Records from 2003 to 2026. Most recent: inspection, 17 February 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the tow units, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 29
17 February 2026
Deficiency Check · Administrative Inspection · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8303532
27 October 2025
In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8259217
27 October 2025
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8259779
21 May 2025
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8140871
12 May 2025
Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8133141
31 March 2025
Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 8102920
4 June 2024
In-Service Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7925769
25 May 2024
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7961047
7 May 2024
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7896376
9 May 2023
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7663725
1 February 2023
Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7614548
9 October 2022
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7577248
26 April 2022
Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7394598
8 June 2021
Type not recorded
No type recorded · USCGC BRANT (WPB 87348) · USCG Southeast District (CGD-SE) · Activity 7232134
23 April 2021
Damage Survey · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7183134
23 March 2021
Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7161428
22 March 2021
Damage Survey · In-Service Inspection · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7161213
25 February 2021
Administrative Inspection · DAPI Audit · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7134040
3 February 2021
Internal Structural Exam · Drydock Exam · Deficiency Check · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7121508
27 May 2020
Annual Inspection · Deficiency Check
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6949715
1 July 2019
Administrative Inspection · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6731921
21 May 2019
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6678036
21 February 2019
Drydock Exam · Administrative Inspection · Internal Structural Exam · Examination of Repairs
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6610649
16 June 2018
Type not recorded
No type recorded · USCGC PELICAN (WPB 87327) · USCG Heartland District (CGD-H) · Activity 6449310
23 May 2018
DAPI Audit · Examination of Repairs · Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6408895
11 May 2017
Deficiency Check · Annual Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6136976
2 March 2017
Internal Structural Exam · Administrative Inspection · Drydock Exam
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6097593
1 March 2017
Type not recorded
No type recorded · USCGC HAWK (WPB 87355) · USCG Heartland District (CGD-H) · Activity 6099419
24 February 2016
DAPI Audit · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 5820847
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 February 2026
Resolved
46 CFR 180.70(d)(1)
Each floating waterlight must be approved in accordance with § 161.010 in subchapter Q of this chapter, or other standard specified by the Commandant, including, but not limited to, approval series 160.110. MI observed expired batteries in 03 floating waterlights.
705c: Vessel restricted to daylight operations until waterlights are in compliance with their specification.
Action required: 705 - Other - as specified
Resolved 27 February 2026
Resolution: Reveived pictures of three ne CG approved floating waterlights.
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 17 February 2026
Resolved
46 CFR 184.502
47 CFR 80.903
Every vessel subject to Part III of Title III of the Communications Act must have a detailed inspection of the radio installation by an FCC-licensed technician in accordance with § 80.59 once every five years. If the ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony Certificate. MI observed incorrect call sign on certificate. Vessel shall provide valid Radiotelephony Certificate. 16 c
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2026
Resolved 3 March 2026
Resolution: Received picture of new radiotelephony certificate with call sign that matched station authorization and COI.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 17 February 2026
Resolved
33 CFR 83.30(b)
A vessel at anchor shall exhibit an all-round white light. MI observed failed all-round white light.
705c: Vessel restricted to daylight operations until anchor light is replaced.
Action required: 705 - Other - as specified
Resolved 27 February 2026
Resolution: Received picture of working anchor light.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 February 2026
Resolved
46 CFR 180.70(d)(2)
Each ring life buoy with a floating waterlight must have a lanyard of at least 910 millimeters (3 feet) in length, but not more than 1,830 millimeters (6 feet), securing the waterlight around the body of the ring life buoy. MI observed defective lanyard. Replace.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2026
Resolved 27 February 2026
Resolution: Received picture of new lanyard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 February 2026
Resolved
46 CFR 180.70(d)(3)
Each floating waterlight installed after March 11, 1997, on a vessel carrying only one ring buoy, must be attached to the lanyard with a corrosion-resistant clip.
MI observed corroded clip. Replace.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 March 2026
Resolved 27 February 2026
Resolution: Received picture of new clip.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 17 February 2026
Resolved
46 CFR 184.420(a)
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: U.S. Coast Pilot or similar publication, Coast Guard Light List, and Tide tables. MI observed expired light list and tables.
Action required: 10 - Deficiency Rectified
Resolved 17 February 2026
Resolution: Items replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 February 2026
Resolved
46 CFR 185.608
Remote fuel shutoff stations must be marked in clearly legible letters at least 25 millimeters (1 inch) high indicating purpose of the valve and direction of operation. MI observed no marking.
