Inspection history · 25
26 January 2026
Administrative Inspection · Drydock Exam · Internal Structural Exam · Hull Examination · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8287394
18 September 2025
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8220483
31 October 2024
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8006224
24 January 2024
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7842009
12 September 2023
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7765136
11 October 2022
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7549595
9 October 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7577248
1 August 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7540828
20 January 2022
Internal Structural Exam · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7369326
30 July 2021
Internal Structural Exam · Examination of Repairs · DAPI Audit · Administrative Inspection · Deficiency Check · COI Inspection · In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7226020
12 May 2021
Type not recorded
No type recorded · USCGC CROCODILE (WPB 87369) · USCG East District (CGD-E) · Activity 7201974
15 January 2020
Examination of Repairs · Deficiency Check · Deadweight Survey · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6890590
15 January 2020
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6891404
21 November 2019
DAPI Audit · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6850611
18 July 2019
Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6754600
18 July 2019
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6758669
21 November 2018
DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6580572
18 November 2018
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6587822
19 June 2018
Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6441976
13 November 2017
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6305762
6 February 2017
Administrative Inspection · Special
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6084067
12 November 2016
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6039658
11 November 2016
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6046229
18 August 2016
DAPI Audit · Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5976383
4 March 2016
Deadweight Survey · Administrative Inspection · Construction Oversight
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 5827131
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 September 2025
Resolved
Electrical equipment on a vessel must be installed and maintained to protect from electrical hazards to include fire and electrical shock.
The automatic charge relay under the helm in the port storage box was not mounted and hanging by it wires. Properly mount the ACR to the satisfaction of the Coast Guard.
46CFR183.200
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 October 2025
Resolved 30 September 2025
Resolution: Vessel Rep has provided images. MI reviewed images of the ACR mounted to appropriatley underneath the console.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 18 September 2025
Resolved
A penetration in a watertight bulkhead must be as high/inboard as possible and be made watertight.
Port side middle hull compartment, port aft hull compartment and starboard mid hull compartment w/t bulkhead penetration is missing wire run sealant. Make this penetration watertight to the satisfaction of the Coast Guard.
46CFR179.320
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 October 2025
Resolved 30 September 2025
Resolution: Vessel Rep provided images. MI reviewed images of wire run bulkhead penetrations sealed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 18 September 2025
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its Certificate of Inspection giving consideration to provisions for a seaworthy hull.
Port and starboard deck inspections covers not sealed or mounted. Install sealant and mount the inspections covers to the satisfaction of the Coast Guard.
46CFR177.100
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 October 2025
Resolved 30 September 2025
Resolution: Vessel rep provided images. MI reviewed provided images of the deck inspection cover sealed and fastened to the deck.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to protect from electrical hazards to include fire and electrical shock.
Electrical breaker in the stbd aft compartment was not mounted and hanging by its wires. This exposed the energized connections. Properly mount the breaker to the satisfaction of the Coast Guard.
46 cfr 183.200
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2024
Resolved 8 November 2024
Resolution: Breaker has been properly mounted.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 31 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to protect from electrical hazards to include fire and electrical shock.
Electrical wires in the stbd and port aft compartments were cut leaving them loose. Remove all loose wires to the satisfaction of the Coast Guard.
46 cfr 183.200
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2024
Resolved 8 November 2024
Resolution: Loose electrical wires have been removed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 31 October 2024
Resolved
A penetration in a watertight bulkhead must be as high/inboard as possible and be made watertight.
Port side middle hull compartment, w/t bulkhead penetration is missing wire run sealant. Make this penetration watertight to the satisfaction of the Coast Guard.
46 cfr 179.320
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 14 November 2024
Resolved 8 November 2024
Resolution: Penetrations have been sealed and made watertight.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 January 2024
Resolved
MI observed that starboard Fire Boy bottle is corroded.
Have certified technician determine if bottle is still serviceable.
