Inspection history · 41
29 April 2026
Deficiency Check · Drydock Extension · Internal Structural Exam · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8358383
20 March 2026
Administrative Inspection · Annual Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8329040
22 August 2025
Damage Survey
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8215520
31 July 2025
MTSA Verification
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8199014
21 February 2025
Annual Inspection · Deficiency Check · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8082353
21 November 2024
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 8037930
20 August 2024
Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7985085
20 August 2024
Internal Structural Exam · Administrative Inspection · In-Service Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7985089
8 August 2024
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7980929
13 March 2024
Administrative Inspection · Drydock Extension
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7878119
29 February 2024
COI Inspection · Administrative Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7872491
20 October 2023
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7811540
15 September 2023
Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7791925
23 June 2023
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7721406
10 May 2023
Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7684971
24 June 2022
Annual Inspection · Administrative Inspection
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7485629
14 July 2021
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7256517
23 April 2021
Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7181094
24 February 2021
In-Service Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 7145825
13 January 2021
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7123642
7 January 2021
Administrative Inspection · Drydock Extension
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7120767
30 September 2020
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7839336
3 August 2020
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7023362
15 July 2020
Administrative Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 7006736
6 July 2020
Annual Inspection
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6998902
9 March 2020
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6923647
14 November 2019
Administrative Inspection · Examination of Repairs
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6855308
30 July 2019
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6766908
12 July 2019
Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6746814
29 May 2019
Administrative Inspection
Administrative · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6697545
8 May 2019
Administrative Inspection
Administrative · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6680065
18 March 2019
Deficiency Check · Administrative Inspection · Initial Certification
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6644067
31 January 2019
Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6618307
23 January 2019
Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6613796
6 December 2018
Damage Survey · Examination of Repairs
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6593926
26 June 2018
Uninspected Other
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6474876
9 January 2018
Damage Survey
Physical examination · Marine Safety Unit Saipan · USCG Oceania District (CGD-O) · Activity 6335206
21 August 2017
Type not recorded
No type recorded · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6247038
21 August 2017
In-Service Inspection · Deficiency Check
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6247917
7 July 2017
Uninspected Other
Physical examination · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 6206215
28 June 2017
Administration · Deficiency Check · Industry Initiated Exam
Physical examination · U.S. COAST GUARD FORCES MICRONESIA/SECTOR GUAM · USCG Oceania District (CGD-O) · Activity 6180975
03 - Water/Weathertight Conditions › N/A - No Subsystem › Machinery space openings
Issued 4 May 2026
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. Forward deck hatch, acting as an escape hatch for engine room, found with wasted hinges rendering hatch inoperable and unable to completely seal. Approval of drydock extension pends approval of repair and operational testing of deck hatch.
46 CFRR 144.320(b) - 17 c.
Action required: 17 - Rectify deficiencies prior to departure
Due 4 May 2026
Resolved 5 May 2026
Resolution: Accepted objective evidence in form of video and photos of new welded hinges and proof of hatch closure. Objective evidence attached to deficiency documents.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 7 April 2026
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover.
Starboard day tank remote fuel shutoff and 3 other tank remote fuel shutoff on port side did not activate when tested. Repair as needed to satisfaction of MI.
46 CFR 143.260(b)
17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2026
Resolution: Quick closing valves were tested again satisfactory.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 7 April 2026
Resolved
Each towing vessel must be arranged so that the following essential loads can be energized from two independent sources of electricity.
Bridge's emergency battery are dead. Replace in kind to satisfaction of MI.
46 CFR 143.555(b)(8)
17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 April 2026
Resolution: New batteries installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 7 April 2026
Resolved
The following systems must be equipped with gauges at the machinery location: Auxiliary generator engine lubricating oil pressure and auxiliary generator engine RPM; Auxiliary generator engine cooling water temperature. Local gauges for RPM, L/O pressure, and water temp found inoperable for all three ship service diesel generators.
46 CFR 143.230(c)(3) & (4)
50c
Action required: 50 - Rectify deficiencies w/in 30 days
Due 7 May 2026
Resolved 18 May 2026
Resolution: Local gauges replaced on No.1 and No.3 SSDGs and tested on 05May, gauges repaired and tested on No.2 SSDG on 18May26, tested in presence of attending MI. All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 August 2025
Resolved
Propulsion machinery, including main engines, reduction gears, shafting, bearings, and electrical equipment and systems, must:(1) Be maintained to ensure proper operation;(2) Be suitable for route and service; and(3) Have suitable propulsion controls to provide the operator full control at each operating station. Vessel experienced loss of propulsion while underway on port engine due to governor failure. Repairs were made and vessel conducted satisfactory sea trials in presence of attending Marine Inspector. Deficiency cleared.
