MAURY USCG vessel records
← All vessels

TORM THOR

TORM THOR is a tank ship. The Coast Guard has recorded 20 inspections since 2018, most recently in March 2026, along with 10 deficiencies and 2 operational controls.

Records from 2018 to 2026. Most recent: inspection, 28 March 2026.

Built
Not recorded
Last inspected
28 March 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Identity

9712292
1369573
Flag
UNITED STATES
Maury page id
psix-1369573

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Tank Ship class in Maury's sources begin in 2016.

Inspections, by type

…with no type recorded2
Years with a record 8 calendar years (2018–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. The counts in the strip above are the same counts; this table splits the inspections by the kind of activity recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Documentation record

Registered dimensions (L × B × D)575.1 ft × 105.6 ft × 62.7 ft
Registered tonnagegross 29,609 / net 13,788
ITC dimensions (L × B × D)575.1 ft × 105.6 ft × 62.7 ft
ITC tonnagegross 29,609 / net 13,788
BuilderNot recorded
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portWILMINGTON, DE
Trade endorsementsRegistry
DocumentationValid · issued 17 October 2025 · expires 30 November 2026
Service, as the file records itTank Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it29609 - Convention (Subpart B), Gross Ton
49666 - Dead Weight, Ton
13788 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

What it gives that this page does not: the whole record in one dated, citable document — every line with its Coast Guard activity id, the retrieval date on the cover, built to print to PDF with its page breaks — that a surveyor can attach and a lender can file. The same facts as this page, complete and in one file.

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

A request, not a checkout: leave an email and Maury replies once, with the dated document for this hull and a Stripe invoice for $299. Nothing is charged before the document is in your hands.

Inspection history · 20

28 March 2026 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8333503
2 January 2026 Administrative Inspection
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 8289534
10 July 2025 MTSA/ISPS Verification · COI Inspection · MSP COI Oversight
Physical examination · Activities Europe · Activity 8182037
13 December 2024 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8047321
8 August 2024 Administrative Inspection
Administrative · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 7976836
12 June 2024 Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7882603
15 February 2024 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7865843
19 January 2024 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7851469
12 December 2023 Administrative Inspection
Administrative · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 7837862
17 October 2023 MSP Initial Reflag · Initial Certification · MTSA/ISPS Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7804291
29 May 2023 PSC B · COC-CHEM & TVE Renew
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7699590
8 September 2022 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7554640
3 February 2022 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7390319
1 February 2022 COC-CHEM & TVE Renew · PSC B · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7388902
11 April 2021 COC-CHEM Annual · PSC B
Physical examination · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 7172389
3 February 2020 COC-CHEM Renew · Ballast Water Examination · PSC B
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6900618
2 February 2020 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6901742
2 February 2020 COE-Offshore
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7014333
13 April 2018 Ballast Water Examination · COC-CHEM & TVE Renew · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6383698
12 April 2018 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6390577

Deficiency record · 10

15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 25 July 2025 Resolved
The Company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the Company. In meeting these requirements, the Company should ensure that inspections are held at appropriate intervals; any non-conformity is reported, with its possible cause, if known; appropriate corrective action is taken; and records of these activities are maintained. The company Safety Management System does not have adequate process in place to track and verify compliance with statutory and classification requirements. During document review it was noted that: • There was an outstanding requirement for the full verification of Periodic Safety Test Procedures (PSTPs) by USCG and ABS from the reflag to be complete by the first drydock. No documentation demonstrating verification was provided to attending inspectors. Required corrective action: • Review and revise SMS to include procedures for monitoring all statutory requirements.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 14 August 2025
Resolution: Company provided evidence of SMS review and amendments made.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 25 July 2025 Resolved
The Company should identify equipment and technical systems the sudden operational failure of which may result in hazardous situations. The safety management system should provide for specific measures aimed at promoting the reliability of such equipment or systems. These measures should include the regular testing of stand-by arrangements and equipment or technical systems that are not in continuous use. During testing of safety equipment, it was found that the quick closing valve for the MDO Service Tank to FO Supply Pump was not closing properly. Required corrective actions: • Review and revise SMS routine maintenance procedures to include maintenance of quick closing valves.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 14 August 2025
Resolution: Company provided evidence of SMS review and amendments made.
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 25 July 2025 Resolved
The minimum instrumentation, alarms, and safety controls required for specific types of systems are listed in table 1 to § 62.35-50. The ABS Marine Vessel Rules (incorporated by reference; see § 62.05-2) required for engineering systems are also listed in table 1 to § 62.35-50. Vessel must have fully verified Periodic Safety Test Procedures (PSTPs) by USCG and/or ABS in order to maintain Periodically Unmanned Machinery Space (PUMS), otherwise vessel will have to sail with a fully manned engine room. PSTPs must be verified and submitted to ABS for approval by August 8th, 2025.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2025
Resolved 8 August 2025
Resolution: Company provided objective evidence of PSTPs being fully verified and submitted to ABS
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 25 July 2025 Resolved
Bilge high level alarms must be installed in each machinery space bilge and be arranged to sound an audible and visible alarm at a normally manned control station. During testing of high level bilge alarm in Bosun stores- Port no alarm was produced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 16 August 2025
Resolution: Repairs made. Report from C/E in Def Doc tab.
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 25 July 2025 Resolved
An audible and visual alarm shall be provided at the inert gas control panel for any failure in the inert gas system. The buzzer at the local panel was not reliably producing an audible alarm.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 16 September 2025
Resolution: Statement from CHENG with video clips of issue resolved
08 - Alarms › N/A - No Subsystem › Boiler alarm
Issued 25 July 2025 Resolved
Boilers must be equipped with instruments and controls necessary for safe operation. The composite boiler smoke indicator panel was found to be inoperative during testing.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 8 August 2025
Resolution: Unit was found offline. This was turned on, sensors cleaned and tested. Photo verification.
08 - Alarms › N/A - No Subsystem › UMS - alarms
Issued 25 July 2025 Resolved
Incinerators shall be designed and operated in a manner that ensures complete combustion and safe operation. The pressure sensor for combustion was found to be inoperative during inspection. Incinerator shall not be used until pressure sensor is fixed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 8 August 2025
Resolution: Air flow adjustment made. Alarm tested and functioning. Photo verification.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 25 July 2025 Resolved
Fire dampers must be capable of closing tightly and preventing the spread of fire and smoke. During inspection the 02 upper fire dampers in the funnel had a gap of approximately 3 inches between the louvers.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 8 August 2025
Resolution: Rust and paint resticting damper, rust removed. Photo verification.
08 - Alarms › N/A - No Subsystem › Boiler alarm
Issued 25 July 2025 Resolved
Boilers must be equipped with instruments and controls necessary for safe operation. During inspection the temperature switch for F.O. High Temp was alarming the "Low F.O. temp" alarm at the Composite Boiler Local Panel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2025
Resolved 16 August 2025
Resolution: Alarm repaired. Report from C/E uploaded to Def Doc tab.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 October 2023 Resolved
*See attached CG-835 dated 19OCT2023 in Documents section. *See attached updated CG-835 dated 17NOV2023 in def docs. *See attached updated CG-835 dated 03JAN2024 in def docs. *See attached updated CG-835 dated 05FEB2024 in def docs.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 November 2023
Resolved 6 December 2024
Resolution: Cleared deficiency and added remaining as worklist

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.