GENERAL MACARTHUR

GENERAL MACARTHUR is a 2019 industrial vessel. The Coast Guard has recorded 19 inspections since 2015, most recently in October 2025, along with 35 deficiencies and 4 casualty investigations between 2022 and 2023.

Records from 2015 to 2025. Most recent: inspection, 3 October 2025.

Built
2019
Last inspected
3 October 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 3 October 2025
…with no type recorded4
Operational controls None recorded without a removal date
Years with a record 7 calendar years (2015–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL4960
1377189
Flag
UNITED STATES
Maury page id
psix-1377189

Documentation record

Registered dimensions (L × B × D)278.3 ft × 72.0 ft × 16.0 ft
Registered tonnagegross 3,563 / net 3,563
ITC dimensions (L × B × D)278.3 ft × 72.0 ft × 16.0 ft
ITC tonnagegross 4,544 / net 1,363
BuilderC & C MARINE AND REPAIR LLC · BELLE CHASSE, LA, UNITED STATES · built 2019
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeShip
Hull configurationMonohull
Hailing portGALVESTON, TX
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 9 February 2026 · expires 31 March 2027
Service, as the file records itIndustrial Vessel
Hull formunknown (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1363 - Convention (Subpart B), Net Ton
3563 - Regulatory (Subpart C or D), Net Ton
4544 - Convention (Subpart B), Gross Ton
3563 - Regulatory (Subpart C or D), Gross Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

19 inspections, each with its date, unit and type; 35 deficiencies with the resolution recorded against each; 1 vessel inspected with it, by name and date; 4 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. A recreational or unclassed hull in the same activity is held and not published, so it does not appear here: these lists are a floor, not a complete manifest.

SEA OAK Towing Vessel · MISLE 885278 · 29 May 2023 · activity 7713033

Inspection history · 19

3 October 2025 Administrative Inspection · Appeal
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8246115
28 April 2025 Internal Structural Exam · Administrative Inspection · Deficiency Check · Underwater Inspection in lieu of Drydock · Hull Examination · COI Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 8121555
8 April 2024 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7891984
5 April 2024 Annual Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7890495
29 November 2023 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7831107
12 October 2023 Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7807375
29 June 2023 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7726725
27 June 2023 Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7724787
19 June 2023 Type not recorded
No type recorded · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 7861135
29 May 2023 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7713033
3 May 2023 Periodic Inspection · Administrative Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7681220
18 December 2022 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7613396
8 September 2022 Administrative Inspection
Administrative · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7554504
27 June 2022 In-Service Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7489242
27 June 2022 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7490916
6 June 2022 Administrative Inspection · Deficiency Check · Annual Inspection
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7470176
24 May 2021 Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7189827
16 July 2019 Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6850722
15 December 2015 Construction Oversight
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6679784

