Records from 2016 to 2021. Most recent: inspection, 7 January 2021.
Inspection history · 27
7 January 2021
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7121288
4 January 2021
Explosive Handling Operation-Commercial
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7117799
16 November 2020
Administrative Inspection
Administrative · Activities Europe · Activity 7095891
23 October 2020
Administrative Inspection
Administrative · Activities Europe · Activity 7084138
1 October 2020
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7062768
21 September 2020
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7058586
18 September 2020
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 7060617
17 September 2020
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 7119792
19 August 2020
Deficiency Check · Administrative Inspection
Physical examination · Activities Europe · Activity 7037047
2 June 2020
In-Service Inspection · Deficiency Check
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6966373
30 May 2020
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6957052
29 May 2020
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6957087
23 April 2020
Administrative Inspection
Administrative · Activities Europe · Activity 6943300
14 April 2020
Type not recorded
No type recorded · Activities Europe · Activity 6941223
13 April 2020
Type not recorded
No type recorded · Activities Europe · Activity 6941743
13 February 2020
Type not recorded
No type recorded · Activities Europe · Activity 6910419
4 January 2020
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6880155
1 January 2020
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6881438
30 November 2019
Administrative Inspection
Administrative · Activities Europe · Activity 6866028
29 November 2019
Type not recorded
No type recorded · Activities Europe · Activity 6868640
13 November 2019
Explosive Handling Operation-Military
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6846882
5 November 2019
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6849475
4 November 2019
Administrative Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6849053
30 October 2019
Type not recorded
No type recorded · Sector North Carolina · USCG East District (CGD-E) · Activity 6849859
16 October 2019
Administrative Inspection
Administrative · Commandant (CG-5P-TI) · Activity 6838621
6 September 2019
MTSA/ISPS Verification · MSP Initial Reflag
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 6831450
4 March 2016
COE-Offshore
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5826925
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 18 September 2020
Resolved
Fire protection systems and fire fighting systems and appliances shall be maintained ready for use at all times while the ship is in service; the shaft on the main fire pump is sheared rendering it inoperable. Repair pump and provide Class Report attesting to proper performance.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2020
Resolved 28 September 2020
Resolution: Received satisfactory eveidence and class report for proper operation of fire pump
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 2 June 2020
Resolved
The condition of the ship and its equipment shall ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship. Vessel experienced loss of steering during operational testing at berth and is unable to utilize steering in follow-up mode.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 4 June 2020
Resolution: Witnessed satisfactory steering test with ABS and Technician.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 30 November 2019
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The Ship Service Diesel Generator #2 breaker tripped offline for unknown reasons, causing a blackout and temporary loss of propulsion. Make proper repairs and provide class report attesting to same.
Action required: 705 - Other - as specified
Due 14 December 2019
Resolved 19 December 2019
Resolution: Cleared issued defeciency with report from attending technician and survey report from attending ABS Surveyor were provided via email (see Documents for further information).
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 November 2019
Resolved
Fire protection systems and fire-fighting systems and appliances shall be properly tested and inspected. Fixed CO2 system flexible hoses for Scavenge Air Box and Separator Room have no records of being replaced at ten year interval as required by MSC.1/Circ 1318. Replace hoses for 03 CO2 bottles. 74 SOLAS (14) II-2/14.1.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 7 November 2019
Resolved
Boilers and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Multiple fuel leaks are present on the composite boiler resulting in pooled fuel in containment. Identify source of fuel leaks, repair. 74 SOALS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 7 November 2019
Resolved
The safety of crew and ship from electrical hazards will be ensured. Battery charger installation in steering gear room has spring clip connections in wire and is connected via spliced plug into socked. Provide documentation to show charger is marine grade and make permanent the electrical installation. 74 SOLAS (04) II-1/40.1.3
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2019
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 November 2019
Resolved
Machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. Multiple leaks are present on the #1 SSDG which resulted in pooled oil in the forward portion of containment and under flywheel. Identify cause, repair, prove proper operation. 74 SOLAS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2019
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 7 November 2019
Resolved
Machinery and associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended. The #3 SSDG has lube oil leak at lube oil pimp resulting in pooled lube oil in containment. Identify cause, repair, prove proper operation. 74 SOLAS (04) II-1/26.1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2019
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 7 November 2019
Resolved
Precautions shall be taken to prevent any oil that may escape under pressure from any pump, filter, or heater from coming into contact with heated surface. The fuel oil supply line to the composite boiler igniter was missing spray take on the flange. Install spray tape. 74 SOLAS (09) II-2/4.2.2.6.2
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2019
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 7 November 2019
