Records from 2014 to 2026. Most recent: inspection, 13 May 2026.
Documentation record
Registered dimensions (L × B × D)297.6 ft × 54.0 ft × 12.0 ft
Registered tonnagegross 1,619 / net 1,619
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRINITY MARINE PRODUCTS INC · ASHLAND CITY, TN, UNITED STATES · built 2014
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portTUSCALOOSA, AL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 2 April 2026 · expires 30 April 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1619 - Simplified, Net Ton
1619 - Simplified, Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
13 May 2026
Annual Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8344145
3 April 2025
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8104745
5 February 2024
Cargo Tank Internal · COI Inspection · Drydock Exam · Administrative Inspection · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7860744
26 November 2022
Type not recorded
No type recorded · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 7606892
4 August 2022
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7559922
27 June 2022
Periodic Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7489783
29 July 2021
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7275541
9 June 2020
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6971747
24 December 2019
Administrative Inspection · Examination of Repairs · Damage Survey
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6878990
30 August 2019
Administrative Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6803426
13 June 2019
Administrative Inspection · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6712644
25 July 2018
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6490772
8 January 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6334335
17 July 2017
Administrative Inspection · Periodic Inspection · MTSA Verification
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6211833
11 July 2017
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6205607
26 October 2016
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6046803
20 July 2015
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5208754
11 February 2015
Administrative Inspection
Administrative · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 5067745
1 August 2014
Internal Structural Exam · Drydock Exam · Initial Certification · Hull Examination · Initial Construction-Excluding Oversight · Administrative Inspection · Cargo Tank Internal · MTSA Verification
Physical examination · Marine Safety Detachment Nashville · USCG Heartland District (CGD-H) · Activity 4953910
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 December 2019
Resolved
PTC 1402 allided with a bridge and suffered damage on the port forward knuckle. Barge is to transit directly to Centerpoint Facility, Chickasaw, AL to offload cargo. Prior to loading any cargo, a damage survey must be conducted. During the transit, soundings of the voids and cargo tanks shall be taken every four hours to ensure no cargo migration. If cargo migration is detected, Sector Mobile Command Center should be notified.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 January 2020
Resolved 2 January 2020
Resolution: Barge arrived to Delta Marine, Chickasaw, AL and a Damage Survey Report was conducted.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 24 December 2019
Resolved
When minor alterations or minor repairs of tank vessels become necessary such work shall be under the direction of the Officer in Charge, Marine Inspection, and shall be in accordance with the regulations in effect. All welding repairs shall be overseen and approved by CG Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 January 2020
Resolution: See narrative
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 30 August 2019
Resolved
Repairs identified in void spaces on structural members, cracked welds, and deformed vertical channels shall be repaired as per verbal proposal. Provide written repair proposal as per discussions. Vessel may not operate until repairs identified have been repaired to the satisfaction of the Coast Guard.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 13 September 2019
Resolved 6 September 2019
Resolution: All called out steel work was satisfactorily completed
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Communications
Issued 26 October 2016
Resolved
Cargo gauge needed to be replaced
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 November 2016
Resolution: New gauge installed
Engineering › Fuel Oil Service System › Ventilation
Issued 20 July 2015
Resolved
Fuel tank flame screen needed to be replaced
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 20 July 2015
Resolution: Flame screen replaced prior to completion of inspection