Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Towing Vessel class in Maury's sources begin in 1980.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)112.6 ft × 34.4 ft × 15.7 ft
Registered tonnagegross 391 / net 265
ITC dimensions (L × B × D)112.6 ft × 34.4 ft × 15.7 ft
ITC tonnagegross 455 / net 136
BuilderCONRAD SHIPYARD LLC · MORGAN CITY, LA, UNITED STATES · built 2018
Hull materialSteel
PropulsionDiesel Direct
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portHILO, HI
Endorsements, as the file codes themcw_un, reg
DocumentationValid · issued 5 May 2026 · expires 30 June 2027
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it455 - Convention (Subpart B), Gross Ton 391 - Regulatory (Subpart C or D), Gross Ton 136 - Convention (Subpart B), Net Ton 265 - Regulatory (Subpart C or D), Net Ton 315 - Dead Weight, Metric Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 26 inspections, each with its date, unit and type; 10 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; 2 other vessels inspected with it; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 June 2024Resolved
(a) Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm setpoints, the procedure to be followed, and the expected test result. PSTPs must be updated with new engine room configuration and sent to MSC for approval. Vessel's PSTP are not up to date.
Condition: Invalid
Action required: 705 - Other - as specified
Due 17 September 2024
Resolved 12 July 2025
Resolution: Tested previously, all sat.
Certificates of inspection will be issued for a period of 5 years. Application may be made by the master, owner, or agent for inspection and issuance of a new certificate of inspection at any time during the period of validity of the current certificate. Vessel is currently in dry dock. Vessel's COI is expired. Needs to submit an Application of Inspection and conduct Inspection prior to conducting commercial operations.
46 CFR 91.01-10
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 4 January 2024
Resolved 17 July 2024
Resolution: Completed COI renewal.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 December 2022Resolved
The material, design, construction, workmanship, and arrangement of main propulsion machinery and of each auxiliary, directly connected to the engine and supplied as such, must be at least equivalent to the standards established by the ABS Steel Vessel Rules. Vessel loss propulsion to the engines and generators while underway. Submit repair plan proposal to the satisfaction of Sector Honolulu Inspections.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 December 2022
Resolved 31 December 2022
Resolution: Witness satisfactory repair to hull, main engines and ships service generators.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 10 January 2022Resolved
The VSO must ensure that at least one security drill is conducted at least every 3 months.
Vessel security drills were being conducted on a quarterly basis. This allowed for the most recent drills to take place more than 3 months apart.
33 CFR 104.230(b)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 January 2022
Resolved 11 January 2022
Resolution: Security drill log received dated 11JAN2022. This drill meets the requirement for a drill every 3 months.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › UMS - Ship
Issued 10 January 2022Resolved
Test procedure documents must be in a step-by-step or checkoff list format. Each test instruction must specify equipment status, apparatus necessary to perform the tests, safety precautions, safety control and alarm set points, the procedure to be followed, and the expected test result. Test procedure used for generator high temp shut down speed is not the approved PSTP as described in Appendix 1-2 - CAT Analog Temperature Sensor Test Procedure, A2.4.5. Current test utilizes a dry well calibrator "Hot Box." Add to Specialized Test Equipment as A2.1.1. Submit updated PSTP to MSC for approval and provide documentation to the attending MI.
46 CFR 61.40-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 February 2023
Resolved 17 July 2024
Resolution: Vessel has made changes to engineroom system. Will need to resubmit PSTPs to MSC.
Single hull vessels that operate in salt water must complete drydock and internal structural examinations twice every five years with no more than three years between any two examinations. The vessel's drydock and internal structural examination were due no later than 30NOV2021. Vessel is restricted from operating until successful review of ABS drydock records and completion of internal structural examination by the attending marine inspector.
46 CFR 91.40-3
Action required: 17 - Rectify deficiencies prior to departure
Due 3 December 2021
Resolved 8 December 2021
Resolution: Drydock records review completed; sat. ISE completed; sat.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 15 January 2020Resolved
Each system protecting a space with greater than 6,000 cubic feet gross volume must have a pneumatic pre-discharge time delay. The time delay device must be pneumatically operated and have an accuracy of -0/+20 percent of the rated time delay period throughout the operation temperature range and range of delay settings. Vessel has a 34 second time delay installed. Maximum allowable time for discharge would be 40.8 seconds. During operational test, time delay discharged at 44 seconds. Prove proper operation of time delay to attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 January 2020
Resolved 23 January 2020
Resolution: Witnessed satifactory test of new time delay.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 15 January 2020Resolved
Persons designated by the owner of the vessel shall conduct all tests and the Design Verification and Periodic Safety tests shall be witnessed by the Coast Guard. Engineering staff on board did not show complete knowledge of Periodic Safety Test Procedures (PSTPs). In accordance with vessel's approved PSTPs, engineers on board shall have knowledge and be able to conduct all tests. Shipboard engineering staff shall provide working knowledge of PSTPs to the satisfaction to the attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2020
Resolved 23 January 2020
Resolution: Port engineer elects to have servicing tech present when demonstrating certain PSTPs, verified in PSTP manual.
04 - Emergency Systems › N/A - No Subsystem › Means of communication between safety centre and other control stations
Issued 15 January 2020Resolved
Each vessel must be provided with a sound-powered telephone system, complying with subpart 113.30 of this chapter, to communicate between the pilothouse and the steering-gear compartment. Demonstrate proper operation of the sound-powered phone to the attending marine inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 February 2020
Resolved 23 January 2020
Resolution: Verified proper operation of sound powered phones.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 15 August 2019Resolved
A vessel equipped with fixed pitch or controllable pitch propellers must have on the navigating bridge and at the engineroom control station a propeller speed and direction indicator or a propeller speed and pitch indicator for each shaft. Vessel was not constructed with shaft speed and thrust indicators IAW 46 CFR 113.37.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 September 2019
Resolved 26 December 2019
Resolution: Witnessed satisfactory testing of both port and stbd shaft tachometers.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.