Deficiency record · 35

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 April 2025 Resolved
The inspection shall be such as to insure that the vessel, main and auxiliary machinery, electrical installations, is in satisfactory condition and fit for the service for which it is intended, and that it complies with the applicable regulations for such vessel. If any parts thereof are in bad condition, the fact shall immediately be reported to the master, owner or agent, and the Officer in Charge, Marine Inspection. The No. 3 Generator was tagged out undergoing repairs. Repair or replace to the satisfaction of the attending Marine Inspector. 46 CFR 91.25-10 46 CFR 97.15-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 12 May 2025
Resolution: Machinery team was able to perform required tests on GEN #3; all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Laundry
Issued 30 April 2025 Resolved
All crew spaces are to be constructed and arranged in a manner suitable to the purpose for which they are intended and so that they can be kept in a clean, workable, and sanitary condition. The laundry room washer drain is causing grey water to overflow into the hospital shower drain. Identify and repair / replace to the satisfaction of the attending Marine Inspector. 46 CFR 92.20-15
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 30 May 2025
Resolution: MSD & vent pipe was cleaned and unclogged; repaired broken aerator pipe; all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Cleanliness
Issued 30 April 2025 Resolved
It shall be the duty of the master and chief engineer to see that the vessel, and, in particular, the quarters are in a clean and sanitary condition. Hospital space was found to have a gallon-sized freezer bag filled with water covering the bowl drain; vapors from the MSD system are backflowing into the vessel toilet system for the hospital and crew accommodations. Identify and repair / replace to the satisfaction of the attending Marine Inspector. 46 CFR 97.15-10(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 30 May 2025
Resolution: MSD & vent pipe was cleaned and unclogged; repaired broken aerator pipe; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Danger areas
Issued 30 April 2025 Resolved
It shall be the duty of the master and chief engineer to see that the vessel, and, in particular, the quarters are in a clean and sanitary condition. Upon entering MSD space, a noticeable foul odor was present. Identify and repair / replace to the satisfaction of the attending Marine Inspector. 46 CFR 97.15-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 30 May 2025
Resolution: MSD & vent pipe was cleaned and unclogged; repaired broken aerator pipe; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 30 April 2025 Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. The tilt trim positioning pin on the outboard rescue boat motor broke during the man overboard drill. Repair or replace to the satisfaction of the attending Marine Inspector. 46 CFR 91.25-15 46 CFR 199.190(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 May 2025
Resolved 9 June 2025
Resolution: New tilt trim positioning pin installed; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 April 2025 Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. The outlet box in the cutter pumproom was not adequately protected from the environment and did not meet the standards outlined in 46 CFR 111.81-1(f). 46 CFR 91.25-30 46 CFR 111.01-1(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 11 May 2025
Resolution: New outlet cover installed; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 April 2025 Resolved
Electric installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. In the generator room, the condensation eliminator for an air receiver was temporarily attached to a flexible power cable leading to a wet bilge without adequate protection from moisture in accordance with 46 CFR 111.81-3(c). 46 CFR 91.25-30 46 CFR 111.01-1(a)(2)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 5 June 2025
Resolution: Added GFCI breaker to panelboard for the condensate eliminator; all sat.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 30 April 2025 Resolved
Every crewmember with emergency duties assigned on the muster list must be familiar with their assigned duties before the voyage begins. The crew were unfamiliar with the manual release procedures of the fixed fire extinguishing system as well as the assigned muster list duties for emergency response. Identify or implement training procedures and perform repeat drills to the satisfaction of the attending Marine Inspector. 46 CFR 97.15-35 46 CFR 199.180(b)(1)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 9 June 2025
Resolution: Ran fire/abandon ship drills; see narrative for MOB drill; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 30 April 2025 Resolved
At least one-half the total number of lifebuoys on the vessel must each be fitted with a self-igniting light. Multiple lifebuoy self-igniting lights had incorrect battery types. Repair or replace to the satisfaction of the attending Marine Inspector. 46 CFR 91.25-15 46 CFR 199.70(a)(3)(ii)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 9 June 2025
Resolution: Installed correct Energizer "AA" L91 batteries; all sat.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 April 2025 Resolved
Each panelboard must have a circuit directory that has the circuit designation of each circuit. The panelboards in the gym space did not have properly labeled circuit breakers. Identify to the satisfaction of the attending Marine Inspector. 46 CFR 90.25-1(a) 46 CFR 111.40-11(b)(2)(i)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 11 May 2025
Resolution: Gym panelboard labeled properly; all sat.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 30 April 2025 Resolved
The master of the vessel for which a load line certificate has been issued shall be responsible for the maintenance of such certificate on board such vessel and for compliance with its terms and conditions. The load line was obscured by fendering tires on the vessel’s hull, and the additional lines used with the load line were not marked in accordance with the requirements outlined in 46 CFR 42.13-30. The deck line was also not properly painted to contrast against the dark background as per 46 CFR 42.13-40. 46 CFR 42.09-1 (c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 May 2025
Resolved 17 June 2025
Resolution: Received photos showing load line corrected
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 30 April 2025 Resolved
In general, compliance with the standards established by the American Bureau of Shipping will be considered as satisfactory evidence of the structural efficiency of the vessel. The #12 manual ventilation gooseneck vent on the 02 level/deck near the lever room was held open by a wood block. Block was removed allowing free ability to close. Deficiency rectified. 46 CFR 92.01-10(a)
Action required: 10 - Deficiency Rectified
Resolved 30 April 2025
