Records from 2014 to 2025. Most recent: inspection, 2 December 2025.
Inspection history · 27
2 December 2025
Hull Examination · MTSA/ISPS Verification · Internal Structural Exam · Examination of Repairs · Administrative Inspection · Annual Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8282477
15 October 2025
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 8253619
15 May 2025
In-Service Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8136446
12 November 2024
MTSA Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8029156
10 May 2024
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7910160
8 April 2024
Administrative Inspection · In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7891618
6 April 2024
Type not recorded
No type recorded · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7893526
13 December 2023
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7838844
13 September 2022
Plan Review (Other than "T") · Examination of Repairs · Internal Structural Exam · Drydock Exam · COI Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7559372
7 July 2022
Special
Type not classified · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 7500815
8 March 2022
Deficiency Check · Administrative Inspection
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7424420
12 November 2021
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7351183
12 October 2021
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7330866
20 May 2021
Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7202200
7 October 2020
Damage Survey · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7073740
25 September 2020
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7067835
18 September 2020
Administrative Inspection · Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7060752
21 August 2020
Damage Survey · Administrative Inspection · Examination of Repairs
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 7039788
29 April 2020
Examination of Repairs · Administrative Inspection · In-Service Inspection · Drydock Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6945798
25 October 2019
Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6842163
30 September 2019
MTSA/ISPS Verification · MARPOL Annex I Examination · Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6824995
23 May 2019
Type not recorded
No type recorded · Marine Safety Detachment Nags Head · USCG East District (CGD-E) · Activity 6716560
18 September 2018
Administrative Inspection · MARPOL Annex I Examination · Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6542916
15 February 2018
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6355551
15 February 2018
Deficiency Check · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6355883
9 January 2018
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 6335052
27 January 2014
Initial Certification · Construction Oversight · COI Inspection · Drydock Exam · Deadweight Survey · Inclining Experiment · DAPI Audit · Administrative Inspection · Hull Examination
Physical examination · Marine Safety Detachment Panama City · USCG Heartland District (CGD-H) · Activity 6183557
14 - Pollution Prevention › 148 - Ballast Water › Ballast Water Management System (BMWS)
Issued 18 February 2026
Resolved
The master, owner, or operator of a vessel equipped with ballast water tanks and operates in waters of the US must follow a ballast water management plan.
MIs noted the BWTS was not operational at the time of inspection. Make repairs the the treatment system before ballasting operations are conducted.
46 CFR 151.2050
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 February 2026
Resolved 19 February 2026
Resolution: BWTS was repaired and fully tested by ABS. SAT.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 February 2026
Resolved
Electrical installations on vessels must ensure: protection of crew, other persons, and the vessel from electrical hazards and system integrity through compliance with the applicable system requirements (IEEE, NEC, IEC, etc) to which plan review has been approved.
MI noted a portable AC unit, in the port side main deck store space, was being used in a permanent way utilizing an extension cord for power. Plan review has not been conducted for the installation. Remove the unit and extension cord and conduct required plan review for approved installation.
46 CFR 111.01-1
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 February 2026
Resolved 19 February 2026
Resolution: Air conditioner and the extension cord have been removed from the vessel. SAT.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 May 2025
Resolved
MI was notified of repairs and/or alterations being conducted on vessel. No repairs of alterations affecting the safety of the vessel with regard to the hull, machinery or equipment shall be made without the knowledge of the [name withheld] and subsequent required testing shall be approved by the OCMI prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 12 June 2025
Resolution: obtained evidence of satisfactory completion of work.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 8 April 2024
Resolved
The installation of all systems of a marine engineering nature, together with the details of dsign, construction, and installation, shall be in accordance with the req.s of subchapter "F". Vessel suffered loss of prop[ulsion of the port main engine (due to stern tube leaking), Vessel required to conduct repairs.
Condition: Damaged By Earlier Event
Due 22 April 2024
Resolved 30 May 2024
Resolution: Identified port CPP system wear ring/Dutchmen that was severely corroded/wasted causing the seals to leak. Removed wear ring all seals were pressed forward. Conducted operationally of the CPP system - all sat.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 13 December 2023
Resolved
Fire detection systems, if installed, must meet the applicable requirements of 46 CFR 76.
A fire detection and alarm system must automatically reset to a normal operating condition after alarm and fault situations are cleared.
Fire detection panel located on the bridge is registering a fault that is unable to be cleared.
46 CFR 95.05-1(a)
46 CFR 76.27-10(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2024
Resolved 4 January 2024
Resolution: Recieved satisfactory attestation of panel functionality/repair
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 13 December 2023
Resolved
It shall be the duty of the owner, master, or person in charge to require and have performed at least once in every twelve months the tests and inspections of all fixed fire extinguishing systems on board, as described in § 91.25–20.
All fire hoses must be subjected to a test pressure equivalent to the maximum pressure to which they may be subjected in service, but not less than 100 p.s.i..
Fire hoses had not been tested to the appropriate test pressure in the past twelve months.
46 CFR 97.15-60
46 CFR 91.25-20(a)(4)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2024
Resolved 19 December 2023
Resolution: Resolved via submission of evidence of completion of satisfactory test
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 13 December 2023
Resolved
The installation of all lifesaving appliances and arrangements must be in accordance with Subchapter W.
Radio lifesaving appliance installations and arrangements must meet the requirements of 47 CFR 80.
At least three two-way VHF radiotelephone apparatus must be provided on every cargo ship of 500 tons gross tonnage and upwards. Two-way VHF radiotelephone apparatuses must conform to performance standards as specified in § 80.1101.
The equipment specified in this subpart must also conform to the appropriate performance standards listed: (7) Two-Way VHF radiotelephone: (i) IMO Resolution A.809(19), as revised by IMO Resolution MSC.149(77).
