Records from 2013 to 2025. Most recent: inspection, 2 September 2025.
Documentation record
Registered dimensions (L × B × D)60.0 ft × 25.0 ft × 8.5 ft
Registered tonnagegross 85 / net 68
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderMARINE BUILDERS INC · UTICA, IN, UNITED STATES · built 2013
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 19 September 2025 · expires 30 September 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it85 - Simplified, Gross Ton
68 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 12
2 September 2025
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 8229483
22 August 2024
Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7971651
6 November 2023
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7810404
16 June 2023
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7718781
6 September 2022
Annual Inspection
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7552872
16 July 2021
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 7257781
3 June 2019
Administrative Inspection · Initial Certification
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6705799
29 October 2018
DAPI Audit
Administrative · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 6577716
30 June 2016
Industry Initiated Exam
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5933208
8 April 2016
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 5851439
6 February 2014
Deficiency Check · Industry Initiated Exam
Physical examination · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4795726
20 November 2013
Type not recorded
No type recorded · Marine Safety Unit Paducah · USCG Heartland District (CGD-H) · Activity 4759052
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 July 2021
Resolved
Piping and machinery components that exceed 220 ·c 428 F)' including fittings, flanges, valves, exhaust manifolds, and turbochargers, must be insulated.
Exhaust piping from MDE area missing and damage insulation. Vessel is required to rectify systems satisfaction of the attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2021
Resolved 12 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 16 July 2021
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, remote fuel shut off valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover.
The valve must be operable from a safe place outside the space where the valve is installed.
Action required: 10 - Deficiency Rectified
Due 13 August 2021
Resolved 16 July 2021
Resolution: Fuel shut off valves were fixed and tested SAT prior to departure
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 16 July 2021
Resolved
All bilges and void spaces are kept free from accumulation of combustible and flammable materials and liquids insofar as practicable.
Bilges contained excessive Lube and Fuel oil. Vessel is required to rectify condition to the satisfaction of the attending MI
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2021
Resolved 12 August 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 July 2021
Resolved
Pipes and fitting in essential systems must meet ABS for Rules for Building and Classing vessel under 90 Meters(295 ft) in Length.
While testing steering system a Hydraulic leak was observed from the steering Ram. Vessel is required to rectify to the satisfaction of the attending [name withheld] was corrected prior to departure
Action required: 10 - Deficiency Rectified
Due 13 August 2021
Resolved 16 July 2021
Resolution: Hydraulic leak was fixed and system tested sat Prior to Departure
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 16 July 2021
Resolved
The master must ensure that all hatches, doors and other openings of the hull and deck are kept tightly closed. Deck soft patches for E/R where found not fully secured allowing for water intrusion and compromise of fixed fire fighting ability. Vessel is required to rectify to the satisfaction of the attending [name withheld] was corrected prior to departure.
Action required: 10 - Deficiency Rectified
Due 13 August 2021
Resolved 16 July 2021
Resolution: Hatches were properly secured to deck prior to departing
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 16 July 2021
Resolved
If a dedicated storage cabinet is provided it must be secured to the vessel so that it does not move.
Storage cabinet was found loose and not secured in any fashion. Vessel is required to rectify to the satisfaction of the attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2021
Resolved 12 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 July 2021
Resolved
Each lifebuoy with a floating electric water light must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the water light around the body of the lifebuoy.
Floating Electric light found not attached to lifebuoy. (No existing line present at all). Vessel is required to rectify lifesaving appliances to the satisfaction of the attending MI
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2021
Resolved 12 August 2021
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 July 2021
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The following alarms must be provided for: Low Hydraulic steering fluid levels.
Low hydraulic steering alarm was found inoperable. Vessel is required to rectify to the satisfaction of the attending MI. Corrected prior to departure.
Action required: 10 - Deficiency Rectified
Due 16 July 2021
Resolved 16 July 2021
Resolution: Alarm was tested SAT prior to departure.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 16 July 2021
Resolved
At least one lifebuoy must have a lifeline, secured around the body of the lifebuoy. If more than one lifebuoy is carried, at least one must not have a lifeline attached.
Upon inspection no line was found attached to lifebuoy. Vessel is required to rectify lifesaving appliances to
the satisfaction of the attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 August 2021
Resolved 12 August 2021
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 16 July 2021
Resolved
Safety brief was not conducted and could not be provided upon request. Vessel is required to rectify safety program to the satisfaction of the attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2021
Resolved 12 August 2021
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 16 July 2021
Resolved
The following list of items must be recorded in the TVR, official logbook, or IAW the TSMS apllicable to the vessel: Personnel records, IAW 140.400; Safety orientation, IAW 140.410; Record of drills and instruction, IAW 140.410; Examinations and tests, IAW 140.615; Operative navigational safety equipment, IAW 140.620; Navigation assessment, IAW 140.635; Navigation
safety training, IAW 140.645; Oil residue discharge and
disposals, IAW 140.655; Record of inspection of towing gear IAW 140.820; and Fire detection and fixed fire-extinguishing IAW 142.240.
Vessel could not provide nor did they have an active system in place to meet record keeping requirements. Vessel is required to rectify program to the satisfaction of the attending MI.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 July 2021
Resolved 12 August 2021