Resolution: Wooden block removed; all sat.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 30 April 2025 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. The A-60 fire door between the dry stores and galley was held back using a wire, creating a potential source of ignition and a larger area for a fire to develop. Deficiency rectified. 46 CFR 92.05-1(a)
Action required: 10 - Deficiency Rectified
Resolved 30 April 2025
Resolution: Wire removed from A-60 door; all sat.
07 - Fire Safety › N/A - No Subsystem › Fire control plan
Issued 25 April 2024 Resolved
Barges with sleeping accommodations for more than six persons...shall have permanently exhibited for the guidance of the officer in charge of the vessel the following plans: (a) General arrangement plans showing for each deck..the various sections enclosed by fire-resisting bulkheads. (c) The aforementioned information shall be kept up-to-date, any alteration being recorded in the applicable medium as soon as possible. Obtain fire rating approval & specifications for manual roll-up door, and update submit general arrangement / fire control plans and submit to MSC-3 for review (Project P020046). Ensure door is in the CLOSED position when galley is not Manned.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 25 June 2024
Resolved 30 April 2025
Resolution: General arrangement / fire control plans have been updated & reviewed. And fire rating & approval for roll-up door submitted.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 25 April 2024 Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as is reasonable and practicable. Outside goose-neck dryer vent closure was seized in the closed position; as a result, a dryer vent hose was found disconnected which spread lint into the overhead of the laundry space. Repair or replace to the satisfaction of the attending USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 7 May 2024
Resolution: Dryer vent hose connected & goose-neck closure corrected.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 25 April 2024 Resolved
The general emergency alarm system for a barge of 300 or more gross tons with sleeping accommodations for more than six persons must meet the requirements of Subpart 113.25. The general emergency alarm system must meet the marking requirements in 46 CFR 113.25-30 as required by 46 CFR 97.37-7(a). General alarm system throughout the vessel was not marked. Label in accordance with 46 CFR 97.37-7(a) to the satisfaction of the attending USCG Marine Inspector.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 7 May 2024
Resolution: General alarm labeled.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 25 April 2024 Resolved
All other piping systems shall be examined under working conditions as required by the marine inspector. Repair or replace the leaking valves in the #1 and #2 lube oil purifier piping to the satisfaction of the attending USCG Marine Inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 7 May 2024
Resolution: Valves replace.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 25 April 2024 Resolved
Bulkheads of galleys, paint and lamp lockers, and emergency generator rooms shall be of "A" Class construction. Galley Class "A" fire door from mess deck did not properly self-close. Repair or adjust to the satisfaction of the attending USCG Marine Inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 7 May 2024
Resolution: Galley class "A" door is properly self-closing.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 April 2024 Resolved
The installation of all systems of an electrical engineering or interior communication nature, together with the details of designed, construction, and installation, shall be in accordance with the requirements of subchapter J of this chapter. Cable transit system (Roxtec) installation for the emergency generator space was found improperly installed. Repair to the satisfaction of the attending USCG Marine Inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 9 May 2024
Resolved 7 May 2024
Resolution: Cable transit system repaired and properly installed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 18 May 2023 Resolved
Quick-acting Class I watertight doors fitted in accordance with the requirements in § 170.255(d) of this chapter must be marked “KEEP THIS DOOR CLOSED”. There is a hose going through watertight door (WTD) from MSD to Unit 2. Repair or replace to the satisfaction of US CG Marine Inspector.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 May 2023
Resolved 20 July 2023
Resolution: Hose removed from watertight door, creating a watertight boundary.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 May 2023 Resolved
Each bilge suction must lead from a manifold. As far as practicable, each manifold must be in, or be capable of remote operation from, the same space as the bilge pump that normally takes suction on that manifold. In either case, the manifold must be capable of being locally controlled from above the floorplates and must be easily accessible at all times. All bilge pump valves were closed. Repair or replace to the satisfaction of USCG Marine Inspector.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 18 May 2023
Resolved 18 May 2023
Resolution: Bilge suction valves were placed in the open postion; all sat.
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 18 May 2023 Resolved
The doors shall be of self-closing type. A-60 door between electrical room and ECR was not self closing. Repair or replace to the satisfaction of USCG Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 18 May 2023
Resolved 18 May 2023
Resolution: Adjustment made to self-closing A-60 door; all sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 18 May 2023 Resolved
Machinery…fuel-oil unit…and similar fuel-oil pumps must be fitted with remote controls from a readily accessible position outside the space concerned…may be stopped in case of fire in the compartment in which they are located. The controls must…be suitably marked. The following items were found not in compliance: 1) Remote E/R / Pump Rm & Elec Rm need to be labeled to specify S/D for equipment; 2) Starboard (STBD) F/O shutdowns are not operational & not labeled correctly; 3) Remote Engine / Pump room & Elec room were not labeled for specific equipment shutdowns. Repair/Label all equipment shutdowns to satisfaction of USCG Marine Inspector. Provide mitigation plan for STBD F/O shutdown
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 June 2023
Resolved 20 July 2023
Resolution: Shutdowns were properly labeled.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 May 2023 Resolved
At each inspection for certification and periodic inspection, the inspector shall examine the vessel to determine that it meets the vessel design and equipment requirements for pollution prevention in 33 CFR part 155, subpart B. Standard Discharge Connection not installed. Repair or replace to the satisfaction of USCG Marine Inspector.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2023
Resolved 1 December 2023
