March 2016
Resolved
No cargo record book onboard vessel. Provide CRB and training in its use to tankerman.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 March 2016
Resolved 30 March 2016
Resolution: Documentation rcvd to clear def as required.
Construction/Loadline › Penetrations › Gasket
Issued 23 November 2015
Resolved
Gasket on generator ventilation closure missing
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 December 2015
Resolved 23 November 2015
Resolution: Received photo confirmation from vessel rep. of the installed gasket.
Construction/Loadline › Penetrations › Gasket
Issued 23 November 2015
Resolved
Gasket on watertight door for prime mover house worn and needing replacement.
Condition: Improper/Lack of Maintenance
Due 1 December 2015
Resolved 23 November 2015
Resolution: Received photo confirmation from vessel rep. of the installed gasket.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 23 November 2015
Resolved
Dripshield on distribution panel in office quarters missing.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 December 2015
Resolved 23 November 2015
Resolution: Received photo confirmation from vessel rep. of the installed dripshield.
Construction/Loadline › Hull › Double Hull
Issued 21 January 2015
Resolved
Inside the aft rake multiple broken welds were found along longitudinals. The following broken welds were found:
Frame 53, Rib 6
Frame 54, Rib 6
Frame 55, between Rib 5 &6
Frame 56, Rib 5
Frame 57, Rib 4
Frame 57, Rib 5
Additionally, the longitudinal is damaged & twisted near Frame 54.
Vessel shall be drydocked and further inspection/NDT made to determine extent of damage.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 22 February 2015
Resolved 2 April 2015
Resolution: Completed repairs to satisfaction of CG Marine Inspector.