Code 705: Will be changed to a code 701 deficiency if not repaired prior to vessel being put back in the water.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 25 January 2024
Resolution: Certified technician verified bottle is still within specification.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 24 January 2024
Resolved
MI observed a disconnected vapor detection sensor wire in starboard fuel tank compartment.
Re-connect wire and test system.
Code 705: Will be changed to a code 701 deficiency if not repaired prior to vessel being put back in the water.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 25 January 2024
Resolution: Sensor and wire replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 24 January 2024
Resolved
MI observed dead end wires under console.
Determine that wires are not connected to power source and remove if not needed.
705: Must complete to receive dry dock credit.
Action required: 705 - Other - as specified
Due 24 January 2024
Resolved 25 January 2024
Resolution: Wires confirmed not needed and removed.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 12 September 2023
Resolved
The float-free link required by 180.130(a)(1) must be: (3) Secured to the painter on one end and to the vessel on the other end.
MI observed float-free link on vessel's life float was not attached to the vessel.
46 CFR 180.137(b)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2023
Resolved 25 September 2023
Resolution: Received images showing float-free link is attached to vessel and life float.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 12 September 2023
Resolved
Survival craft life lines and pendants must: (1) be of good quality and efficient for the purpose it is intended to serve.
MI observed survival craft life lines and pendants to be dry-rotted and severely deteriorated.
46 CFR 180.137(c)(2)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2023
Resolved 25 September 2023
Resolution: Vessel provided photographic proof of new survival craft life lines.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 12 September 2023
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve.
MI observed vessel's ring life buoy lifeline was dry-rotted and stored in severely deteriorated bag.
46 CFR 180.175(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 September 2023
Resolved 25 September 2023
Resolution: Vessel provided photographic proof of newly purchased ring life buoy bag.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 11 October 2022
Resolved
Each watertight bulkhead must be of sufficient strength to be capable of remaining watertight with a head of water to the top of the bulkhead.
MI found a pin hole leak in the starboard aft compartment located in the overhead of the compartment corner where the transom meets the deck and directly under an area that has free communication with the sea.
46 CFR 179.320(a)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 October 2022
Resolved 13 October 2022
Resolution: Hole was determined to be drilled by crew for drainage of water from void space. Detailed description in narrative.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 11 October 2022
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions.
First-aid kit on board the vessel did not have a tourniquet.
46 CFR 184.710
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 October 2022
Resolved 13 October 2022
Resolution: Tourniquet was purchased and placed into service in vessels First Aid Kit.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 11 October 2022
Resolved
The number of penetrations in a watertight bulkhead must be minimized. A penetration in a watertight bulkhead must be as high and as far inboard in the bulkhead as practicable, and made watertight.
MI found the cable runs did not have sufficient amount of packing to make a quality seal.
46 CFR 179.320(c)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 16 October 2022
Resolved 13 October 2022
Resolution: Packing sealant was installed into fire stops.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2021
Resolved
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation.
Port and starboard remote fuel shutoff valve stations were not found without markings.
46 CFR 185.608
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2021
Resolved 17 August 2021
Resolution: Remote fuel shutoff valves were found clearly marked IAW with regulations.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 6 August 2021
Resolved
A hatch exposed to weather must be watertight.
Observed fractures on the deck coaming for the #2 and #3 port side watertight deck hatches and on the #2 starboard side deck hatch. Fractures were found along the outer weld ring to the main deck on the port side #2 and #3 hatches; measuring approximately 6 inches in length. Arrest the fracture located at port side #2 and #3 deck hatch, crop fracture to sound metal with appropriate bevel, and tie weld into existing weld for repairs. Fractures were found on the coaming on the starboard side #2 deck hatch measuring approximately 4 inches in length. Arrest the fractures found on the coaming located at #2 starboard side hatch, crop the fracture to sound metal with appropriate bevel, tie into existing deck plate with weld.