Vessel was not equipped with dedicated, sealed primary batteries for the required three two-way VHF radios as mandated by IMO Resolution MSC.149(77) 12.2.
46 CFR 96.06-1
46 CFR 199.60(a)
47 CFR 80.1095(a)
47 CFR 80.1101(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 January 2024
Resolved 19 December 2023
Resolution: Resolved via submission of proof of purchase of approved radio batteries and photographs showing them onboard
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 7 July 2022
Resolved
Raw water overboard piping has a pin hole leak in Void #5, port side. Make temporary repairs using ABS approved Belzona pipe wrap until permanent repairs can be made to the satisfaction of the attending USCG Marine Inspector at the next scheduled drydock in September of 2022. Ensure periodic checks of the space are made to ensure temporary repair is maintaining watertightness and report any changes to nearest USCG Marine Safety Detachment/Sector Inspection Division.
Action required: 705 - Other - as specified
Resolved 20 November 2022
04 - Emergency Systems › N/A - No Subsystem › Emergency steering position com./ compass reading
Issued 12 October 2021
Resolved
A gyro compass heading repeater, or other means, to supply heading information visually at the emergency steering position. The gyro repeater was not displaying the correct heading. Provide tech report.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2021
Resolved 1 November 2021
Resolution: Photos and video has been reviewed and show proof of proper operation. Deficiency cleared.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 12 October 2021
Resolved
A schematic diagram of the CO2 system shall be provided at the pull station if the CO2 cylinders are not within the protected space. Provide a schematic drawing for both the E-Gen and paint locker CO2 system at each pull station.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 October 2021
Resolved 26 October 2021
Resolution: Pictures were provided to show CO2 line diagram placards have been installed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 October 2021
Resolved
At least half of the lifebouys shall be fitted with a self-igniting light. All batteries were found expired. Replace expired batteries.
Action required: 10 - Deficiency Rectified
Due 26 October 2021
Resolved 12 October 2021
Resolution: expired batteries were replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 7 October 2020
Resolved
Whenever there is a hazardous condition on board a vessel or caused by a vessel or its operation, the owner, agent, master, operator, or person in charge must immediatley notify the nearest Coast Guard Sector Office. Vessel reported port main engine malfuntion. One Tug of adequate horsepower shall escort the vessel inbound.
Action required: 705 - Other - as specified
Resolved 7 October 2020
Resolution: Vessel complied and used tug assist upon entry into port
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 7 October 2020
Resolved
No repairs or alterations affecting the safety of the vessel with regard to the hull, machinery, or equipment, shall be made without the knowledge of the Officer in Charge, Marine Inspection. Vessel must make repairs to satisfaction of OCMI prior to departure.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 13 October 2020
Resolution: Tech report and ABS report received. Def cleared.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 21 August 2020
Resolved
Vessel reported gearbox malfunction. Propulsion machinery including main engines, reduction gear, shafting, and bearings must be maintained to ensure proper operation. Vessel shall provide satisfactory proof of repair prior to departure.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 26 August 2020
Resolution: Vessel repaired port gear box and sent in ABS report attesting to the repairs and proper operation of the port engine/gear box.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 July 2020
Resolved
An inspection shall be made whenever any important repairs or alterations to the vessel are undertaken. Vessel must receive an in-service inspection from the USCG prior to its departure from the MARRS Shipyard facility.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 23 July 2020
Resolution: In-service inspection complete.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 September 2019
Resolved
At least two lifebuoys, each with attached self-activating smoke signals, must be stowed where they can be quickly released from the navigating bridge and should, when released, fall directly into the water without striking any part of the vessel. MIs observed the lifebuoys on the bridge-wings were not able to be quickly released and fall directly into the water without striking any part of the vessel. Make arrangements to permit the quick release of the bridge lifebuoys into the water without striking any part of the vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2019
Resolved 8 March 2022
Resolution: Vessel installed 2 liferings with the Hamar HM-0630 Lifering Release system. The mounts are on the aft quarter of the transom and can be released from the bridge.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 30 September 2019
Resolved
Markings shall be provided as necessary for the guidance of persons onboard in the event of an emergency. MIs observed the total flood water mist activation station on bridge was incorrectly labeled "FIRE ALARM". Remove ambiguous labeling from the total flood water mist activation station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 October 2019
Resolved 25 October 2019
Resolution: Marking for the water mist system has been replaced with accurate labels.
Engineering › Diesel Engine (propulsion-reduction gear) › Bearing
Issued 15 February 2018
Resolved
Over heating bearing on the STBD reduction gear.
Condition: Design Flaw
Due 1 March 2018
Resolved 22 February 2018
Resolution: Bearing was replaced and total system was inspected for damage.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 20 November 2017
Resolved
Replace the STBD Main Pillow Block temperature sensor. Conduct operational testing to the satisfaction of the attending Coast Guard Marine Inspector. When the vessel is underway the crew shall conduct Engine Room rounds at 30 min intervals to monitor the temperature of the STBD Main Pillow Block.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 20 January 2018
Resolved 16 February 2018
Resolution: replaced and tested to the satisfaction of the attending CGMI
Engineering › Reduction Gearing/Clutches › Clutch Plate
Issued 20 November 2017
Resolved
Prove proper operation of the emergency clutch out system to stop main propulsion shaft rotation on both Port and STBD Shafts. The vessel is required to demonstrate Procedure No. 4 from Section 3 of the Periodic Safety Test Procedures (PSTP) to the satisfaction of the attending Coast Guard Marine Inspector.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 January 2018
Resolved 16 February 2018
Resolution: received tech report from manufacturer attesting to the operation of the reduction gear.