Resolution: Received correspondence that Standard discharge connection was installed during 2023 drydock.
14 - Pollution Prevention › 141 - MARPOL Annex I › Accidental oil outflow performance
Issued 27 June 2022 Resolved
In the event of an accident to a boiler, unfired pressure vessel, or machinery tending to render the further use of the item unsafe until repairs are made, or if by ordinary wear such items become unsafe, a report shall be made, by the chief engineer immediately to the Officer in Charge, Marine Inspections. Duty Marine Inspector receive report of a ruptured auxiliary hydraulic hose for the main cutter head unit which resulted in 20 gallons of hydraulic oil leak. Noted that the auxiliary hydraulic hose has been capped and is out of service to eliminate further leaking or pollution. Repair or replace auxiliary hydraulic hose to the satisfactory of an attending USCG Marine Inspector. - 46 CFR 97.30-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 July 2022
Resolved 29 June 2022
Resolution: Hose was replaced with the same material and rating as the original
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 8 June 2022 Resolved
Valves installed on the outside of [fuel] oil tanks must be arranged with a means of manual control locally at the valve and remotely from a readily accessible and safe location outside of the compartment in which the valves are located. Fuel supply line from 170 gal day fuel tank to the emergency generator has no means of remote closure. Install a means of remote closure that is readily accessible outside the emergency generator space to the satisfaction of a USCG marine inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 30 June 2022
Resolution: Vessel installed a remote fuel shutoff valve on EDG day tank.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boat inventory
Issued 24 May 2021 Resolved
The searchlights power source must be capable of operating the light without charging or recharging for not less than Three hours of continuous operation. And The searchlight’s power source must be connected to the searchlight using watertight electrical fittings. The searchlight was found inoperable due to dead battery and improper wire connections. Replace battery and wire connections.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2021
Resolved 9 June 2021
Resolution: Battery and connection were replaced by crew.
07 - Fire Safety › N/A - No Subsystem › Fire doors/openings in fire-resisting divisions
Issued 24 May 2021 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel’s firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Galley A-60 steel rolling fire door annual inspection was not performed IAW manufacturers. Furthermore, 2 A-60 self closing doors were found out of adjustment (mess-deck to galley / locker rm to outside) and one missing closing arm (ECC to electrical shop).
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2021
Resolved 9 June 2021
Resolution: All doors and were repaired and inspected by both crew and certified third party.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 May 2021 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel’s firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Galley A-60 steel rolling fire door annual inspection was not performed IAW manufacturers. Furthermore, 2 A-60 self closing doors were found out of adjustment (mess-deck to galley / locker rm to outside) and one missing closing arm (ECC to electrical shop). fixed fire extinguishing systems on board The conduct of these tests and inspections does not relieve the owner, master, or person in charge of his responsibility to maintain this firefighting equipment in proper condition at all times. Multiple CO2 bottle hoses were found loosely attached and in some cases, barely 2 threads holding. Third party company recently performed annual maintenance/testing. Provide new report of inspection by third party attesting to the verification of hose tightness and system integrity.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 7 June 2021
Resolved 9 June 2021
Resolution: Certified third party performed inspection and repairs of system and provided report.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 May 2021 Resolved
All emergency lights shall be marked with a letter ‘‘E’’ at least 1/2 inch high. Emergency lights throughout the vessel were found without required labeling.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2021
Resolved 9 June 2021
Resolution: Labels were placed on all identified lights.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 24 May 2021 Resolved
Programmable control or alarm system logic must not be altered after Design Verification testing without the approval of the cognizant Officer in Charge, Marine Inspection (OCMI). Bilge alarms were altered to a ten second delay on alarm panel. Ensure all vital alarms sound and display as designed and approved by manufacturer, USCG and ABS.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2021
Resolved 9 June 2021
Resolution: All alarms were reprogrammed to "0" time delay.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 May 2021 Resolved
The ring, lines and letters shall be painted in white or yellow on a dark ground or in black on a light ground. Repaint loadline markings.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 June 2021
Resolved 9 June 2021
Resolution: All markings were repainted.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 24 May 2021 Resolved
Approved portable fire extinguishers and semi-portable fire extinguishing systems must be installed in accordance with Table 95.50–10(a). Both paint lockers were found without required fire extinguishers.
Action required: 10 - Deficiency Rectified
Resolved 24 May 2021
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 24 May 2021 Resolved
It shall be the duty of the owner, master, or person in charge to see that the vessel’s firefighting equipment is at all times ready for use and that all such equipment required by the regulations in this subchapter is provided, maintained, and replaced as indicated. Emergency fire pump failed to gain suction in a timely manner due to air in the seachest. Furthermore the #3 fire nozzle was stuck in the closed position.
Action required: 10 - Deficiency Rectified
Resolved 24 May 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 May 2021 Resolved
Before the vessel leaves port and at all times during the voyage, each lifesaving appliance must be in working order and ready for immediate use. Found life ring lights with improperly installed batteries.
Action required: 10 - Deficiency Rectified
Resolved 24 May 2021

Casualty record · 4

27 June 2022Routine · role: Acknowledged Pollution Source · activity 7490916
18 December 2022Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 7613396
29 May 2023Routine · role: Moored/Anchored in Vicinity of Primary Subject · serious marine incident, as classified · 1 injured · activity 7713033
19 June 2023Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 7861135
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record