Records from 2017 to 2026. Most recent: inspection, 12 May 2026.
Documentation record
Registered dimensions (L × B × D)381.7 ft × 96.0 ft × 28.0 ft
Registered tonnagegross 9,669 / net 9,669
ITC dimensions (L × B × D)381.7 ft × 96.0 ft × 28.0 ft
ITC tonnagegross 8,522 / net 5,304
BuilderGUNDERSON MARINE LLC · PORTLAND, OR, UNITED STATES · built 2018
Hull materialSteel
PropulsionNone
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portVALDEZ, AK
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 27 March 2026 · expires 30 April 2027
Service, as the file records itOil Recovery
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it8522 - Convention (Subpart B), Gross Ton
9669 - Regulatory (Subpart C or D), Gross Ton
5304 - Convention (Subpart B), Net Ton
9669 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 28
12 May 2026
Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8371168
26 March 2026
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8369532
10 February 2026
Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 8309116
2 February 2026
Administrative Inspection
Administrative · USCG Arctic District (dp) · USCG Arctic District (CGD-A) · Activity 8305066
3 February 2025
Periodic Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8074133
2 January 2025
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 8056868
14 March 2024
MTSA Verification · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7879821
11 December 2023
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7839654
18 May 2023
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7691779
5 April 2023
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7663585
8 March 2023
Internal Structural Exam · COI Inspection · Underwater Inspection in lieu of Drydock
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7644451
20 July 2022
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7536317
2 June 2022
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7467512
2 June 2022
Deficiency Check
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7476451
5 May 2022
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7444919
17 February 2022
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7398128
15 November 2021
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7352805
5 May 2021
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7190066
9 March 2021
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7153918
14 January 2021
Underwater Inspection in lieu of Drydock
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7134380
14 December 2020
Construction Oversight
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7120624
24 September 2020
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7131316
15 July 2020
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 7019220
16 May 2019
Annual Inspection
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6698741
17 April 2019
Administrative Inspection
Administrative · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6838836
2 October 2018
Construction Oversight
Physical examination · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6651332
29 June 2018
Type not recorded
No type recorded · Marine Safety Unit Valdez · USCG Arctic District (CGD-A) · Activity 6461327
8 September 2017
Initial Certification · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6344332
11 - Life Saving Appliances › N/A - No Subsystem › Embarkation arrangement survival craft
Issued 12 May 2026
Resolved
Each muster station and embarkation station must be adequately illuminated by lighting with power supplied from the vessel's emergency source of electrical power. MI observed the embarkation lighting for the liferafts on both port and starboard side to have the switch mechanism missing within the switch assembly due to excessive corrosion. Switches are located within the hazardous area and to be locked out tagged out. Vessel may utilize portable rechargeable magnetic lights until new switches are installed to the satisfaction of attending MI.
46CFR31.36-1
46CFR199.110(c)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2026
Resolved 9 July 2026
Resolution: ABS sent report attesting to repairs
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 12 May 2026
Resolved
Boilers, main and auxiliary machinery, and piping systems shall conform to the requirements of subchapter F (Marine Engineering). Emergency stop switch located outside the machinery space for all three diesel generators worked intermittently when tested. Repair/replace to satisfaction of attending MI.
46CFR32.35-1
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 12 June 2026
Resolved 15 May 2026
Resolution: Received emailed video from vessel rep showing operation of diesel generator's emergency stop operating from outside the machinery space.
01 - Certificates & Documentation › 013 - Documents › Stability Information Booklet
Issued 5 April 2023
Resolved
Sub-Chapter S requires every vessel to have a stability letter. The vessel has been found to be operating outside the parameters of their stability letter. Vessel shall remove ballast or have a new stability letter issued. 46CFR31.10-3
46CFR170.120
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2023
Resolved 11 December 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 5 May 2022
Resolved
The cargo handling equipment shall be maintained by the tank vessel's personnel in accordance with the regulations in this subchapter, including the following:
Cargo pump pressure gauge shall be tested at least once a year for accuracy. Gauge not tested annually. Test gauge. 46 CFR 35.35-70(c)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 20 July 2022
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 5 May 2022
Resolved
Each hose assembly used for transferring oil or hazardous material must meet the following requirements:
The hose burst pressure and the pressure used for the test required by 33 CFR 156.170 must not be marked on the hose and must be recorded elsewhere at the facility as described in paragraph (f) of this section. Test pressure recorded on hoses. Remove test pressure. 33 CFR 154.500(g)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 19 May 2022
Resolved 17 May 2022
Resolution: Test Pressures inscription on hoses removed from all hose assemblies.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 5 May 2022
Resolved
Each fall used in a launching appliance must be turned end-for-end at intervals of not more than 30 months or be renewed at intervals of not more than 4 years. Current rescue boat falls have not been renewed, renew falls. 46 CFR 199.190(j)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 May 2022
Resolved 2 June 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 15 July 2020
Resolved
Barge has a sea chest and sea valve in #2 void. After installation of a snow removal system, vessel should have meet the requirements of 46 CFR 56.50-55, but did not. Provide approved plans and followed by installation of a bilge pump prior to operation of the snow removal system.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 11 December 2023
Operations/Management › Drills/Instruction › Fire
Issued 24 April 2018
Resolved
Conduct satisfactory fire and abandon ship drill.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 May 2018
Resolved 23 May 2018
Personnel › Certificates/Documents/Licenses › PIC (barge)
Issued 24 April 2018
Resolved
Provide documentation of sufficient manning IAW COI.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 May 2018
Resolved 23 May 2018
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 24 April 2018
Resolved
Prove proper operaton of ground detection system.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 May 2018
Resolved 23 May 2018
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 24 April 2018
Resolved
Provide all equipment on fire contol plan including immersion suits in command console, flares, line throwing appliances, fire fighting suit, fire axe, SCBA, etc.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 May 2018
Resolved 23 May 2018
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 24 April 2018
Resolved
Mount fire control plan and all required placards (life jacket/immersion suit donning, life raft launching, rescue boat launching, EPIRB instructions, muster list, etc).
Action required: 17 - Rectify deficiencies prior to departure
Due 24 April 2018
Resolved 23 May 2018
Pollution Prevention/Response › Response Equipment › Containers
Issued 24 April 2018
Resolved
Provide SOPEP equipment.
Action required: 17 - Rectify deficiencies prior to departure
Due 24 May 2018
Resolved 23 May 2018