46 CFR 179.360(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2021
Resolved 24 August 2021
Resolution: The fractured welds were cropped and renewed with acceptable filler metal. Weld profile found to be satisfactory. NDT completed with pressurized water on main deck; all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 6 August 2021
Resolved
Each vessel certificated to operate on an oceans route in warm water must either be provided with inflatable buoyant apparatus of an aggregate capacity that will accommodate at least 67% of the total number of persons permitted on board or be provided with lifefloats of an aggregate capacity that will accommodate at least 100% of the total number of persons permitted on board.
Vessel has a life float on board that has a total capacity of 25 persons.
46 CFR 180.202(b)
Action required: 10 - Deficiency Rectified
Due 6 August 2021
Resolved 6 August 2021
Resolution: COI reduced to permit vessel operations for 23 passengers and 2 crew.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 6 August 2021
Resolved
Each paddle must be of at least 4 feet in length, lashed to the life float to which it belongs and buoyant.
Paddles for life float were found sun damaged and fractured making them unusable in an emergency situation.
46 CFR 180.175(f)(2)
Action required: 10 - Deficiency Rectified
Due 6 August 2021
Resolved 6 August 2021
Resolution: The operator provided new four foot paddles during the inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 6 August 2021
Resolved
The floating water light for the life float must be attached around the body of the life float or buoyant apparatus by a 3/8 inch lanyard, resistant to deterioration from ultraviolet light, and at least 18 feet in length.
Lanyard for the floating light was found to be approx 3 feet in length. Operator to replace as per regulations.
46 CFR 180.175(f)(4
Action required: 10 - Deficiency Rectified
Due 6 August 2021
Resolved 6 August 2021
Resolution: The lanyard was replaced with an approved length and type by the operator during the inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 August 2021
Resolved
An adult life jacket must be provided for each person carried on board a vessel. In addition, a number of child size life jackets equal to at least 10% of the number of persons permitted on board must be provided.
11 adult life jackets were found holed/deteriorated and removed from service. 3 child lifejackets were found holed/deteriorated and removed from service.
46 CFR 180.71
Action required: 10 - Deficiency Rectified
Due 6 August 2021
Resolved 6 August 2021
Resolution: The operator purchased 11 new adult lifejackets and 3 new child lifejackets. The new lifejackets were labeled with the vessel name, outfitted with approved lights, and placed into service.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 August 2021
Resolved
Each life jacket must be marked with Type I retro-reflective material approved in 46 CFR 164.018.
13 adult lifejackets and 1 child life jacket were found with faded retro-reflective material.
46 CFR 185.604(h)
Action required: 10 - Deficiency Rectified
Due 6 August 2021
Resolved 6 August 2021
Resolution: The operator placed type I SOLAS retro-reflective material tape over the existing material and placed the lifejackets back into service.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 6 August 2021
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating station, emergency instructions containing the actions to be taken in the event of fire, heavy weather, or man overboard conditions.
The vessel does not have emergency instructions posted on board.
46 CFR 185.510(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2021
Resolved 17 August 2021
Resolution: Emergency instructions were created by the operator, placed onboard, and the crew were familiar with the procedures.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 6 August 2021
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space.
Vessel only has one portable light on board.
46 CFR 183.430
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2021
Resolved 17 August 2021
Resolution: Two new portable flashlights were found onboard and operational.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 August 2021
Resolved
A vessel of more than 26 feet in length but not more than 65 feet in length must carry a minimum of one life buoy of not less than 24 inches in diameter approved in accordance with 160.050 of subchapter Q.
MI found one ring life buoy faded in color and not in compliance with 160.050 of subchapter Q.
46 CFR 180.70(a)(2)
Action required: 10 - Deficiency Rectified
Due 6 August 2021
Resolved 6 August 2021
Resolution: The operator replaced the life buoy in kind during the inspection.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 31 July 2021
Resolved
Vessels must undergo an annual inspection within the 3 months before or after each anniversary date.
Vessel is 11 months past anniversary date. Conduct re-inspection prior to the carriage of passengers.
