Records from 2014 to 2025. Most recent: inspection, 21 August 2025.
Documentation record
Registered dimensions (L × B × D)91.0 ft × 33.9 ft × 15.1 ft
Registered tonnagegross 221 / net 36
ITC dimensions (L × B × D)91.0 ft × 33.9 ft × 15.1 ft
ITC tonnagegross 297 / net 89
BuilderSENESCO MARINE INC · NORTH KINGSTOWN, RI, UNITED STATES · built 2014
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 25 June 2026 · expires 31 July 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it221 - Regulatory (Subpart C or D), Gross Ton
297 - Convention (Subpart B), Gross Ton
36 - Regulatory (Subpart C or D), Net Ton
89 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
21 August 2025
Excursion Permit
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8214796
2 May 2025
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 8127300
16 October 2023
Administrative Inspection · COI Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7809111
17 February 2023
Excursion Permit · In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7638257
29 November 2022
Drydock Extension
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7607006
6 October 2022
Administrative Inspection · TPO Audit
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7570684
29 July 2021
Excursion Permit
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7296937
29 June 2021
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7239193
9 June 2020
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6972004
20 April 2020
Internal Structural Exam · Drydock Exam
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6941286
16 September 2019
Administrative Inspection
Administrative · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 6812900
23 January 2019
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6615237
25 September 2018
Administrative Inspection · Initial Certification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6548630
30 October 2017
Industry Initiated Exam · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6299213
9 December 2016
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6114167
26 January 2015
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5060382
9 December 2014
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5038529
8 November 2014
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 5020816
4 November 2014
Industry Initiated Exam · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5017762
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 2 May 2025
Resolved
A towing vessel must be maintained and operated so the watertight integrity and stability of the vessel are not compromised. While transiting outbound the C&D canal west of the [name withheld], the vessel ran aground and made contact with the canal bank on the port quarter. Vessel is enroute to MCallister Pier in Philadelphia and waiting for diver's to access damage.
Provide a damage survey attesting to the watertight integrity and stability of the vessel prior to vessel's movement to the satisfaction of the vessel's Third Party Organization (TPO).
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 2 May 2025
Resolved 2 May 2025
Resolution: TPO ABS conducted damage survey no finding reported, conducted sea trial. All to satisfaction of ABS.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 November 2023
Resolved
The owner, managing operator, or master of a towing vessel must ensure that the vessel's lifesaving equipment complies with the requirements of part 141 and is in good order.
The grab lines for the lifebuoys for the port and starboard bridge wings are wasted and require replacement.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 December 2023
Resolved 30 November 2023
Resolution: Per ABS report no. 6151687, the grab lines were replaced on the lifebuoys on the port and starboard bridge wings.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 1 November 2023
Resolved
The master must ensure that all hatches, doors, and other openings designed to be watertight or weathertight function properly.
Weathertight door at aft of pilothouse is wasted/holed on the inner core/side at several points.
Update 11/30/23: The deficiency due date has been extended to the next load line renewal/dry dock, on 10/26/24.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 December 2023
Resolved 30 November 2023
Resolution: Per ABS report no. 6151687, ABS has accepted the deficiency and raised statutory finding no. 62 for this item. In agreement with CG, ABS has extended the due date for replacing the door until the next ILLC renewal/dry dock, which is due on 10/26/24.
10 - Safety of Navigation › N/A - No Subsystem › GNSS receiver/terrestrial radio navigation system
Issued 1 November 2023
Resolved
Towing vessels must be equipped with the following equipment: electronic position-fixing device.
The subject vessel is certificated for an oceans route. Both GPS units at forward of main operating station appear affected by GPS rollover and show a date of 17 March 2004.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 December 2023
Resolved 30 November 2023
Resolution: Per ABS report no. 6151687, the primary GPS unit was replaced with a new unit. It was determined that the secondary unit mentioned on the 835 was a repeater of the primary unit, so it now displays the correct date/time as well.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 November 2023
Resolved
Paints, coatings, and other flammable or combustible products onboard a towing vessel must be stored in a designated storage room or cabinet when not in use that meets the requirements of 142.225.
Cans of diesel fuel for portable pump found stored outside the designated storage cabinet.
Action required: 10 - Deficiency Rectified
Due 1 November 2023
Resolved 1 November 2023
Resolution: The diesel fuel canisters were relocated to the designated storage cabinet prior to the completion of the COI inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 16 October 2023
Resolved
At least 30 days prior to the expiration of the Certificate of Inspection, a vessel's owner, charterer, managing operator, agent, master, or individual in charge shall notify the Coast Guard if the vessel will be required to be reinspected for certification or will be operated in such a manner as to not require a Certificate of Inspection. The notification required by paragraph (a) shall be in writing.
The subject's vessel's COI expired on Sunday 10/15/23. Initial written notification regarding the need for the COI renewal exam was received via email by Sector Maryland-NCR at 1531 local time on Friday 10/13.
Provide a corrective action plan, to the satisfaction of the TPO that issued the TSMS certificate (ABS) and the CG, that addresses how the Company will ensure compliance with COI expiry dates moving forward.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 November 2023
Resolved 30 November 2023
Resolution: Received corrective action plan from McAllister. The COI expiry dates are reportedly included in McAllister's maintenance tracking program (Sinex) for visibility by all parties, and additionally automated emails regarding expiry are sent 90 days' out.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 23 January 2019
Resolved
Stbd generator failed while vessel was performing operations. Repairs to be completed and verified by TPO/ USCG MI prior to resuming operations.
Action required: 705 - Other - as specified
Resolved 24 January 2019
Resolution: Received satisfactory report from TPO attesting to the repairs being completed and the machinery being fully operational.