MAURY USCG vessel records
← All vessels

JACK SPERRY

Built
2020
Last inspected
29 June 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.

Inspection record

Last inspected 29 June 2026
…with no type recorded4
Operational controls None recorded without a removal date
Years with a record 4 calendar years (2021–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDL8621
1432191
Flag
UNITED STATES
Tonnage
142 - Simplified, Net Ton 177 - Simplified, Gross Ton
Maury page id
psix-1432191
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

The Coast Guard recorded this vessel and the following in the same inspection activity — normally a tug and the barges in its tow. Only barges and towing vessels are in this archive, so any other vessel type in the same activity does not appear here: these lists are a floor, not a complete manifest.

MGI 2721 Tank Barge · MISLE 983825 · 16 June 2022 · activity 7483130

Inspection history · 6

29 June 2026 Type not recorded
No type recorded · Station Sabine · USCG Heartland District (CGD-H) · Activity 8420882
24 December 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8083665
17 December 2024 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8150823
5 April 2024 In-Service Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7890467
16 June 2022 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 7483130
13 July 2021 Administrative Inspection · Initial Certification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7255237

Deficiency record · 2

07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 April 2024 Resolved
Means must be provided for stopping each fan in a ventilation system serving machinery spaces and for closing, in case of fire, each doorway, ventilator, and annular space around funnels and other openings into such spaces. Ventilation closures for both Main Diesel Engine air intakes were inoperable/malfunctioning at the time of CG inspector attendance. Repair to the satisfaction of the USCG and TPO
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 18 April 2024
Resolved 19 April 2024
Resolution: ABS attended VSL, vsl representative submitted report following findings and rectification to satisfaction of TPO. USCG satisfied through objective evidence that deficiency is rectified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 April 2024 Resolved
There must be an installed or portable bilge pump for emergency dewatering. Any portable pump must have sufficient hose length and pumping capability. All installed bilge piping must have a check/foot valve in each bilge suction that prevents unintended backflooding through bilge piping. CG Inspectors found active leaking on both shaft seals, corroding on overboard discharge piping on both installed piping systems for overboard discharge from shaft seals. STBD side is pumped on an hourly basis. Company was notified in 2023 of issue. Not noted on ABS Annual survey in 2023; Company fix was use of syntho-glass on affected piping- however, continued corrosion in extended sections increases likelihood of flooding in engine room due to backflooding through overboard discharge piping. Repair to the satisfaction of the USCG and TPO
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 April 2024
Resolved 30 April 2024
Resolution: Bilge piping has been replaced.

Source. US Coast Guard records through 23 August 2026, retrieved 5 September 2026. Vessels the Coast Guard classes as Barge or Towing Vessel. Coverage and known gaps.

Maury does not score, rate, or grade vessels. What Maury does not do · Glossary · Correct a record.