Action required: 17 - Rectify deficiencies prior to departure
Due 22 August 2025
Resolved 22 August 2025
Resolution: PDO duty MI attended vessel to conduct sea trials. Governor control arm found repaired and welded. Tested satisfgactory u/w at approx 600rpm. New threaded control arm on order.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 27 March 2025
Resolved
The following systems must be equipped with gauges at the machinery location: Auxiliary generator engine lubricating oil pressure and auxiliary generator engine RPM; Auxiliary generator engine cooling water temperature. No.1 SSDG found with unsecured electrical control box and lube oil and cooling water gauges missing and removed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2025
Resolved 22 April 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 27 March 2025
Resolved
The crew of each towing vessel must demonstrate the ability to operate the primary and auxiliary machinery and electrical systems for which they are responsible, and to do so under normal and emergency conditions. At the time of the inspection, the crew could not demonstrate operation of the bilge pump and discharge arrangement.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2025
Resolved 22 April 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Ventilators, air pipes, casings
Issued 27 March 2025
Resolved
Closure devices must be provided for deckhouse or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. Deck vent was missing multiple fasteners.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2025
Resolved 22 April 2025
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 March 2025
Resolved
For each vessel, the vessel owner or operator must: Ensure that vessel access, including the embarkation of persons and their effects, is controlled.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2025
Resolved 22 April 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 27 March 2025
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The following alarms must be provided: Auxiliary generator engine low lubricating oil pressure; Auxiliary generator engine high cooling water temperature. Lube oil pressure and cooling water temperature alarms found inoperable on no.1, no.2, and no.3 SSDGs.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 1 April 2025
Resolution: Attended and inspected low L/O pressure and high cooling water temp alartms and shutdowns on no.2 and no.3 SSDGs. Alarms sounded at local control panel and ECR panel. All sat.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 March 2025
Resolved
To stop the flow of fuel in the event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted on any fuel line that supplies fuel directly to a propulsion engine or generator prime mover. The fuel shutoff valve must be operable from a safe place outside the space where the valve is installed. All fuel shutoff valves for port and stbd side found seized and inoperable.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 28 March 2025
Resolution: Attended vessel and tested all valves from outside the space, witnessed direct closure of all 10 spring valves in engine room, all sat.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 27 March 2025
Resolved
Each vessel must be designed and constructed to minimize fire hazards insofar as reasonable and practicable. Port side Co2 closure on the upper deck does not fully seal as required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 April 2025
Resolved 22 April 2025
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 7 March 2024
No resolution recorded
Each vessel must be designed and constructed to minimize fire hazards insofar as reasonable and practicable. Prove the integrity of the A-60 boundary deck passageway from the aft watertight door to the mess deck entrance during vessels next dry docking.
Action required: 705 - Other - as specified
Due 30 July 2024 — due date passed with no resolution recorded
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 7 March 2024
Resolved
Closure devices must be provided for deck house or hull penetrations, which open to the exterior of the vessel and which may allow water to enter the vessel. These devices must be suitable for the expected route. The aft watertight door port light cover is not installed as required.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2024
Resolved 25 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 7 March 2024
Resolved
The following systems must be equipped with gauges at the machinery location. The local gauges for both main engines listed below are inoperable.
1. Port main engine’s engine control air psi, salt water psi, charge air psi, and fuel oil psi.
2. Stbd main engine’s engine charge air psi
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2024
Resolved 8 August 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 March 2024
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. The potable water pump’s grounding cable is not properly grounded.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2024
Resolved 25 June 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 March 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under normal and emergency conditions. Replace all (9) severely cracked engine room light fixture covers.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2024
Resolved 22 October 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 March 2024
Resolved
To stop the flow of fuel in an event of a fire or break in the fuel line, a remote fuel shutoff valve must be fitted and must be operable from a safe place outside the space where the valve is installed. The remote shut off valves for the #3 generator fuel day tank, port fuel suction, and port main engine supply is seized and inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2024
Resolved 22 October 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 7 March 2024
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under normal and emergency conditions. The engine room’s fire station isolation valve is leaking by when closed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 March 2024
Resolved 22 October 2024
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 July 2023
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards.
The over speed alarm was found inoperable on generators #1 and #2. The #1 generator was also found with an inoperable remote switch for the governor at the switchboard. The vessel is permitted to transit to Guam for repairs. An engineer is required to maintain a watch on the #2 generator if it is used for this voyage in transit to Guam. Contact USCG Sector Guam for a re-inspection once repairs are completed on the generators. The vessel is not permitted to make the return voyage back to Saipan until repairs are verified by an attending USCG marine inspector in Guam.
46 CFR 143.400(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 August 2023
Resolved 28 July 2023
Resolution: Witnessed satisfactory tests.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 23 June 2023
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space and must be either:
(1) Automatic, battery-operated with a duration of no less than 2 hours; or
(2) Non-electric, phosphorescent adhesive lighting strips that are installed along escape routes and sufficiently visible to enable egress with no power.
