Records from 2014 to 2026. Most recent: inspection, 11 August 2026.
Inspection history · 26
11 August 2026
In-Service Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8462130
23 April 2026
Deficiency Check · Administrative Inspection · DAPI Audit · Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8314539
28 October 2025
Administrative Inspection · Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8259392
21 August 2025
In-Service Inspection · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8215160
7 May 2025
Annual Inspection · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 8130343
10 August 2023
Plan Review "T" Boat · Damage Survey · Administrative Inspection · COI Inspection · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7765354
10 August 2023
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7768320
10 May 2023
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7685298
9 February 2023
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7636659
5 January 2023
Liferaft Servicing
Physical examination · Marine Safety Detachment Homer · USCG Arctic District (CGD-A) · Activity 7617031
19 April 2022
Deficiency Check
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7444275
13 April 2022
Annual Inspection · Deficiency Check · Administrative Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7426869
12 October 2021
Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7331506
15 August 2021
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7290428
8 April 2021
Administrative Inspection · Annual Inspection · Deficiency Check · DAPI Audit
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 7179326
29 May 2020
Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6973480
7 October 2019
Examination of Repairs · Drydock Exam · Internal Structural Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6830924
29 April 2019
COI Inspection · Administrative Inspection
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6673072
26 April 2018
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6400167
14 March 2018
Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6371134
16 February 2018
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6356504
2 May 2017
Annual Inspection · DAPI Audit
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6094401
26 May 2016
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5909716
6 May 2016
Annual Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5825927
14 March 2016
Examination of Repairs · Hull Examination
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5840602
12 March 2014
Drydock Exam · Deadweight Survey · Construction Oversight · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 4814663
04 - Emergency Systems › N/A - No Subsystem › Abandon ship drills
Issued 23 April 2026
Resolved
Conduct underway Fire, Man overboard and Abandon ship drills with CG Marine Inspectors prior to carring passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2026
Resolved 30 April 2026
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 April 2026
Resolved
Prove proper operation of both bilge pumps. Both bilge pumps were found with there covers not fully bolted in place.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2026
Resolved 30 April 2026
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 April 2026
No resolution recorded
Repair two pin hole leaks in fire main located in starboard side fuel void. leaks are at the joints that go from the vertical pipe the the risers to the fire stations.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2026 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 April 2026
Resolved
replace both life ring buoy light batteries. One is expired and the other has the expiration date sharped out.
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2026
Resolved 30 April 2026
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 23 April 2026
Resolved
Provide current CG light list and US Coast Pilot
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2026
Resolved 30 April 2026
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 23 April 2026
Resolved
Reinstall aft draft marking the next time the vessel comes out of the water.
Action required: 705 - Other - as specified
Due 7 May 2026
Resolved 30 April 2026
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 April 2026
Resolved
Replace life ring buoy on 2 deck starboard side aft
Condition: Unknown
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2026
Resolved 30 April 2026
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 23 April 2026
Resolved
Update NOAA EPIRB registration paper work with the vessel correct call sign.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 May 2026
Resolved 11 August 2026
Resolution: RCVD e-mail with update EPIRB reg.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 23 April 2026
Resolved
All first aid kits onboard have expired items. Replace all expired items and provide one first aid kit the meets the requirements of 46 CFR 160.041
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2026
Resolved 30 April 2026
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 April 2026
Resolved
Repair/ replace fire pump. Fire pump is leaking water on the inlet side and is not producing 60 psi.
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2026
Resolved 30 April 2026
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 23 April 2026
Resolved
repair fuel leak on starboard side fuel tank sight glass
Action required: 17 - Rectify deficiencies prior to departure
Due 23 April 2026
Resolved 30 April 2026
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 14 August 2023
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Vessel sustained through-hull damage on starboard quarter. Provide permanent repair proposal for CG review and approval, with repairs to be completed no later than 31Oct2023. Vessel is authorized to operate with passengers with CG approved temporary repair until 31Oct2023. 46CFR177.100
Action required: 705 - Other - as specified
Resolved 7 December 2023
Resolution: Stbd transom plate and framing, to centerline above water line, replaced in kind.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 10 May 2023
Resolved
The vessel must have the original Certificate of Documentation on board. The COD was a photo copy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 May 2023
Resolved 25 May 2023
Resolution: Corrected.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 May 2023
Resolved
The vessels lifesaving and fire fighting equipment must be properly marked.
1. The upper deck aft portable fire extinguisher markings is obstructed by the garbage can.
2. The upper deck adult life jacket storage compartment must be labeled with the quantity stored.
3. The upper deck fire hose storage cabinet needs to be identifiable.
4. The Port/STBD fuel shutoff valve remote stations need to be relabeled.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2023
Resolved 25 May 2023
Resolution: Corrected.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 May 2023
Resolved
All electrical equipment and circuits must be clearly marked. The breaker used for the SAT radio needs to be properly labeled.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2023
Resolved 25 May 2023
Resolution: Corrected.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 10 May 2023
Resolved
The vessel is inspected to the material and structural standards of the regulations at every inspection. The exterior ladder going to the upper deck has a cracked weld.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 10 June 2023
Resolved 25 May 2023
Resolution: Corrected.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 14 April 2022
Resolved
Supervisory personnel must receive at least 60 minutes of DAPI training as per 46 CFR 16.401 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2022
Resolved 31 May 2022
Resolution: Proof of completed training provided to satisfaction of attending Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 14 April 2022
Resolved
Waste receptacles must be constructed of noncombustible materials with no openings in the sides or bottom. Replace or prove all trash on board are non combustible
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 May 2022
Resolved 27 April 2022
Resolution: Waste recepticles replaced (noncombustible/metal).
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 April 2022
Resolved
Replace both 2nd deck aft Life Ring buoys.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2022
Resolved 3 May 2022
Resolution: Liferings were replaced and properly installed.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 14 April 2022
Resolved
Reinstall shaft guards in both engine rooms.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2022
Resolved 21 April 2022
Resolution: Guards have been reinstalled
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 April 2022
Resolved
Replace both expired Batteries in the life ring buoy lights
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 April 2022
Resolved 21 April 2022
Resolution: batteries have been repalced
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 14 April 2022
Resolved
Replace crack electrical j-box in port fuel void.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 May 2022
Resolved 31 May 2022
Resolution: Electrical junction box replaced.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 9 April 2021
Resolved
Due to weather, MOB drill was not conducted. Complete satisfactory MOB drill in presence of CG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 21 April 2021
Resolution: drill sat
Engineering › Bilge Water Management System › Not Operational
Issued 1 May 2018
Resolved
Provide operational bilge pumps to dewater all bilge spaces. Required to have two fixed power pumps on board. Port side bilge pump was not operable at the time of inspection.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 1 May 2018
Resolved 1 May 2018
Resolution: Provided proper operation of both bilge pumps.
Lifesaving › Inflatable Liferafts › Painter
Issued 1 May 2018
Resolved
Liferaft located topside was not properly secured by a painter to the float free link. Provide proper stowage and secure liferaft to the vessel.
Action required: 10 - Deficiency Rectified
Due 1 May 2018
Resolved 1 May 2018
Resolution: Painter was properly tied to the float free link.
Engineering › Steering Gear System › Rudder
Issued 15 March 2016
Resolved
Vee and Weld cracks on port and starboard rudders.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 30 April 2016
Resolved 13 April 2016
Resolution: Weld repairs verified.