46 CFR 176.500
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 31 July 2021
Resolution: Conducted annual inspection per Sector St. [name withheld].
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 21 May 2020
Resolved
Vessel may operate on an exposed route with a reduced passenger count of 18 and 2 crew as requested in letter dated 21MAY2020 until receipt of new stability letter from MSC.
46CFR178.210
Action required: 705 - Other - as specified
Resolved 12 June 2020
Resolution: Vessel received updated stability letter from MSC.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 January 2020
Resolved
Provide operational test of the main propulsion system to the satisfaction of the Marine Inspector.
IAW: 46 CFR 182.200
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 May 2020
Resolution: Witnessed operational test of outboards and received request letter from operator to operate with reduce passenger count.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 July 2019
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended.
Vessel representative notified Sector St Petersburg Inspections office of an engine failure while in operation.
Repair or replace engine and make available for inspection by a Marine Inspector prior to departure.
46 CFR 182.100
Action required: 17 - Rectify deficiencies prior to departure
Due 1 August 2019
Resolved 19 July 2019
Resolution: Replaced starboard engine. Conducted successful re-power trial.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 21 November 2018
Resolved
Each EPIRB, other than an EPIRB in an inflatable liferaft, must be tested monthly and each test shall be logged or otherwise documented.
Provide EPRIB testing log. 46 CFR 185.728
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 December 2018
Resolved 13 December 2018
Resolution: operator created monthly EPIRB testing log.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 21 November 2018
Resolved
A hatch cover must have securing devices and be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss.
MI observed forward most hatch on starboard side missing securing device. Provide securing device. 46 CFR 179.360
Action required: 16 - Rectify deficiencies w/in 14 days
Due 5 December 2018
Resolved 13 December 2018
Resolution: Operator installed securing device on deck hatch.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 21 November 2018
Resolved
The number of persons capacity must be marked or painted in clearly legible letters and numbers on each life float and buoyant apparatus.
Life float did not have passenger capacity marking. 46 CFR 185.604 (e)
Action required: 10 - Deficiency Rectified
Resolved 21 November 2018
Resolution: Operator marked life float as required.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 21 November 2018
Resolved
The name of the vessel must be marked or painted in clearly legible letters on each life float paddle.
MI observed life float paddles without vessel name. 46 CFR 185.604 (g)
Action required: 10 - Deficiency Rectified
Resolved 21 November 2018
Resolution: Operator marked life float paddles with vessel name.
Engineering › Bilge Water Management System › Not Operational
Issued 20 November 2017
Resolved
Repair/replace starboard high level bilge alarm in # 8 compartment. 46CFR181.430
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2017
Resolution: HIgh bilge level alarm repaired to the satisfaction of the Marine Inspector.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 20 November 2017
Resolved
Repair/replace pre-engineered fixed fire system in starboard/port fuel tank space. Must have an audible/visual alarm present at the operating station. 46CFR181.420
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 November 2017
Resolution: Newly installed pre-engineered fixed fire systems have appropriate audible/visual alarms at the operating station to the satisfaction of the Marine Inspector.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 25 August 2016
Resolved
Install and prove proper operation of vapor detectors in both fuel tank spaces IAW 46CFR182.480(c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2016
Resolution: Installed vapor detectors and proved proper operation.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Number
Issued 25 August 2016
Resolved
Missing B-II fire extinguisher and provide servicing certificate for all extinguishers IAW 46CFR176.810
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2016
Resolution: Provided missing B-II and service certificates for all extinguishers.
Lifesaving › Rescue Boat › Embarkation/Disembarkation Capabilities
Issued 25 August 2016
Resolved
In lieu of rescue boat, install rescue platform suitable for MOB recovery and perform drills IAW 46CFR176.808(g)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2016
Resolution: Installed rescue platform and proved proper operation during drills.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 25 August 2016
Resolved
Install vent covers for fuel tank compartments IAW 46CFR181.420
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 September 2016
Resolution: Installed vent covers for fuel tank compartments.