The light in the head next to the galley is missing a bulb. -Some of the E-lights are too dimmed to see, replace the light bulb or replace the light covering so the light can illuminate the spaces better during an emergency.
46 CFR 143.410
Action required: 705 - Other - as specified
Due 23 July 2023
Resolved 26 June 2023
Resolution: MI verified all emergency lighting is operational.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 June 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The overspeed and reverse power relays for the number 1 and number 2 generators were found inoperable.
46 CFR 143.205
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 July 2023
Resolved 25 July 2023
Resolution: The generators were tested and a new CG-835 was issued.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 June 2023
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons onboard under normal and emergency conditions. The number 3 generator is not operational. Prove proper operation prior to placing into service.
46 CFR 143.205
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 July 2023
Resolved 25 July 2023
Resolution: The generators were tested and a new CG-835 was issued.
10 - Safety of Navigation › N/A - No Subsystem › Bridge Navigation Watch Alarm System (BNWAS)
Issued 23 June 2023
Resolved
Except as provided in paragraph (d) or (e) of this section, a towing vessel with overnight accommodations and alternating watches (shift work), when pulling, pushing or hauling alongside one or more barges, must have a system to detect when its master or mate (pilot) becomes incapacitated.
The BNWAS was found inoperable at the time of the inspection.
46 CFR 143.450
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 July 2023
Resolved 15 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 10 May 2023
Resolved
Propulsion machinery must be maintained to ensure proper operations. Lubrication oil in port propulsion engine was found to be contaminated with water. Conduct repairs IAW engine manufacture procedure and with in-kind parts prior to engaged in towing operations.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 19 May 2023
Resolution: Attended vessel and completed satisfactory underway op test.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 June 2022
Resolved
Each owner or managing operator must develop procedures to routinely examine, maintain, and replace capstans, winches, and other machinery used to connect the towing vessel to the tow. The aft tow winch is not operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 July 2022
Resolved 29 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 24 June 2022
Resolved
The following gauges must be equipped with gauges at the machinery location. The #2 auxiliary generator engine’s lube oil and starboard steering hydraulic oil pressure gauge is unreadable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 June 2022
Resolved
Electrical systems and equipment must function properly and minimize system failures and fire and shock hazards. The potable water pump’s pressure switch is faulty and with an unapproved installation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 June 2022
Resolved
Each towing vessel must have a reliable means to provide notification when an emergency condition exists or an essential system develops problems that require attention. The engine control room alarm panel has 3 extinguished alarm lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
09 - Working and Living Conditions › 092 - Working Conditions › Lighting (Working spaces)
Issued 24 June 2022
Resolved
Sufficient lighting suitable for the marine environment must be provided within crew working and living spaces. Several lights are extinguished in the ships machinery spaces.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 24 June 2022
Resolved
Emergency lighting must be provided for all internal crew working and living areas. Emergency lighting sources must provide for sufficient illumination under emergency conditions to facilitate egress from each space. The emergency lights in the engine room does not provide sufficient lighting to facilitate egress out of the space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
09 - Working and Living Conditions › 092 - Working Conditions › Protection machinery
Issued 24 June 2022
Resolved
All machinery and equipment that is not in proper working order (including missing or malfunctioning guards or safety devices) must be removed; made safe through marking, tagging, or covering; or otherwise made unusable. The machinery space bench grinder is missing its safety shield.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 June 2022
Resolved
Machinery and electrical systems must be designed and maintained to provide for safe operation of the towing vessel and safety of persons on board under normal and emergency conditions. The following items were found to be out of compliance:
