Records from 2014 to 2025. Most recent: inspection, 12 November 2025.
Documentation record
Registered dimensions (L × B × D)40.0 ft × 12.0 ft × 3.6 ft
Registered tonnagegross 7 / net 7
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCORINTHIAN CATAMARANS LLC · Tarpon Springs, FL, UNITED STATES · built 2014
Hull materialFRP (Fiberglass)
PropulsionGasoline Outboard
Hull shapeShip
Hull configurationTwin Hull
Hailing portBONITA SPRINGS, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 30 January 2026 · expires 31 January 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it7 - Simplified, Gross Ton
7 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 22
12 November 2025
Annual Inspection · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8262398
16 October 2024
COI Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 8019102
12 August 2024
In-Service Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7979388
24 April 2024
Hull Examination
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7899990
4 January 2024
Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7845145
21 March 2023
Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7656392
31 October 2022
Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7585365
31 October 2022
Type not recorded
No type recorded · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7586551
12 October 2022
Administrative Inspection
Administrative · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7575974
25 July 2022
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7513472
19 October 2021
Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7334601
6 November 2020
Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7089002
22 July 2020
In-Service Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7011240
15 July 2020
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7001393
4 September 2019
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6803757
28 September 2018
Annual Inspection · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6550137
16 July 2018
Drydock Exam · Internal Structural Exam · Administrative Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6477549
1 November 2017
Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6296098
6 October 2016
Annual Inspection · DAPI Audit
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 6006503
28 July 2016
Deficiency Check · Administrative Inspection · Hull Examination
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 5955817
12 November 2015
Annual Inspection · DAPI Audit
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 5746637
16 October 2014
Initial Certification · DAPI Audit
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 4994500
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 12 October 2022
Resolved
Vessel was identified as having potential damage from Hurricane IAN. Prior to conducting repairs, contact the local USCG Marine Inspections office and submit a repair proposal for approval. Vessel is not permitted to return to commercial service until cleared by a USCG Marine Inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 1 December 2022
Resolution: Vessel underwent a successful annual inspection (Activity 7585365) and no damage affecting the safety and seaworthness of the vessel was identified.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 October 2019
Resolved
Alcohol test strips are expired, provide satisfactory test strips.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 October 2019
Resolved 17 October 2019
Resolution: Provided receipt of purchase of new test strips.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 10 October 2019
Resolved
Charts are not updated, provide updated charts.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 October 2019
Resolved 17 October 2019
Resolution: Provided receipt of purchase of new up to date approved charts.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 10 October 2019
Resolved
No Coast Pilot provide, provide up to date Coast Pilot of applicable areas.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 October 2019
Resolved 17 October 2019
Resolution: Provided purchase receipt of new up to date Coast Pilot.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 10 October 2019
Resolved
EPIRB hydrostatic release is expired, provide proof it is not or provide satisfactory hydrostatic release.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 October 2019
Resolved 17 October 2019
Resolution: Provided new serviceable hydrostatic release with marking of expiration date.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 28 September 2018
Resolved
Replace hydraulic hose on port engine due to chafing of outer layer. (46CFR176.800)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 12 October 2018
Resolved 28 September 2018
Resolution: Replaced hose with new one.
Engineering › Fuel Oil Service System › Valve, Control
Issued 1 November 2017
Resolved
Nuts on fuel shut off valves are extremely rusty, replace nuts on both valves. (46CFR176.800)
Action required: 705 - Other - as specified
Due 15 November 2017
Resolved 14 November 2017
Resolution: Replaced entire fuel shut off valve assembly on both fuel tanks.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 28 July 2016
Resolved
vessel has passed dry dock due date, do not carry passengers until dry dock has been completed.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 August 2016
Resolution: Conducted dry dock/hull exam.
Construction/Loadline › Hull › Side Shell
Issued 28 July 2016
Resolved
Make permanent repairs to all areas identified on hull during inspection.
Action required: 705 - Other - as specified
Due 1 August 2016
Resolved 11 August 2016
Resolution: Effected areas were glassed and matted with resin applied. Gel coat/primer completed repairs.
Documentation › Logs/Records › Drug Test Records
Issued 16 October 2014
Resolved
Add ISLAND RUNNER to consortium contract.
Due 30 October 2014
Resolved 16 October 2014
Resolution: ISLAND RUNNER added to consortium contract. Contract was emailed to DD Fort Myers.
Lifesaving › Lifejacket/PFD (Type IV) › Lights
Issued 16 October 2014
Resolved
Replace waterlight battery with required battery type.
Due 30 October 2014
Resolved 20 October 2014
Resolution: Waterlight replaced.
Navigation › Piloting/Steering › Inland Navigation Rules
Issued 16 October 2014
Resolved
Provide Navigation Rules.
Due 30 October 2014
Resolved 20 October 2014
Resolution: Navigation Rules provided.
Communications › Visual Communication › Warning Sign (gangway)
Issued 16 October 2014
Resolved
Provide a Broadcast Placard.
Due 30 October 2014
Resolved 20 October 2014
Resolution: Broadcast Placard provided.
Lifesaving › Lifejacket/PFD (Type IV) › Condition
Issued 16 October 2014
Resolved
Repair or replace ring buoy lanyard.
Due 30 October 2014
Resolved 20 October 2014
Resolution: Ring buoy lanyard replaced.