Action required: 10 - Deficiency Rectified
Resolved 17 February 2026
Resolution: Valves were marked.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 27 October 2025
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Vessel reported loss of main propulsion while operating with passengers on board. Vessel must determine cause of failure and make necessary repairs to satisfaction of USCG prior to carriage of passengers.
701c
46CFR 182.200(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 October 2025
Resolved 27 October 2025
Resolution: MI attended vessel this date to witness repairs on vessel and conduct sea trails to confirm machinery is operational. Refurbished fuel filter installed, fuel line cleaned and purged of debris. Operational test of propulsion and machinery, All SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 21 May 2025
Resolved
46 CFR 180.68; 701c
A vessel on a limited coastwise route must carry six hand red flare distress signals and six hand orange smoke distress signals. MI observed 02 flares missing from total required to be on board.
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 May 2025
Resolved 5 June 2025
Resolution: Reviewed photo of all flares onboard. All SAT.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 11 April 2025
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years. Vessel was due for drydock examination on 28FEB25 and has yet to receive a drydock exam.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 April 2025
Resolution: Credit DD/ISE completed.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 9 May 2023
Resolved
Gauges to indicate cooling water discharge temperature and lubricating oil pressure shall be provided for all propulsion engines and located so as to be in view of the operator.
MI observed inoperable lubricating oil pressure gauge at operating station.
46 CFR 182.15-5(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2023
Resolved 1 June 2023
Resolution: Vessel representative sent video of lube oil pressure gauge working properly.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 9 May 2023
Resolved
A power-driven vessel underway shall exhibit: a sternlight. MI observed inoperable sternlight.
Vessel is restricted to daylight operations until the sternlight is operational.
33 CFR 83.23(a)(iv)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 23 May 2023
Resolved 11 May 2023
Resolution: Vessel representative sent satisfactory photo of stern light being operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 April 2021
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The operator reported a marine casualty loss of propulsion while underway. The main engine is not operational. Make proper repairs to the main engine and contact USCG marine inspector for an inspection prior to carrying passengers. 46 CFR 182.200 (a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2021
Resolved 23 April 2021
Resolution: A faulty main engine starter was replaced in kind and the main engine was operationally tested in the presence of the attending MI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 23 April 2021
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Conductor from the battery switch to the main engine starter allegedly heated and melted due to a fault in the main engine starter. Replace main engine starter and conductor in kind. 46 CFR 183.200(b)
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2021
Resolved 23 April 2021
Resolution: The main engine starter and conductor from the battery switch to the starter were replaced in kind and operationally tested in the presence of the attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 April 2021
Resolved
The design of all exhaust systems must ensure minimum risk of injury to personnel. Exhaust gas must not leak from piping or any connections. MI identified a pin hole leak in the wet exhaust metal piping located in the engine compartment. 46 CFR 182.430
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 April 2021
Resolved 23 April 2021
Resolution: The operator cropped the hole in the piping and renewed with weld filament. The exhaust was operationally tested in the presence of the attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 March 2021
Resolved
The engine head, block, and exhaust manifold must be water-jacketed and cooled by water from a pump that operates whenever the engine is operating.
Vessels water pump failed while vessel was underway with passengers.
Vessel Rep replaced faulty pump in kind.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Resolved 22 March 2021
Resolution: Vessel Rep replaced faulty pump in kind.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 February 2021
Resolved
All cable and wire must...not be installed with sharp bends. Battery cable conduit was discovered with a sharp bend exposing wiring to battery installation.
46CFR183.340(b)(5)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 March 2021
Resolved 5 March 2021
Resolution: O/O forwarded a picture via e-mail rectifying deficiency.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 May 2020
Resolved
46 CFR 183.420. All vessels must have navigation
lights that are in compliance with the
applicable sections of the International
and Inland Navigation Rules.
