Records from 2015 to 2025. Most recent: inspection, 9 December 2025.
Documentation record
Registered dimensions (L × B × D)491.8 ft × 72.0 ft × 41.0 ft
Registered tonnagegross 10,240 / net 10,240
ITC dimensions (L × B × D)491.8 ft × 72.0 ft × 41.0 ft
ITC tonnagegross 11,352 / net 6,173
BuilderBAY SHIPBUILDING COMPANY · STURGEON BAY, WI, UNITED STATES · built 2016
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portWILMINGTON, DE
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 11 September 2025 · expires 31 October 2026
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11352 - Convention (Subpart B), Gross Ton
10240 - Regulatory (Subpart C or D), Gross Ton
19681 - Dead Weight, Ton
6173 - Convention (Subpart B), Net Ton
10240 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
9 December 2025
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 8279678
14 October 2025
Administrative Inspection
Administrative · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8251734
5 November 2024
Internal Structural Exam · Appeal · Periodic Inspection · Administrative Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 8029658
23 January 2024
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7853398
18 May 2023
Bulk Liquid Transfer Monitor
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7691622
27 January 2023
MTSA/ISPS Verification · Annual Inspection · MARPOL Annex II Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7621122
5 October 2021
Internal Structural Exam · COI Inspection · Re-Inspection · Hull Examination · Cargo Tank Internal
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7322130
10 March 2021
Administrative Inspection
Administrative · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7153840
1 March 2021
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7152732
5 January 2021
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7121882
23 November 2020
Bulk Liquid Transfer Monitor
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7101405
16 October 2019
Internal Structural Exam · Administrative Inspection · In-Service Inspection · Periodic Inspection · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6835431
23 January 2019
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6612316
17 January 2019
Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 6611593
20 December 2017
Annual Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6327736
14 September 2015
MARPOL Annex II Examination · Internal Structural Exam · Administrative Inspection · Construction Oversight · Initial Certification · COI Inspection
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 5718563
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 23 December 2024
Resolved
Manned tank barges and tankships authorized to carry Grade A, B, C, or D liquids at any temperature, or Grade E liquids at elevated temperatures, shall be provided with a combustible gas indicator suitable for determining the presence of explosive concentrations of the cargo carried. Since the vessel cannot be manned throughout the duration of the voyage and during adverse weather conditions, the vessel must have a reliable installed system for detecting explosive atmospheres. Vessels fixed gas detection system has not been calibrated in over 3 years.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 23 December 2024
Resolved 30 December 2024
Resolution: Cleared and revised def to better align with CFR/IBC Code requirements.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Atmosphere testing instruments
Issued 23 December 2024
Resolved
A tankship also defined as (oceangoing non-self propelled vessel)in 46 CFR 153.01(b), IAW the stated cites must have two toxic/flammable vapor detectors, at least one of which must be portable, each able to measure vapor concentrations in the range of the time weighted average (TWA) for the cargo. The portable detector may be a direct reading detector tube instrument. If a fixed system is installed at least one portable must be provided. Additionally, vessel must provide a timeline for recalibration of the fixed system or a plan for its removal, and vessel must provide proof that the portable meters on board are capable of detecting toxic/flammable vapors for the cargoes carried. Vessel is restricted from carrying cargoes listed in the vessels CAA and COF that require the toxic/flammable vapor detectors. The above requirement should be rectified no later than 31JAN25 or the CAA and COF will be amended.
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 January 2025
Resolved 24 September 2025
Resolution: Vessel rep [name withheld] sent in a satisfactory report from ABS indicating the gas detection system was repaired, calibrated, and successfully tested.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 23 January 2024
Resolved
Where cargo pump shafts pierce gastight bulkheads, stuffing boxes with readily accessible gastight glands shall be provided.
MI observed the gland for the #2 cargo pump shaft bulkhead penetration was failing, and no longer provided a seal.
46 CFR 32.50-1
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 January 2024
Resolved 24 January 2024
Resolution: Replaced seal.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 23 January 2024
Resolved
Except for those spaces listed in paragraphs (e) through (k), a space that has a direct opening to any space listed in paragraphs (e) through (l) must have only the electric installations that are allowed for the space to which it opens.
MI observed an open threaded fitting on the bottom of the IG house that did not have a suitable closure to properly isolate the space from the hazardous zone.
46 CFR 32.45-1
46 CFR 111.105-31(m)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024
Resolved 2 February 2024
Resolution: Vessel installed properly threaded metallic plug.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 23 January 2024
Resolved
The Officer in Charge, Marine Inspections must be notified before - Alterations or modifications that deviate from approved plans.
MI observed a battery charger installed in the generator room that was not on the electrical plans.
46 CFR 31.35-1
46 CFR 110.30-7(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024
Resolved 29 January 2024
Resolution: Removed battery charger.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 23 January 2024
Resolved
Each vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern.
MI observed stud on spool piece for vapor connection was on the bottom of the flange.
46 CFR 39.2001(j)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024
Resolved 24 January 2024
Resolution: Corrected flange orientation
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 23 January 2024
Resolved
All materials to be used in any of work specified the various sections of this part shall be free from injurious defects and shall have workmanlike finish. The construction work shall be executed in a workmanlike manner with proper tools or equipment and shall be free from defects which would impair strength or durability.
MI observed broken handles on valves for inert gas line on top of the stbd holding tank.
46 CFR 31.30-1(a)
46 CFR 52.01-40
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024
Resolved 2 February 2024
Resolution: Vessel replaced all valve handles.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 23 January 2024
Resolved
Scantlings, material, and workmanship...shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
MI observed gooseneck vents on top of inert gas house had broken closure devices.
46 CFR 32.60-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024
Resolved 13 February 2024
Resolution: Replaced closure devices.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 23 January 2024
Resolved
Scantlings, material, and workmanship...shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society.
MI observed the doors to multiple house structures were not capable of being completely closed as designed.
46 CFR 32.60-1(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 February 2024
Resolved 2 February 2024
Resolution: Doors leading into house structures were adjusted to allow for proper closure.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 23 December 2019
Resolved
Each cable installation must meet Section 25, except 25.11 of IEEE 45-2002. Wire runs should be supported using metal type bands or buckles for support but should not exceed between frames or 610 mm. During inspection found the new Bergan Sensor installation wiring had plastic zip ties bundling the new wiring transiting under the starboard pump room and under the office into the control room. Inspect entire cable runs of the new Bergan Sensors and install proper securing bands accordingly.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 January 2020
Resolved 24 December 2019
Resolution: Technical rep. installed metal bands on Bergan Sensor cabling. All SAT.