1. Port and starboard steering s/w cooler discharge pipes are leaking.
2. Bilge pump discharge pipe has an unapproved repair.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 24 June 2022
Resolved
Each towing vessel must be equipped with an industrial type first aid cabinet or kit, appropriate to the size of the crew and operating conditions. The eyewash in the silent room is expired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 July 2022
Resolved 29 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 6 July 2020
Resolved
Replace all missing covers for propulsion and generator alarms indicators at the bridge control panel.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2020
Resolved 20 July 2020
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 6 July 2020
Resolved
Replace expired eye wash solution in engine control room.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2020
Resolved 20 July 2020
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 6 July 2020
Resolved
Replace damaged pressure gauge on S/W service pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2020
Resolved 20 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 July 2020
Resolved
Trouble shoot and repair fuel governor on #3 ship service generator. Demonstrate proper operation to the satisfaction of the attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2020
Resolved 20 July 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 6 July 2020
Resolved
Install missing valve handle on exhaust soot trap valve for ship service diesel generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 July 2020
Resolved 20 July 2020
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 18 March 2019
Resolved
VSL's Safety Plan fire fighting and life saving appliances is not current with vessel particulars. Update VSL safety plan.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 29 April 2019
Resolution: Corrected
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 March 2019
Resolved
VSL's fire pump has wasted and damaged packing gland fasteners. Repair damaged packing gland and show proper pump operation to attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 12 April 2019
08 - Alarms › N/A - No Subsystem › Fire alarm
Issued 18 March 2019
Resolved
Fire detection in engine room is non operational. Repair fire detector and show proper operations to the attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 29 April 2019
Resolution: Corrected
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 18 March 2019
Resolved
Sewage macerator pump is not operational. Replace faulty macerator pump with in-kind pump.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 29 April 2019
Resolution: Corrected
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 18 March 2019
Resolved
Provide plan for replacing a non CG approve CO2 system with CG approved system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 23 April 2021
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 18 March 2019
Resolved
Provide proof that the installed fire and heat detecting system is approved under UL / FM or CG approved system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 14 November 2019
Resolution: Approved system installed, tested and certified. All sat.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 March 2019
Resolved
Hand rails for pilot board platform are obstructing visibility for navigation lights. Port and starboard running lights must have clear 125 degrees visibility.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 29 April 2019
Resolution: Corrected
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 18 March 2019
Resolved
Life buoy must be fitted with life line that is at least 60FT, non-kinking, be off dark color if synthetic resistant to ultraviolet light deterioration.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 12 April 2019
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 18 March 2019
Resolved
Several alarm lights for engines and generators at the Wheel house are inoperable. Repair lights and show proper operations.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 29 April 2019
Resolution: Corrected
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Inoperable salt water pump on #3 generator. Replace S/W pump with in-kind pump and show proper operation to the attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 29 April 2019
Resolution: Corrected
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Replace existing relief valves on start air accumulators with correct relief valves for air system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 29 April 2019
Resolution: Corrected
04 - Emergency Systems › N/A - No Subsystem › Water level indicator
Issued 18 March 2019
Resolved
AFT STBD engine room bilge high level alarm is not operational. Repair bilge alarm and show proper operation.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 12 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 March 2019
Resolved
Wasted and holed discharged pipe on Aux Sea Water service Pump. Repair damaged pipe and conduct operational test to the satisfaction of the attending MI.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2019
Resolved 12 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 31 January 2019
Resolved
Vessel machinery must be designed and maintained to provide for safe operation of the towing vessel. Vessel port propulsion engine went into shut-down mode during
underway operations. Conduct repairs IAW engine manufacture instructions. Final operational test to the satisfaction of the attending Coast guard Marine inspector.
Action required: 60 - Rectify deficiencies prior to movement
Resolved 7 February 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 24 January 2019
Resolved
Vessel does not meet electrical system requirement in 46 CFR 143.400. Electrical power sources(s) must be capable of carrying electrical loads under normal operating conditions. #3 generator is out of commission due to problem with main breaker and rectifier. Conduct repair IAW manufacture instruction. Examination of repairs and load test will be attested by the attending marine inspector.
Action required: 705 - Other - as specified
Due 24 February 2019
Resolved 30 April 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 December 2018
Resolved
Damaged salt water pump for starboard propulsion engine.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 12 December 2018
Resolution: Rebuild pump installed; Test sat.
Engineering › Diesel Engine (auxiliary) › Pump, High Pressure (fuel injection)
Issued 9 January 2018
Resolved
Fuel pump for #1 generator sustained mechanical failure. Replace fuel pump with in-kind fuel pump.
Action required: 705 - Other - as specified
Resolved 30 April 2019
Electrical › Electric Generation Source (service) › Circuit Breaker
Issued 9 January 2018
Resolved
Breaker for #1 generator unable to hold electrical load, continue to de-energized when breaker is closed. Replace breaker with in-kind breaker.
Action required: 705 - Other - as specified
Resolved 30 April 2019
Operations/Management › Pollution › Retention of Oily Mixture
Issued 21 August 2017
Resolved
Excess Oil in Bilges
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 13 September 2017
Construction/Loadline › Markings › Load Line Mark
Issued 21 August 2017
Resolved
Load Lines submerged.
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 13 September 2017
Engineering › Steering Gear System › Power Unit
Issued 21 August 2017
Resolved
Port Z-drive not fuctioning as designed.
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 13 September 2017
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 21 August 2017
Resolved
Installed toilets are configured to pump raw sewage over side of vessel.
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 13 September 2017
Documentation › Logs/Records › Ballast Water Reporting Form
Issued 21 August 2017
Resolved
Vessel failed to submit required report to NBIC.
Condition: Invalid
Action required: 705 - Other - as specified
Due 21 August 2017
Resolved 13 September 2017