Records from 2015 to 2026. Most recent: inspection, 5 January 2026.
Documentation record
Registered dimensions (L × B × D)266.0 ft × 54.0 ft × 13.0 ft
Registered tonnagegross 1,568 / net 1,568
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderCONRAD ORANGE SHIPYARD INC · ORANGE, TX, UNITED STATES · built 2015
Hull materialSteel
PropulsionNot recorded
Hull shapeBox
Hull configurationMonohull
Hailing portHOUSTON, TX
Trade endorsementsCoastwise, unrestricted, Registry, non-fishing vessel
DocumentationValid · issued 7 May 2026 · expires 31 May 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1568 - Simplified, Gross Ton
1568 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 24
5 January 2026
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8290131
23 December 2025
Deficiency Check · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8286680
8 December 2025
Damage Survey
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 8279324
28 January 2025
Special · Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8070954
15 January 2025
Cargo Tank Internal · Examination of Repairs · MTSA Verification · Internal Structural Exam · COI Inspection · Hull Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8060123
11 December 2023
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7837977
13 October 2022
Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7576987
15 August 2022
Administrative Inspection
Administrative · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7534119
18 July 2022
Administrative Inspection
Administrative · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7510209
15 December 2021
MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7367015
8 December 2020
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 7108442
18 December 2019
COI Inspection · Examination of Repairs · MTSA Verification · Cargo Tank Internal · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6876175
27 September 2019
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6818958
19 September 2019
Damage Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6815592
16 August 2019
Deficiency Check · In-Service Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6788095
12 August 2019
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6781503
20 August 2018
Annual Inspection · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6517531
1 February 2018
Administrative Inspection
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6347728
12 September 2017
Periodic Inspection
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 6265947
25 July 2016
Administrative Inspection · MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5954557
27 April 2016
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5861890
19 April 2016
Deficiency Check · Examination of Repairs · Damage Survey
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5858586
19 April 2016
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5869622
22 January 2015
Construction Oversight · Initial Certification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5176540
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 8 December 2025
Resolved
No extensive repairs shall be made without the notification of the local OCMI. The barge has sustained damage to hull at the upper corner starboard bow void, rendering it unfit for service. Repair proposals shall be submitted and permanent repairs shall be made to the satisfaction of the attending USCG Marine Inspector.
The barge is allowed to transit from mile marker 486 ICW to the [name withheld] Fleeting area in Victoria, TX to await cargo offload at INVISTA Victoria, TX. Once cargo offload is completed, a one time transit to Southwest Shipyard in Channelview, TX for permanent repairs is permitted.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 30 December 2025
Resolution: Wittnessed satisfactory repair.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 8 December 2020
Resolved
Barge transfer procedures do not reflect content of 33 CFR 155.750 for cargoes authorized. Amend procedures to reflect transfer of authorized cargoes.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 18 January 2021
Resolution: Transfer procedures have been amended to reflect content of 33 CFR 155.750 for cargoes authorized.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 September 2019
Resolved
vessel suffered a 3' x 4' puncture to the stbd side of the rack bow, approx 4 feet above the water line. Vessel issued a CG835 in lieu of PTP. Final repairs are to be approved by the attending marine inspector. Repair yard is Vessel Repair, Port Arthur, TX.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2019
Resolved 27 September 2019
Resolution: Air tested repair and found that vessel was fit for route and service.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 12 August 2019
Resolved
Found both liquid valves located in the center of the barge not closing properly. Header is not to be operated until the valves have recieved proper repairs and close as designed.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2019
Resolved 16 August 2019
Resolution: Both liquid valves onbard the barge were replaced. Verified proper operation; both valves operate as intended. Inspection complete.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 12 September 2017
Resolved
STBD Nav light screen is faded. Paint/replace Nav light screen, prior to operating in restricted visibility.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 27 September 2017
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 12 September 2017
Resolved
STBD liquid and vapor quick closing valves not closing in appropriate timeliness. Correct prior to operation of STBD header.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 September 2017
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 12 September 2017
Resolved
Centerline liquid quick closing valve not closing in appropriate timeliness. Correct prior to operation of centerline header.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 September 2017
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 12 September 2017
Resolved
Port vapor quick closing valve is not closing in appropriate timeliness. Correct prior to cargo ops on port header.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 September 2017
Construction/Loadline › Hull › Hull Plating
Issued 19 April 2016
Resolved
10' X 3' gash in the port side plating 6" above the water line, watertight intergrity of hull is compromised.
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 19 May 2016
Resolved 27 April 2016
Resolution: Shipyard repaired and tested damaged sections of the hull. All Sat.