Masthead light inoperable. Vessel is restricted to daylight operations until light is repaired.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 May 2020
Resolution: Masthead light repaired and operational.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 27 May 2020
Resolved
46 CFR 182.720 (e)(3)(ii) Flexible hose runs must be visible,
easily accessible, protected from mechanical damage. Hydraulic line servicing steering gear worn through wire braid. Replace hydraulic line.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 May 2020
Resolution: Hydraulic line replaced and rerouted.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 2 July 2019
Resolved
Vessel had a loss of steering on 30JUN19. Prior to operation, repair steering system and prove proper operation to the attedning marine inspector. 46 CFR 182.100
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 2 July 2019
Resolution: Vessel rep completed repairs on steering system, all test conducted by marine inspector sat.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 21 May 2019
Resolved
Except as allowed by paragraph (e) of this section, each vessel certificated to operate on a limited coastwise route in warm water must be provided with life floats of an aggregate capacity that will accommodate at least 50% of the total number of persons permitted on board.
One of the two 8 person life floats on board is no longer serviceable. The inside net of the life float was detached from the float due to deterioration. Total persons allowed is restricted to 16 people (02 crewmembers and 14 passengers) until the life float is replaced to the satisfaction of the attending marine inspector.
46 CFR 180.205(c)
46 CFR 185.700(a)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2019
Resolved 19 June 2019
Resolution: Marine inspector verified new life float purchased and installed properly.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 21 May 2019
Resolved
Each launching appliance and each survival craft and rescue boat on a vessel must be in good working order and ready for immediate use before the vessel leaves port and at all times when the vessel is underway.
The remaining 8 person life float not covered by deficiency #01 is nearing the end of its life with worn lines, discolored, and weak securing devices for the basket and pendants. Replace within two weeks.
46 CFR 185.700(a)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 4 June 2019
Resolved 19 June 2019
Resolution: Marine inspector verified new life float purchased and installed properly.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 21 May 2019
Resolved
The floating water light must be attached around the body of the life float by a 10 mm (3/8 inch) lanyard, resistant to deterioration from ultraviolet light, and at least 5.5 meters (18 feet) in length.
The lanyard on the water light was approximately only 12 feet long. Prior to the MI leaving the vessel, the lanyard was replaced with a 18 ft. long lanyard.
46 CFR 180.175(f)(4)
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 21 May 2019
Resolved 21 May 2019
Resolution: Corrected on the spot, lanyard was replaced with a 18 ft. long lanyard.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 May 2019
Resolved
In systems and applications where flexible hoses are permitted to be clamped: double hose clamping is required where practicable.
The hose clamps on the wet exhaust were not properly secured and leaking cooling water into the bilge. The operator repositioned the clamps and replaced a broken clamp prior to getting underway.
46 CFR 182.410 (d)(1)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 21 May 2019
Resolved 21 May 2019
Resolution: The operator repositioned the clamps and replaced a broken clamp.
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 23 May 2018
Resolved
07109 - Installed pre-engineered fixed gas fire extinguishing system is designed for automatic operation only and does not meet design requirements for manual actuation from outside the space. Replace system with approved type IAW 46 CFR 181.420(a).
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 May 2018
Resolution: Operator installed new bottle and manual pull cable meeting requirements. Completed satisfactory test of system.
Fire Fighting › Fixed Fire Detection System › Alarms
Issued 11 May 2017
Resolved
Pre-engineered fire extinguishing system audible alarm doesn't work, proveoperation to attending marine inspector iaw 46CFR181.420(b)(2).
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2017
Resolved 19 May 2017
Resolution: Vessel has new electrical component of Fire boy system installed, test satisfactory.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 11 May 2017
Resolved
Replace labels for PFD storage in accordance with 46CFR185.604(F).
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 19 May 2017
Resolution: New labels installed.
Lifesaving › Lifefloat › Painter
Issued 11 May 2017
Resolved
Provide and install proper painter (100 ft) to life float to the satisfaction of the attending marine inspector iaw 46CFR180.175(F)(3)(i).
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2017
Resolved 19 May 2017
Resolution: 100 ft painter line installed with line attaching both life floats.
Communications › Radio Communications › VHF Radiotelephone
Issued 11 May 2017
Resolved
MMSI # must be entered in VHF-FM radio iaw 47CFR80.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 26 May 2017
Resolved 19 May 2017
Resolution: Proved installation of MMSI number in VHF-FM radio.
Construction/Loadline › Hull › Keel
Issued 6 March 2017
Resolved
Replace all caulking around skeg. 46CFR176.610
Due 6 March 2017
Resolved 6 March 2017
Resolution: Gap between hull and skeg properly sealed.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 2 March 2017
Resolved
Complete credited hull inspection and internal structural exam to the satisfaction of attending MI per 46CFR176.600.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2017
Resolution: Conducted credit dry-dock/ISE.