Records from 2013 to 2024. Most recent: inspection, 24 July 2024.
Documentation record
Registered dimensions (L × B × D)95.4 ft × 34.0 ft × 10.5 ft
Registered tonnagegross 441 / net 441
ITC dimensions (L × B × D)95.4 ft × 34.0 ft × 10.5 ft
ITC tonnagegross 506 / net 151
BuilderSTEINER SHIPYARD INC · BAYOU LA BATRE, AL, UNITED STATES · built 2013
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeBox
Hull configurationMonohull
Hailing portST LOUIS, MO
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 9 September 2025 · expires 31 October 2026
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it506 - Convention (Subpart B), Gross Ton
441 - Regulatory (Subpart C or D), Gross Ton
151 - Convention (Subpart B), Net Ton
441 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 17
24 July 2024
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7966026
6 September 2023
Administrative Inspection
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7785813
13 July 2023
COI Inspection · In-Service Inspection · Inclining Experiment · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7741744
30 August 2021
Administrative Inspection
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 7316461
28 May 2019
Initial Certification
Physical examination · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6696563
26 April 2019
TPO Audit
Administrative · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 6668410
5 May 2016
Industry Initiated Exam · MTSA Verification · DAPI Audit · Administration
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5869824
10 January 2016
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5794688
9 June 2015
Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5149766
28 April 2015
Marine Casualty Follow Up
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5113109
9 March 2015
Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5794718
25 November 2014
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 5029504
17 November 2014
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 5026008
13 July 2014
Type not recorded
No type recorded · Sector Lower Mississippi · USCG Heartland District (CGD-H) · Activity 4925317
26 May 2014
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4871273
6 January 2014
Type not recorded
No type recorded · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4778929
28 October 2013
MTSA Verification · DAPI Audit · Industry Initiated Exam
Physical examination · Marine Safety Unit Vicksburg · USCG Heartland District (CGD-H) · Activity 4748528
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 December 2023
Resolved
Verification of compliance with design standards, when required by § 144.135, must be performed by an individual or entity who meets the requirements of § 144.140.
The vessel underwent extensive modifications at Southwest Shipyard, Brady Island, Houston, TX. The vessel has completed an inclining examination as required by the OCMI, but the completed design verification, including stability analysis and the stability letter have not been submitted to the OCMI.
The Owner shall submit the stability calculations and proposed stability letter to the Marine Safety Center within 60 days. The vessel is authorized to operate during this time.
Action required: 705 - Other - as specified
Due 15 February 2024
Resolved 26 March 2024
Resolution: Plans and design verification documents have been submitted to the Marine Safety Center for review. The TPO, TVIB, will maintain oversight of the completion of the plan verification process for the vessel and inform the OCMI once the process is complete.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 1 August 2023
Resolved
Vessel is undergoing substantial repairs and modifications at Southwest Shipyard, Brady Island, Houston, TX with the intent of returning to service as an Inspected Towing Vessel.
Following review of submitted scope of work, Sector Houston Galveston has determined modifications substantially prolong the life of the vessel and may be considered a Major Conversion as defined in 46 CFR 136.110 and 46 USC 2101(18).
Owner/operator is required to submit documentation to the USCG Marine Safety Center (MSC) for a Major Conversion Determination.
46 CFR 136.110
46 USC 2101(18)
Action required: 17 - Rectify deficiencies prior to departure
Due 1 September 2023
Resolved 26 August 2023
Resolution: MSC determination received.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 July 2023
Resolved
Verification of compliance with design standards, when required by § 144.135, must be performed by an individual or entity who meets the requirements of § 144.140.
The vessel is undergoing extensive modifications at Southwest Shipyard, Brady Island, Houston, TX. Upon request by the Coast Guard MI, verification of design standards has not been provided IAW 46CFR144.145 including but not limited to 46CFR144.145(b). Upon request by Coast Guard MI, the Owner failed to provide the required documentation.
The company shall provide documentation to the satisfaction of the TPO and Coast Guard prior to the vessel being placed back in service.
Action required: 60 - Rectify deficiencies prior to movement
Due 30 November 2023
Resolved 12 September 2023
Resolution: Deisgn verification recieved.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 July 2023
Resolved
Verification of compliance with design standards must include review and analyses of sufficient plans, drawings, schematics, calculations, and other documents to ensure the vessel complies with the standards used. The plans must be stamped with the seal authorized for use by the individual or entity performing the verification of compliance, or otherwise indicate that they have been reviewed and determined to meet the applicable standards by an individual or entity who meets the requirements of § 144.140. Upon request by Coast Guard MI, the Owner failed to provide the requested documentation.
The company shall provide documentation to the satisfaction of the TPO and local OCMI. The required documentation shall include but is not limited to the requirements of 46CFR144.145(g) prior to the vessel being placed back in service.
Action required: 10 - Deficiency Rectified
Due 15 December 2023
Resolved 15 December 2023
Resolution: Completed inclining experiment and received reasonable data. The PE will submit to MSC for approval and issuance of the stability letter. The vessel is authorized to operate while the information is being processed.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 24 July 2023
Resolved
A copy of the verified plan must be provided to the cognizant Officer in Charge, Marine Inspection (OCMI) and the third-party organization (TPO) conducting the surveys, if applicable, except as provided in paragraph (e) of this section. Upon request by Coast Guard MI, the Owner failed to provide the requested documentation.
The company shall provide the associated plans and documentation to the satisfaction of the TPO and local OCMI prior to the vessel being placed back in service.
The owner or managing operator of a towing vessel that chooses the TSMS option for a towing vessel must document compliance with this subpart as follows: Provide objective evidence of an internal survey program.
Action required: 60 - Rectify deficiencies prior to movement
Due 30 November 2023
Resolved 7 December 2023
Resolution: Survey completed by TPO, Sabine Surveyors.