Records from 2016 to 2026. Most recent: inspection, 22 July 2026.
Inspection history · 22
22 July 2026
COC-CHEM & TVE Annual
Type not classified · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8444141
12 June 2025
COC-CHEM & TVE Renew · Administrative Inspection · PSC B
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8151720
3 June 2025
Type not recorded
No type recorded · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 8150760
6 September 2024
PSC B · COC-CHEM & TVE Annual
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7993825
29 December 2023
Administrative Inspection
Administrative · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7843543
29 December 2023
Type not recorded
No type recorded · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7847622
24 July 2023
COC-CHEM & TVE Renew · PSC B
Physical examination · Marine Safety Unit Baton Rouge · USCG Heartland District (CGD-H) · Activity 7750566
16 September 2022
In-Service Inspection
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7560645
6 September 2022
Bulk Liquid Transfer Monitor
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7559537
5 September 2022
Damage Survey
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7552166
5 September 2022
Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7568095
1 September 2022
COC-CHEM & TVE Annual · PSC B
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7543922
10 August 2021
PSC B · COC-CHEM & TVE Renew
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 7281791
21 March 2020
PSC B · COC-CHEM & TVE Annual
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6923941
31 March 2019
Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector North Carolina · USCG East District (CGD-E) · Activity 6652855
28 March 2019
Administrative Inspection
Administrative · Sector North Carolina · USCG East District (CGD-E) · Activity 6651070
9 February 2018
ISPS II Exam · COC-CHEM Annual · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6347891
9 April 2017
COE-Administrative
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6117719
14 March 2017
Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6104075
15 May 2016
Deficiency Check
Physical examination · Marine Safety Unit Lake Charles · USCG Heartland District (CGD-H) · Activity 5875499
4 May 2016
Deficiency Check
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5868152
26 April 2016
ISPS II Exam · COC-CHEM & TVE Annual · Ballast Water Examination
Physical examination · Sector San Juan · USCG Southeast District (CGD-SE) · Activity 5860071
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 5 September 2022
Resolved
The structural strength of the hull shall be maintained. Vessel allided with the pier in Cooper River, Charleston, SC, puncturing the bulbous bow and slicing the side shell in way of the forepeak ballast tank and #1 STBD ballast tank respectively compromising the watertight integrity of the hull. No cargo transfer/movement until a thorough damage assessment has been completed and received by U.S. Coast Guard
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 8 September 2022
Resolution: See COTP Order
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 26 April 2016
Resolved
Each vapor connection flange must have a permanently attached 0.5 inch diameter stud at least 1.0 inch long projecting outwrd from the flange face. PSCO found that the vessel's crew had removed all studs from the vapor connection flanges in order to allow connection of a flexible hose for the purposes of inerting tanks separately from the main venting line. 46CFR39.20-3(e) 15c
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 4 May 2016
Resolution: vessel installed studs permanently attached the main venting lines.
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 26 April 2016
Resolved
PSCO found that while discharging unleaded gasoline and premium gasoline , ship's crew was inerting the cargo tanks using the main nitrogen piping as well as the vapor control system piping via a flexible hose connection at the manifold from the nitrogen line into the vapor control system flange connection. this configuration is not authorized per the vessel's approved transfer procedures.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 4 May 2016
Resolution: PSCO attested the correction of the vessel"s manning during transfer operations.
Construction/Loadline › Structures › Door
Issued 26 April 2016
Resolved
Doors required to be self closing shall not be fitted with hold back hooks. PSCO found 10 class "A" doors and 17 class "B" doors listed as self closing on the vessels fire plan to be fitted with hold back hooks. SOLAS(2014cons) II-2/9.4.2.2 15ac
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 April 2016
Resolved 15 May 2016
Resolution: PSCE attended the vessel & ensured no self closing fire doors had hold back hooks. All sat.
Documentation › Logs/Records › Operational Procedures for Engines or Equipment
Issued 26 April 2016
Resolved
In addition to the fire protection system and appliances listed in paragraph 2.2.3 tankers shall have a maintyenance plan for inert gas system. PSCO found that the vessel's crew was not following the maintenance plan for the installed nitrogen plant. Upon questioning the crew PSCO found that the crew was not conducting the calibration of the O2 sensor as per the plan.SOLAS(2014 cons) II-2/14.4.1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 26 May 2016
Resolved 15 May 2016
Resolution: PSCE received Class letter for proper maintenance schedules & reviewed crew log for maintenance. All sat.