Records from 2015 to 2024. Most recent: inspection, 18 September 2024.
Inspection history · 17
18 September 2024
PSC B · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7999238
11 January 2024
In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7848493
29 December 2023
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7843495
29 December 2023
COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7843497
23 August 2023
COC-GAS Annual · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7771717
10 March 2023
Administrative Inspection · PSC B
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7649108
27 October 2022
Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7715944
30 July 2022
PSC B · Administrative Inspection · COC-GAS Renew
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7520258
19 February 2021
Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7142779
15 January 2021
COC-GAS Renew · PSC B · Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7124843
4 September 2017
ISPS II Exam · COC-GAS Renew · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6256341
23 November 2016
In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6046587
16 November 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6042340
24 September 2016
ISPS II Exam · COC-GAS Annual · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6008170
4 March 2016
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5826931
20 January 2016
COE-Administrative
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 5800171
19 December 2015
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5784854
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Reports of non-conf., accidents & hazardous occur.
Issued 16 January 2021
Resolved
74SOLAS (14) SOLAS IX Reg 3 ISM Reg 10 The company and the ship shall comply with the requirements of the International Safety Management Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory. The company should ensure that non-conformities are reported, with possible cause (if known). During testing of the fixed gas detection, uncoupled unions were found in the sampling lines with a wrench in the vicinity. When the unions were tightened, a flow fault was found. The vessel's RO subsequently found that there was a clogged flame arrester in the compressor room. PSCO observed objective evidence in the form of loose unions, flow fault and RO report that a non-conformity had been identified, left not corrected and not reported. 50AC
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 February 2021
Resolved 19 February 2021
Resolution: Vessel manager submitted owner statement and result of ABS additional ISM audit.
12 - Dangerous Goods › N/A - No Subsystem › Instrumentation
Issued 15 January 2021
Resolved
74SOLAS(14) VII/13.1 IGC Code 13.6.8 A gas carrier shall comply with the requirements of the International Gas Carrier Code...The gas detection equipment should be capable of sampling and analyzing for each sampling head location sequentially at intervals not exceeding 30 minutes...Multiple sampling lines were found to be loose and freely passing air and span gas. After tightening by crew, spaces sampled were showing "flow fault" and unable to sample. 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2021
Resolution: RO attended. Found clogged flame arrester in compressor room.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 15 January 2021
Resolved
74SOLAS(14) II-1/45.11 In tankers, electrical equipment, cables and wiring shall not be installed in hazardous locations unless it conforms with standards not inferior to those acceptable to the organization. Electrical enclosures for ESD near booster pump, port and STBD booster pump controls, heater control, 3P cargo tank gauging device, 1P tank gauging device, center and STBD compressor controls all have cable glands that are loose or freely allow cable to be pulled out. There are no inspection proce3dures or schedule of inspection for electrical equipment in hazardous locations. 17ac
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2021
Resolution: RO attended and attested to correction of electrical deficiencies by crew.
10 - Safety of Navigation › N/A - No Subsystem › Pilot ladders and hoist/pilot transfer arrangements
Issued 15 January 2021
Resolved
74SOLAS(14)V/23.1.2 Res 1045(27) Equipment aqnd arrangements for pilot transfer which are installed on or after 1 July 2012 shall comply with the requirements of this regulation, and due regard shall be paid to the standards adopted by the organization. Ladders are being secured at intermediate drafts by shackles at the chucks/steps. Chocks/steps are not a point as strong as the side ropes. 50ac
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 February 2021
Resolved 16 January 2021
Resolution: RO attested to instructing vessel how to properly rig ladder.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 15 January 2021
Resolved
74SOLAS(14) VII/13.1 IGC Code 3.6.3 A gas carrier shall comply with the requirements of the International Gas Carrier Code...An audible and visual alarm system to give a warning on both sides ofthe airlock should be provided to indicate if more than one door is moved from the closed position. Airlock alarnm to the motor room did not activate properly with both doors open. 17ac Corrected before PSC team left vsl. 10c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 January 2021
Resolution: Deficiency rectified prior to PSC team leaving the vessel
12 - Dangerous Goods › N/A - No Subsystem › Other (tankers)
Issued 15 January 2021
Resolved
74SOLAS(14) VII/13.1 IGC Code 5.6.4 A gas carrier shall comply with the requirements of the International Gas Carrier Code...Emergency shutdown valves in liquid piping should fully close under all service conditions with 30s of activation. Upon testing ESD, port side manifold liquid line. Self closing valve took 50 seconds to close. 17ac Corrected before PSC team left vsl. 10c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 15 January 2021
Resolution: Deficiency rectified prior to PSC team leaving the vessel