Records from 2016 to 2026. Most recent: inspection, 9 February 2026.
Inspection history · 15
9 February 2026
In-Service Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8308016
8 February 2026
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8308766
29 October 2025
Damage Survey · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8260516
25 October 2025
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8260861
29 July 2025
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8191255
25 July 2025
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8194543
2 November 2024
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8028553
9 May 2022
PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7445810
14 March 2021
Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7156038
9 May 2020
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6950887
18 March 2019
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Long Island Sound · USCG Northeast District (CGD-NE) · Activity 6644613
6 February 2018
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6350129
2 August 2017
PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6223680
20 August 2016
Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5978173
17 May 2016
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5879257
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 9 February 2026
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. Vessel experienced a loss of propulsion while transiting the Tampa Bay Zone. 74 SOLAS (2020) I/11. 60 (AC)
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 9 February 2026
Resolved 9 February 2026
Resolution: recieved class report.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 October 2025
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ships or persons onboard. PSCO observed maintenance due list in the red with multiple items due. Crew was unable to provide documentation showing that the maintenance has been completed within schedule.
74 SOLAS 2020
I/II(a)
50ac
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 November 2025
Resolved 9 February 2026
Resolution: Reviewed maintenance logs in Engine Control Room. Maintenance was found to be up to date.
Construction/Loadline › Markings › Load Line Assigning Authority Mark
Issued 2 August 2017
Resolved
01-1220- THE RING, LINES AND LETTERS SHALL BE PERMANENTLY MARKED ON THE SIDES OF THE SHIP. THE LETTERS WERE NOT PERMANENTLY MARKED. ICLL 1/8 40a
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 2 August 2017
Resolved 6 February 2018
Resolution: Class Survey received by SEC DEL BAY found all sat. See attached document.
Fire Fighting › Remote Fuel Shutoff › General
Issued 2 August 2017
Resolved
02-0730- OIL FUEL PIPES HAVING THE CAPACITY OF 500 L AND ABOVE SHALL BE FITTED WITH A COCK OR VALVE CAPABLE OF BEING CLOSED FROM OUTSIDE THE SPACE. VALVE WOULD NOT OPERATE. 10c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 August 2017
Resolved 2 August 2017
Resolution: CREW WAS ABLE TO PROPERLY INSTALL THE VALVE WHICH ALLOWED IT TO OPERATE PROPERLY.
Operations/Management › Vessel Safety Management › Resources and Personnel
Issued 17 May 2016
Resolved
Ships shall have on board food and water supplies which, having regard to the size and crew and the duration and nature of the voyage, are suitable in respect of quantity, nutritive value, quality and variety. PSCO observed insufficient amount of food provisions.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 May 2016
Resolution: Vessel provided invoice for provisions of suitable quantity, quality, and variety. Invoice included in documents.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 17 May 2016
Resolved
After any survey of the ship under regulation 7,8, 9, or 10 has been completed, no change shall be made in the structural arrangements, machinery, equipment and other items covered by the survey, without the sanction of the Administration. PSCO observed approx. 8-inch gash on arm of #4 crane, located in a high-stress section.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 20 May 2016
Resolution: Deck crane no.4 reported/found with 8 inch gash at the bottom. Before next cargo operations repair proposal by the crane manufacturer to be provided to class. Class survey included in documents
Operations/Management › Vessel Safety Management › External Certification/Verification/Control
Issued 17 May 2016
Resolved
The SMS should include procedures ensuring non-conformities... and hazardous situations are reported to the company, investigated, and analyzed with the objective of improving safety. There is no record of damaged crane being reported to the company. Recommend SMS audit to address reporting procedure and provisions shortage.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 May 2016
Resolution: Received Report that audit was conducted. All deficiencies have been rectified.