Resolved
The condition of the ship and its equipment shall be maintained to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons onboard. The flood light at the rescue boat davit is inoperable. Repair and prove proper operation. 74 SOLAS (14) I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2019
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 7 November 2019
Resolved
Ignition sources shall be separated from combustible materials and flammable liquids. Two of three overhead ventilation screens were deteriorated and missing in the forward paint locker. Replace flame screen. 74 SOLAS (09) II-2/4.1.5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 December 2019
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 November 2019
Resolved
The condition of the ship and its equipment shall be maintained to ensure that the ship in all respects will remain fit to proceed to sea. The main engine suffered reduction, and subsequent loss, of propulsion on transit from Hampton Roads, VA to Sunny Point, NC. Identify cause, conduct repairs, and prove proper operation. 74 SOLAS (14) I/11(a)
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2019
Resolution: Successful sea trials and repairs attested to by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 November 2019
Resolved
Propulsion machinery orders from the navigation bridge shall be indicated in the main machinery control room or at the maneuvering platform. During transit of Cape Fear River to Sunny Point, NC, the Engine Order Telegraph failed to respond to ordered changes and communications were limited to sound-powered phone between navigation bridge and local control on MDE. Identify cause, conduct repairs, and prove proper operation. 74 SOLAS 904) II-1/31.2.4
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2019
Resolution: Successful sea trials and repairs attested to by RO.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 November 2019
Resolved
It shall be possible to control the propulsion machinery locally, even in the case of failure in any part of the remote control system. During maneuvering at the dock in Sunny Point, NC, local control of the MDE failed. Identify cause, conduct repairs, and prove proper operation. 74 SOLAS (04) II-1/31.2.6
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2019
Resolution: Successful sea trials and repairs attested to by RO.
12 - Dangerous Goods › N/A - No Subsystem › Fire protection cargo deck area
Issued 4 November 2019
Resolved
Arrangements shall be made to ensure immediate availability of a supply of water from the fire main at the req'd pressure either by permanent pressurization or by suitably placed remote arrangements for the fire pumps. The cargo hold deluge system pump, "LA07 Fire Pump for Dang Goods" is tagged out with "Danger Do Not Operate" tag on main switchboard in Engine Control Room. Prove proper operation prior to loading/discharging/transporting dangerous goods. 74 SOLAS (09) II-2/19.3.1.1
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 November 2019
Resolution: Repairs attested to by RO.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 15 October 2019
Resolved
Vessel shall have a telephone or other means to communicate heading information to the emergency steering position. Vessels sound powered phone on navigation bridge does not transmit. 74 SOLAS 14 V/19.2.9
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 October 2019
Resolved 28 October 2019
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 15 October 2019
Resolved
Stairways which penetrate more than a single deck shall be surrounded by "A-0" class divisions and be protected by self closing doors at all levels. Vessel's gasket material around stairway doors need replaced on A, B, C, D, E, G, Poop deck. 74 SOLAS 04 II-2/9.2.3.4.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2019
Resolved 28 October 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 October 2019
Resolved
Measures shall be taken to the satisfaction of the Administration to ensure that equipment is functioning. Automation test procedures need to be approved by RO.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2019
Resolved 28 October 2019
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 15 October 2019
Resolved
The condition of the ship shall be maintained to conform with the present regulations to ensure the ship will remain fit to proceed to sea. The MSD system vent is wasted and allowing gas and liquid to enter the engine room. Repair to satisfaction of RO. 74SOLAS(14)I/11
Action required: 10 - Deficiency Rectified
Due 15 November 2019
Resolved 22 October 2019
Resolution: Vessel made temp repairs to satisfaction of RO. Perm repairs to be made at next dry docking.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 15 October 2019
Resolved
Means shall be provided to prevent overpressure in any part of compressed air systems. The relief valve on #1 air receiver did not open at designed pressure. Repair or replace valve and test to the satisfaction of RO. 74SOLAS(04)II-1/34.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2019
Resolved 28 October 2019
Resolution: Class report indicates on vessel on that air receiver valve lifted at MAWP of 33 BAR.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 15 October 2019
Resolved
All ventilation systems shall be capable of being closed from outside the space being ventilated. Identified numerous mushroom vents for cargo tanks were found unable to be completely closed. 74 SOLAS(04)II-2/5.2.1.1
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 October 2019
Resolved 28 October 2019
Resolution: Natural ventilator seal gaskets were overhauled and ventilator was tested and found to close tight. Recieved class report.
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 15 October 2019
Resolved
A main electric lighting system shall provide illumination throughout those parts of the ship normally accessible to the crew. Identified numerous light fixtures that need proper mounting, and need of replacement covers. 74 SOLAS(04) II-1/41.2.1
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 October 2019
Resolved 28 October 2019
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 15 October 2019
Resolved
The condition of the ship and equipment shall be maintained to conform with the provisions of the present regulations. Identified numerous areas on deck where there are improper wire spices. 74 SOLAS(14) I/11
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 November 2019
Resolved 28 October 2019