Records from 2014 to 2025. Most recent: inspection, 15 May 2025.
Documentation record
Registered dimensions (L × B × D)393.6 ft × 92.0 ft × 36.0 ft
Registered tonnagegross 9,976 / net 3,707
ITC dimensions (L × B × D)393.6 ft × 92.0 ft × 36.0 ft
ITC tonnagegross 9,976 / net 3,707
BuilderEASTERN SHIPBUILDING GROUP INC · PANAMA CITY, FL, UNITED STATES · built 2017
Hull materialSteel
PropulsionNot recorded
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 3 October 2025 · expires 30 November 2026
Service, as the file records itIndustrial Vessel
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it9976 - Convention (Subpart B), Gross Ton
3707 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 23
15 May 2025
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8136439
12 November 2024
Annual Inspection · MARPOL Annex I Examination · MTSA Verification
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8029145
6 April 2024
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7893526
12 December 2023
Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7838263
31 October 2023
Administrative Inspection · In-Service Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7819456
22 August 2023
Deficiency Check · Damage Survey
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7774186
12 June 2023
Examination of Repairs · Administrative Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7713237
13 September 2022
Plan Review (Other than "T") · Internal Structural Exam · Drydock Exam · COI Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7559422
22 September 2021
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7330870
18 September 2020
Administrative Inspection · Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7060510
22 April 2020
Examination of Repairs · Drydock Exam · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6945808
9 March 2020
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6922977
8 November 2019
Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6851961
25 October 2019
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6842232
30 September 2019
MARPOL Annex I Examination · Annual Inspection · MTSA/ISPS Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6825049
23 May 2019
Damage Survey · Administrative Inspection
Physical examination · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6692780
23 May 2019
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6716560
18 September 2018
Administrative Inspection · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6542920
30 July 2018
Damage Survey · Examination of Repairs · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6495989
3 July 2018
Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6465563
1 July 2018
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6566624
22 February 2018
Plan Review (Other than "T")
Administrative · USCG Heartland District (dp) · USCG Heartland District (CGD-H) · Activity 6359400
27 January 2014
Initial Certification · Hull Examination · Administrative Inspection · Construction Oversight · Deadweight Survey · Inclining Experiment · COI Inspection · DAPI Audit · Drydock Exam
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6183553
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 May 2025
Resolved
MI was notified of repairs and/or alterations being conducted on vessel. No repairs of alterations affecting the safety of the vessel with regard to the hull, machinery or equipment shall be made without the knowledge of the [name withheld]/alteration plan shall be approved before work is started.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
Resolution: witnessed satisfactory modifications.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 12 October 2021
Resolved
Complete but simple instructions for the operation of CO2 systems must be located in a conspicuous place at or near all pull boxes. Pull station by forward machinery had no visible instructions for activation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2021
Resolved 26 October 2021
Resolution: Vessel ordered and installed instructions and simple 1 line diagrams for Fire Suppression System.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 30 September 2019
Resolved
During inspection of the CO2 system in was noted that two CO2 bottle flex hose connections were left loose possibly allowing CO2 to collect in the storage room upon activation of the system; creating a dangerous condition to crew members. Insure fixed CO2 system is properly inspected and tested. Third party inspector to return inspect system to ensure it is properly installed and functioning.
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 30 September 2019
Resolved 25 October 2019
Resolution: CO2 system hoses were tight and inspected by Hiller in Galveston Tx.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 30 September 2019
Resolved
Piping subject to internal pressure from oil in the tank must be fitted with a positive shutoff valves. The valve shall be provided with a means of emergency manual operation regardless of the status of the power operating system. During this inspection it was noted that the hydraulic oil reservoir sight gauge to the quick closing valves indicated empty. Additionally, the weekly testing of these quick closing valves had not been completed. Test and prove proper operation of each quick closing valve in the presence of a marine inspector or class surveyor.
Action required: 705 - Other - as specified
Due 30 November 2019
Resolved 25 October 2019
Resolution: Hydraulic oil reservoir was full and quick closing valve was tested to the satisfaction of the attending MI.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 September 2019
Resolved
2.5 inch fire house found leaking during pressure test. Corrected on the spot. Crew replaced with new hose. All sat.
Action required: 10 - Deficiency Rectified
Due 30 September 2019
Resolved 30 September 2019
Resolution: Corrected on the spot.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 22 July 2019
Resolved
Vessel struck its dredge head tearing a hole in the bottom plate in way of the starboard cofferdam located between frames 115 and 135. Temporary cement coffer damn repair is satisfactory until permanent repairs can be completed. Permanent repairs shall be completed within 60 days. Vessel shall complete daily soundings and weekly inspections of repair and log them accordingly. Vessel shall report any abnormalities to ABS and USCG. Additionally, complete an ABS survey of the void space once every three months beginning September 2019 to verify fitness for service with temporary repairs and provide a report to the local USCG [name withheld] shall be completed at the next dry docking, but no later than 30 September 2020.
***Note: this requirement supersedes the CG-835 issued on 5/28/2019.***
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2020
Resolved 21 November 2019
Resolution: Vessel repaired damaged area by inserting new plate. Inspected insert, back gouge, final weld and NDT, all SAT.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 23 May 2019
Resolved
Vessel struck its dredge head tearing a hole in the bottom plate in way of the starboard cofferdam located between frames 115 and 135. Temporary cement coffer damn repair is satisfactory until permanent repairs can be completed. Permanent repairs shall be completed within 60 days. Vessel shall complete daily soundings and weekly inspections of repair and log them accordingly. Vessel shall report any abnormalities to ABS and USCG.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 28 July 2019
Resolved 22 July 2019
Resolution: CG-835 cleared and reissued on 22JULY2019 with new due date and conditions.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 3 July 2018
Resolved
18"x15" hole in the stbd cofferdam
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 August 2018
Resolved 3 August 2018
Resolution: Hull repairs were completed to the satisfaction of the attending marine inspector